323 resultados para Railway Capacity


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: The Functional Capacity Index (FCI) was designed to predict physical function 12 months after injury. We report a validation study of the FCI. Methods: This was a consecutive case series registered in the Queensland Trauma Registry who consented to the prospective 12-month telephone-administered follow-up study. FCI scores measured at 12 months were compared with those originally predicted. Results: Complete Abbreviated Injury Scale score information was available for 617 individuals, of whom 587 (95%) could be assigned at least one FCI score (range, 1-17). Agreement between the largest predicted FCI and observed FCI score was poor ([kappa] = 0.05; 95% confidence interval, 0.00-0.10) and explained only 1% of the variability in observed FCI. Using an encompassing model that included all FCI assignments, agreement remained poor ([kappa] = 0.05; 95% confidence interval, -0.02-0.12), and the model explained only 9% of the variability in observed FCI. Conclusion: The predicted functional capacity poorly agrees with actual functional outcomes. Further research should consider including other (noninjury) explanatory factors in predicting FCI at 12 months.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public and private sector organisations worldwide are putting strategies in place to manage the commercial and operational risks of climate change. However, community organisations are lagging behind in their understanding and preparedness, despite them being among the most exposed to the effects of climate change impacts and regulation. This poster presents a proposal for a multidisciplinary study that addresses this issue by developing, testing and applying a novel climate risk assessment methodology that is tailored to the needs of Australia’s community sector and its clients. Strategies to mitigate risks and build resilience and adaptive capacity will be identified including new opportunities afforded by urban informatics, social media, and technologies of scale making.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The International Network of Indigenous Health Knowledge and Development (INIHKD) Conference was held from Monday 24 May to Friday 28 May 2010 at Kiana Lodge, Port Madison Indian Reservation, Suquamish Nation, Washington State, United States of America. The overall theme for the 4th Biennial Conference was ‘Knowing Our Roots: Indigenous Medicines, Health Knowledges and Best Practices’.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis reports on the investigations, simulations and analyses of novel power electronics topologies and control strategies. The research is financed by an Australian Research Council (ARC) Linkage (07-09) grant. Therefore, in addition to developing original research and contributing to the available knowledge of power electronics, it also contributes to the design of a DC-DC converter for specific application to the auxiliary power supply in electric trains. Specifically, in this regard, it contributes to the design of a 7.5 kW DC-DC converter for the industrial partner (Schaffler and Associates Ltd) who supported this project. As the thesis is formatted as a ‘thesis by publication’, the contents are organized around published papers. The research has resulted in eleven papers, including seven peer reviewed and published conference papers, one published journal paper, two journal papers accepted for publication and one submitted journal paper (provisionally accepted subject to few changes). In this research, several novel DC-DC converter topologies are introduced, analysed, and tested. The similarity of all of the topologies devised lies in their ‘current circulating’ switching state, which allows them to store some energy in the inductor, as extra inductor current. The stored energy may be applied to enhance the performance of the converter in the occurrence of load current or input voltage disturbances. In addition, when there is an alternating load current, the ability to store energy allows the converter to perform satisfactorily despite frequently and highly varying load current. In this research, the capability of current storage has been utilised to design topologies for specific applications, and the enhancement of the performance of the considered applications has been illustrated. The simplest DC-DC converter topology, which has a ‘current circulating’ switching state, is the Positive Buck-Boost (PBB) converter (also known as the non-inverting Buck-Boost converter). Usually, the topology of the PBB converter is operating as a Buck or a Boost converter in applications with widely varying input voltage or output reference voltage. For example, in electric railways (the application of our industrial partner), the overhead line voltage alternates from 1000VDC to 500VDC and the required regulated voltage is 600VDC. In the course of this research, our industrial partner (Schaffler and Associates Ltd) industrialized a PBB converter–the ‘Mudo converter’–operating at 7.5 kW. Programming the onboard DSP and testing the PBB converter in experimental and nominal power and voltage was part of this research program. In the earlier stages of this research, the advantages and drawbacks of utilization of the ‘current circulating’ switching state in the positive Buck-Boost converter were investigated. In brief, the advantages were found to be robustness