102 resultados para combustione biomasse materiale particolato (PM) idrocarburi policiclici aromatici (IPA) stufe a pellet


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide a summary description of the doctoral thesis investigating the field of project management (PM) deployment. Researchers will be informed of the current contributions within this topic and of the possible further investigations and researches. The decision makers and practitioners will be aware of a set of tools addressing the PM deployment with new perspectives. Design/methodology/approach – Research undertaken with the thesis is based on quantitative methods using time series statistics (time distance analysis) and comparative and correlation analysis aimed to better define and understand the PM deployment within and between countries or groups. Findings – The results suggest a project management deployment index (PMDI) to objectively measure the PM deployment based on the concept of certification. A proposed framework to empirically benchmark the PM deployment between countries by integrating the PMDI time series with the two dimensional comparative analysis of Sicherl. The correlation analysis within Hoftsede cultural framework shows the impact of the national culture dimensions on the PM deployment. The forecasting model shows a general continual growth trend of the PM deployment, with continual increase in the time distance between the countries. Research limitations/implications – The PM researchers are offered an empirical quantification on which they can construct further investigations and understanding of this phenomenon. The number of possible units that can be studied offers wide possibilities to replicate the thesis work. New researches can be undertaken to investigate further the contribution of other social or economical indicators, or to refine and enrich the definition of the PMDI indicator. Practical implications – These results have important implications on the PM deployment approaches. The PMDI measurements and time series comparisons facilitate considerably the measurement and benchmarking between the units (e.g. countries) and against targets, while the readiness setting of the studied unit (in terms of development and cultural levels) impacts the PM deployment within this country. Originality/value – This paper provides a summary of cutting-edge research work in the studied field of PM deployment and a link to the published works that researchers can use to help them understand the thesis research as well as how it can be extended.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background & Aims: Inadequate feeding assistance and mealtime interruptions during hospitalisation may contribute to malnutrition and poor nutritional intake in older people. This study aimed to implement and compare three interventions designed to specifically address mealtime barriers and improve energy intakes of medical inpatients aged ≥65 years. Methods: Pre-post study compared three mealtime assistance interventions: PM: Protected Mealtimes with multidisciplinary education; AIN: additional assistant-in-nursing (AIN) with dedicated meal role; PM+AIN: combined intervention. Dietary intake of 254 patients (pre: n=115, post: n=141; mean age 80±8) was visually estimated on a single day in the first week of hospitalisation and compared with estimated energy requirements. Assistance activities were observed and recorded. Results: Mealtime assistance levels significantly increased in all interventions (p<0.01). Post-intervention participants were more likely to achieve adequate energy intake (OR=3.4, p=0.01), with no difference noted between interventions (p=0.29). Patients with cognitive impairment or feeding dependency appeared to gain substantial benefit from mealtime assistance interventions. Conclusions: Protected Mealtimes and additional AIN assistance (implemented alone or in combination) may produce modest improvements in nutritional intake. Targeted feeding assistance for certain patient groups holds promise; however, alternative strategies are required to address the complex problem of malnutrition in this population.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Recent research indicates that brief periods (60 minutes) of monocular defocus lead to small but significant changes in human axial length. However, the effects of longer periods of defocus on the axial length of human eyes are unknown. We examined the influence of a 12 hour period of monocular myopic defocus on the natural daily variations occurring in axial length and choroidal thickness of young adult emmetropes. A series of axial length and choroidal thickness measurements (collected at ~3 hourly intervals, with the first measurement at ~9 am and the final measurement at ~9 pm) were obtained for 13 emmetropic young adults over three consecutive days. The natural daily rhythms (Day 1, baseline day, no defocus), the daily rhythms with monocular myopic defocus (Day 2, defocus day, +1.50 DS spectacle lens over the right eye), and the recovery from any defocus induced changes (Day 3, recovery day, no defocus) were all examined. Significant variations over the course of the day were observed in both axial length and choroidal thickness on each of the three measurement days (p<0.0001). The magnitude and timing of the daily variations in axial length and choroidal thickness were significantly altered with the monocular myopic defocus on day 2 (p<0.0001). Following the introduction of monocular myopic defocus, the daily peak in axial length occurred approximately 6 hours later, and the peak in choroidal thickness approximately 8.5 hours earlier in the day compared to days 1 and 3 (with no defocus). The mean amplitude (peak to trough) of change in axial length (0.030 ± 0.012 on day 1, 0.020 ± 0.010 on day 2 and 0.033 ± 0.012 mm on day 3) and choroidal thickness (0.030 ± 0.007 on day 1, 0.022 ± 0.006 on day 2 and 0.027 ± 0.009 mm on day 3) were also significantly different between the three days (both p<0.05). The introduction of monocular myopic defocus disrupts the daily variations in axial length and choroidal thickness of human eyes (in terms of both amplitude and timing) that return to normal the following day after removal of the defocus.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