against input voltage and current load disturbances, and the drawback was extra conduction and switching loss. Although the robustness against disturbances is desirable for many applications, the price of energy loss must be minimized to attract attention to the utilization of the PBB converter. In further stages of this research, two novel control strategies for different applications were devised to minimise the extra energy loss while the advantages of the positive Buck-Boost converter were fully utilized. The first strategy is Smart Load Controller (SLC) for applications with pre-knowledge or predictability of input voltage and/or load current disturbances. A convenient example of these applications is electric/hybrid cars where a master controller commands all changes in loads and voltage sources. Therefore, the master controller has a pre-knowledge of the load and input voltage disturbances so it can apply the SLC strategy to utilize robustness of the PBB converter. Another strategy aiming to minimise energy loss and maximise the robustness in the face of disturbance is developed to cover applications with unexpected disturbances. This strategy is named Dynamic Hysteresis Band (DHB), and is used to manipulate the hysteresis band height after occurrence of disturbance to reduce dynamics of the output voltage. When no disturbance has occurred, the PBB converter works with minimum inductor current and minimum energy loss. New topologies based on the PBB converter have been introduced to address input voltage disturbances for different onboard applications. The research shows that the performance of applications of symmetrical/asymmetrical multi-level diode-clamped inverters, DC-networks, and linear-assisted RF amplifiers may be enhanced by the utilization of topologies based on the PBB converter. Multi-level diode-clamped inverters have the problem of DC-link voltage balancing when the power factor of their load closes to unity. This research has shown that this problem may be solved with a suitable multi-output DC-DC converter supplying DClink capacitors. Furthermore, the multi-level diode-clamped inverters supplied with asymmetrical DC-link voltages may improve the quality of load voltage and reduce the level of Electromagnetic Interference (EMI). Mathematical analyses and experiments on supplying symmetrical and asymmetrical multi-level inverters by specifically designed multi-output DC-DC converters have been reported in two journal papers. Another application in which the system performance can be improved by utilization of the ‘current circulating’ switching state is linear-assisted RF amplifiers in communicational receivers. The concept of ‘linear-assisted’ is to divide the signal into two frequency domains: low frequency, which should be amplified by a switching circuit; and the high frequency domain, which should be amplified by a linear amplifier. The objective is to minimize the overall power loss. This research suggests using the current storage capacity of a PBB based converter to increase its bandwidth, and to increase the domain of the switching converter. The PBB converter addresses the industrial demand for a DC-DC converter for the application of auxiliary power supply of a typical electric train. However, after testing the industrial prototype of the PBB converter, there were some voltage and current spikes because of switching. To attenuate this problem without significantly increasing the switching loss, the idea of Active Gate Signalling (AGS) is presented. AGS suggests a smart gate driver that selectively controls the switching process to reduce voltage/current spikes, without unacceptable reduction in the efficiency of switching.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The global impact of an ever-increasing population-base combined with dangerously depleted natural resources highlights the urgent need for changes in human lifestyles and land-use patterns. To achieve more equitable and sustainable land use, it is imperative that populations live within the carrying capacity of their natural assets in a manner more accountable to and ethically responsible for the land which sustains them. Our society’s very survival may well depend on worldwide acceptance of the carrying capacity imperative as a principle of personal, political, economic, educational and planning responsibility. This theoretically-focused research identifies, examines and compares a range of methodological approaches to carrying capacity assessment and considers their relevance to future spatial planning. It also addresses existing gaps in current methodologies and suggests avenues for improvement. A set of eleven key criteria are employed to compare various existing carrying capacity assessment models. These criteria include whole-systems analysis, dynamic responses, levels of impact and risk, systemic constraints, applicability to future planning and the consideration of regional and local boundary delineation. This research finds that while some existing methodologies offer significant insights into the assessment of population carrying capacities, a comprehensive model is yet to be developed. However, it is suggested that by combining successful components from various authors, and collecting a range of interconnected data, a practical and workable systems-based model may be achievable in the future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