After some years of remarkable growth, the scholarly field of Project Management (PM) research currently finds itself in a crucial stage of development. In this editorial, we make an analysis of submissions to PM's premier specialty journal, the International Journal of Project Management over the period 2007–2010, and argue that one of the most important ways in which PM research can further evolve is to pay more attention to the mundane, yet important, act of good reviewing — an activity that we believe has received relatively little attention in the PM community thus far. Let us begin by considering the crucial juncture that, as a scholarly discipline, PM is currently at. On the one hand, the PM research field is characterized by signs of major progress. For one, there has been a strong growth in terms of published output: recent years have seen the publication of three major edited volumes with a central focus on PM, published by top-tier publishers (Cattani et al., 2011, Kenis et al., 2009 and Morris et al., 2011); the PM/temporary organizations literature published in ISI ranked peer-reviewed articles is growing exponentially (Bakker, 2010); and besides some of the long-standing PM specialty journals, the field has recently seen the rise of a number of new journals, including the International Journal of Managing Projects in Business, the International Journal of Project Organisation and Management, and the Journal of Project, Program, and Portfolio Management.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Preventive Maintenance (PM) is often applied to improve the reliability of production lines. A Split System Approach (SSA) based methodology is presented to assist in making optimal PM decisions for serial production lines. The methodology treats a production line as a complex series system with multiple (imperfect) PM actions over multiple intervals. The conditional and overall reliability of the entire production line over these multiple PM intervals are hierarchically calculated using SSA, and provide a foundation for cost analysis. Both risk-related cost and maintenance-related cost are factored into the methodology as either deterministic or random variables. This SSA based methodology enables Asset Management (AM) decisions to be optimised considering a variety of factors including failure probability, failure cost, maintenance cost, PM performance, and the type of PM strategy. The application of this new methodology and an evaluation of the effects of these factors on PM decisions are demonstrated using an example. The results of this work show that the performance of a PM strategy can be measured by its Total Expected Cost Index (TECI). The optimal PM interval is dependent on TECI, PM performance and types of PM strategies. These factors are interrelated. Generally, it was found that a trade-off between reliability and the number of PM actions needs to be made so that one can minimise Total Expected Cost (TEC) for asset maintenance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper describes the socio-economic and environmental impacts of battery driven Auto Rickshaw at Rajshahi city in Bangladesh. Unemployment problem is one of the major problems in Bangladesh. The number of unemployed people in Bangladesh is 7 lacks. Auto Rickshaw reduces this unemployment problem near about 2%.In this thesis work various questions were asked to the Auto Rickshaw driver in the different point in the Rajshahi city. Then those data were calculated to know their socio economic condition. The average number of passenger per Auto Rickshaw was determined at various places of Rajshahi city (Talaimari mor, Hadir mor, Alupotti, Shaheb bazar zero point, Shodor Hospital mor, Fire brigade mor, CNB mor, Lakshipur mor, Bondo gate, Bornali, Panir tank, Rail gate, Rail Station, Bhodrar mor, Adorsha School mor). Air pollution is a great threat for human health. One of the major causes of the air pollution is the emission from various vehicles, which are running by the burning of the fossil fuel in different internal combustion(IC) engines. All the data’s about emission from various power plants were collected from internet. Then the amounts of emission (CO2, NOX and PM) from different power plant were calculated in terms of kg/km. The energy required by the Auto Rickshaw per km was also calculated. Then the histogram of emission from different vehicles in terms of kg/km was drawn. By analyzing the data and chart, it was found that, battery driven Auto Rickshaw increases income, social status, comfort and decreases unemployment problems.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The role of individuals in the innovation process is highlighted as system integrator and/or champion in literature, however, little is known about championing role of a project manager. Our contention is that the role of the project manager (PM) is essentially of a champion to enable innovation and achieve desired project performance in construction project environment. Hypothesizing that championing behaviour is determined by a number of individual and situational factors, which in turn effects on level of innovation and project performance, we used correlation and regression analysis to test the hypotheses. A survey was carried out with project managers and project team members in 32 building and civil engineering projects in Singapore to test the hypothesized relationships. The results corroborate the importance of championing behaviour to fostering innovation and achieve better project performance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As a novel sensing element, fiber Bragg grating (FBG) is sensitive to both temperature and strain. Basing on this character, high sensitivity FBG temperature sensor can be made. However, as a result of the strain limit of the fiber, the temperature range it can endure is quite narrow. This drawback limits its application and complicates its storage and transport. We design and manufacture a FBG temperature sensor with tunable sensitivity. By tuning its sensitivity, its temperature range is changed, which enlarges its application field, solves the problem of storage and transport, and brighten the future of FBG in temperature measurement. In experiment, by changing the fixing position of the bimetal we tuned the sensitivity of the high sensitivity FBG sensor to different values (-47 pm/℃,-97.7 pm/℃,-153.3 pm/℃).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Basing on the character that Fiber Bragg Grating (FBG) is sensitive to both temperature and strain, by using Al and Fe-Ni alloy’s bimetal structure, we successfully design and manufacture a high accuracy FBG temperature sensor for earthquake premonition. Furthermore, we analyze the accuracy of the FBG sensors with enhanced sensitivity for the first time, and get its accuracy is up to ±0.05℃ with highest resolution ever in all FBG temperature sensors (0.0014℃/pm). This work experimentally proves the feasibility of using FBG in the earthquake premonition monitoring, and builds the foundation for the application of optic technology in earthquake premonition monitoring.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Research in construction innovation highlights construction industry as having many barriers and resistance to innovations and suggests that it needs champions. A hierarchical structural model is presented, to assess the impact of the role of the project manager (PM) on the levels of innovation and project performance. The model adopts the structural equation modelling technique and uses the survey data collected from PMs and project team members working for general contractors in Singapore. The model fits well to the observed data, accounting for 24%, 37% and 49% of the variance in championing behaviour, the level of innovation and project performance, respectively. The results of this study show the importance of the championing role of PMs in construction innovation. However, in order to increase their effectiveness, such a role should be complemented by their competency and professionalism, tactical use of influence tactics, and decision authority. Moreover, senior management should provide adequate resources and a sustained support to innovation and create a conducive environment or organizational culture that nurtures and facilitates the PM’s role in the construction project as a champion of innovation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Oxidative stress caused by generation of free radicals and related reactive oxygen species (ROS) at the sites of deposition has been proposed as a mechanism for many of the adverse health outcomes associated with exposure to particulate matter (PM). Recently, a new profluorescent nitroxide molecular probe (BPEAnit) developed at QUT was applied in an entirely novel, rapid and non-cell based assay for assessing the oxidative potential of particles (i.e. potential of particles to induce oxidative stress). The technique was applied on particles produced by several combustion sources, namely cigarette smoke, diesel exhaust and wood smoke. One of the main findings from the initial studies undertaken at QUT was that the oxidative potential per PM mass significantly varies for different combustion sources as well as the type of fuel used and combustion conditions. However, possibly the most important finding from our studies was that there was a strong correlation between the organic fraction of particles and the oxidative potential measured by the PFN assay, which clearly highlights the importance of organic species in particle-induced toxicity.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose - The paper aims to improve consumer awareness of the complexities of community living. It does this by clarifying how living in a managed community is different from a ‘traditional’ neighbourhood; and identifying matters that can become disputes Design/methodology/approach - The paper builds on research by other authors into strata scheme disputes by examining recent Queensland cases. Findings - Many disputes appear to result from a lack of understanding of the complexities of community living. Matters that should be able to be easily resolved are therefore escalated to formal disputes. Research limitations/implications - The paper considers law and cases from Queensland. The types of matters considered, however, are relevant for any managed community and therefore the research is relevant for all jurisdictions. The research will be of particular interest to jurisdictions looking to boost living density by increasing the development of managed communities. Practical implications - The research will assist in consumer transactions by providing guidance as to the matters to be considering prior to moving into a managed community. More informed decision making by prospective residents will lead to a decreased likelihood of disputes arising. Originality/value - The paper is an up-to-date consideration of the issues arising from community living. It highlights the benefits arising from increased consumer awareness of the complexities of community living and the potential for consumer education to reduce the number of disputes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Numbers of diesel engines in both stationary and mobile applications are increasing nowadays. Diesel engines emit lower Hydrocarbon (HC) and Carbon monoxide (CO) than gasoline engines. However, they can produce more nitrogen oxides (NOx) and have higher particulate matter (PM). On the other hand, emissions standards are getting stringent day by day due to considerable concerns about unregulated pollutants and particularly ultrafine particles deleterious effect on human health. Non-thermal plasma (NTP) treatment of exhaust gas is known as a promising technology for both NOx and PM reduction by introducing plasma inside the exhaust gas. Vehicle exhaust gases undergo chemical changes when exposed to plasma. In this study, the PM removal mechanism using NTP by applying high voltage pulses of up to 20 kVpp with a repetition rate of 10 kHz are investigated. It is found that, voltage increase not necessarily has a positive effect on PM removal in diesel engine emissions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

It is well known that a broad range of ocular anatomical and physiological parameters undergo significant diurnal variation. However, the natural diurnal variations that occur in the length of the human eye (axial length) and their underlying causes have been less well studied. Improvements in optical methods for the measurement of ocular biometrics now allow more precise and comprehensive measurements of axial length to be performed than has previously been possible. Research from animal models also suggests a link between diurnal axial length variations and longer term myopic eye growth, and that retinal image defocus can disrupt these diurnal rhythms in axial length. This research programme has examined the diurnal variations in axial length in young normal eyes, the contributing components and the influence of optical stimuli on these changes. In the first experiment, the normal pattern and consistency of the diurnal variations in axial length were examined at 10 different times (5 measurements each day, at ~ 3-hour intervals from ~ 9 am to ~ 9 pm) over 2 consecutive days on 30 young adult subjects (15 myopes, 15 emmetropes). Additionally, variations in a range of other ocular biometric measurements such as choroidal thickness, intraocular pressure, and other ocular biometrics were also explored as potential factors that may be associated with the observed variations in axial length. To investigate the potential influence of refractive error on diurnal axial length variations, the differences in the magnitude and pattern of diurnal variations in axial length between the myopic and emmetropic subjects were examined. Axial length underwent significant diurnal variation that was consistently observed over the 2 consecutive days of measurements, with the longest axial length typically occurring during the day, and the shortest at night. Significant diurnal variations were also observed in choroidal thickness, IOP and other ocular biometrics (such as central corneal thickness, anterior chamber depth and vitreous chamber depth) of the eye. Diurnal variations in vitreous chamber depth, IOP (positive associations) and choroidal thickness (negative association) were all significantly correlated with the diurnal changes in axial length. Choroidal thickness was found to fluctuate approximately in antiphase to the axial length changes, with the average timing of the longest axial length coinciding with the thinnest choroid and vice versa. There were no significant differences in the ocular diurnal variations associated with refractive error. Given that the diurnal changes in axial length could be associated with the changes in the eye’s optical quality, whether the optical quality of the eye also undergoes diurnal variation in the same cohort of young adult myopes and emmetropes over 2 consecutive days was also examined. Significant diurnal variations were observed only in the best sphere refraction (power vector M) and in the spherical aberration of the eye over two consecutive days of testing. The changes in the eyes lower and higher order ocular optics were not significantly associated with the diurnal variations in axial length and the other measured ocular biometric parameters. No significant differences were observed in the magnitude and timing of diurnal variations in lower-order and higher-order optics associated with refractive error. Since the small natural fluctuations in the eye’s optical quality did not appear to be sufficient to influence the natural diurnal fluctuations in ocular biometric parameters, in the next experiment, the influence of monocular myopic defocus (+1.50 DS) upon the normal diurnal variations in axial length and choroidal thickness of young adult emmetropic human subjects (n=13) imposed over a 12 hour period was examined. A series of axial length and choroidal thickness measurements (collected at ~3 hourly intervals, with the first measurement at ~9 am and the final measurement at ~9 pm) were obtained over three consecutive days. The natural diurnal rhythms (Day 1, no defocus), diurnal rhythms with monocular myopic defocus (Day 2, +1.50 DS spectacle lens over the right eye), and the recovery from any defocus induced changes (Day 3, no defocus) were examined. Significant diurnal variations over the course of the day were observed in both axial length and choroidal thickness on each of the three measurement days. The introduction of monocular myopic defocus led to significant reductions in the mean amplitude of diurnal change, and phase shifts in the peak timing of the diurnal rhythms in axial length and choroidal thickness. These defocus induced changes were found to be transient in nature and returned to normal the day following removal of the defocus. To further investigate the influence of optical stimuli on human diurnal rhythms, in the final experiment, the influence of monocular hyperopic defocus on the normal diurnal rhythms in axial length and choroidal thickness was examined in young adult emmetropic subjects (n=15). Similar to the previous experiment, the natural diurnal rhythms (Day 1, no defocus), diurnal rhythms with monocular hyperopic defocus (Day 2, -2.00 DS spectacle lens over the right eye), and the recovery from any defocus induced changes (Day 3, no defocus) were examined over three consecutive days. Both axial length and choroidal thickness underwent significant diurnal variations on each of the three days. The introduction of monocular hyperopic defocus resulted in a significant increase in the amplitude of diurnal change, but no change in the peak timing of diurnal rhythms in both parameters. The ocular changes associated with hyperopic defocus returned to normal, the day following removal of the defocus. This research has shown that axial length undergoes significant diurnal variation in young adult human eyes, and has shown that the natural diurnal variations in choroidal thickness and IOP are significantly associated, and may underlie these diurnal fluctuations in axial length. This work also demonstrated for the first time that exposing young human eyes to monocular myopic and hyperopic defocus leads to a significant disruption in the normal diurnal rhythms of axial length and choroidal thickness. These changes in axial length with defocus may reflect underlying mechanisms in the human eye that are involved in the regulation of longer term eye growth.