While some existing carrying capacity methodologies offer significant insights into the assessment of population carrying capacities, a comprehensive model is yet to be developed. This research identifies, examines and compares a range of methodological approaches to carrying capacity assessment and considers their relevance to future spatial planning. A range of key criteria are employed to compare various existing carrying capacity assessment models. These criteria include integrated systems analysis, dynamic responses, levels of risk, systemic constraints, applicability to future planning and the consideration of regional boundary delineation. It is suggested that by combining successful components from various authors, and collecting a range of interconnected data, a practical and workable system-based model may be achievable in the future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building for a sustainable environment requires sustainable infrastructure assets. Infrastructure capacity management is the process of ensuring optimal provision of such infrastructure assets. Effectiveness in this process will enable the infrastructure asset owners and its stakeholders to receive full value on their investment. Business research has shown that an organisation can only achieve business value when it has the right capabilities. This paradigm can also be applied to infrastructure capacity management. With limited access to resources, the challenge for infrastructure organisations is to identify and develop core capabilities to enable infrastructure capacity management. This chapter explores the concept of capability and identifies the core capability needed in infrastructure capacity management. Through a case study of the Port of Brisbane, this chapter shows that infrastructure organisations must develop their intelligence gathering capability to effectively manage the capacity of their infrastructure assets.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

• Mechanisms to facilitate consent to healthcare for adults who lack capacity are necessary to ensure that these adults can lawfully receive appropriate medical treatment when needed. • In Australia, the common law plays only a limited role in this context, through its recognition of advance directives and through the parens patriae jurisdiction of superior courts. • Substitute decision-making for adults who lack capacity is facilitated primarily by guardianship and other related legislation. This legislation, which has been enacted in all Australian States and Territories, permits a range of decision-makers to make different types of healthcare decisions. • Substitute decision-makers can be appointed by the adult or by a guardianship or other tribunal. Where there is no appointed decision-maker, legislation generally empowers those close to the adult to make the relevant decision. Most Australian jurisdictions have also provided for statutory advance directives. • For the most serious of decisions, such as non-therapeutic sterilisations, consent can only be provided by a Tribunal. Other decisions can generally be made by a range of substitute decision-makers. Some treatment, such as very minor treatment or that which is needed in an emergency, can be provided without consent. • Guardianship legislation generally establishes a set of principles and/or other criteria to guide healthcare decisions. Mechanisms to resolve disputes as to who is the appropriate decision-maker and how a decision should be made have also been established.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The analysis of investment in the electric power has been the subject of intensive research for many years. The efficient generation and distribution of electrical energy is a difficult task involving the operation of a complex network of facilities, often located over very large geographical regions. Electric power utilities have made use of an enormous range of mathematical models. Some models address time spans which last for a fraction of a second, such as those that deal with lightning strikes on transmission lines while at the other end of the scale there are models which address time horizons consisting of ten or twenty years; these usually involve long range planning issues. This thesis addresses the optimal long term capacity expansion of an interconnected power system. The aim of this study has been to derive a new, long term planning model which recognises the regional differences which exist for energy demand and which are present in the construction and operation of power plant and transmission line equipment. Perhaps the most innovative feature of the new model is the direct inclusion of regional energy demand curves in the nonlinear form. This results in a nonlinear capacity expansion model. After review of the relevant literature, the thesis first develops a model for the optimal operation of a power grid. This model directly incorporates regional demand curves. The model is a nonlinear programming problem containing both integer and continuous variables. A solution algorithm is developed which is based upon a resource decomposition scheme that separates the integer variables from the continuous ones. The decompostion of the operating problem leads to an interactive scheme which employs a mixed integer programming problem, known as the master, to generate trial operating configurations. The optimum operating conditions of each trial configuration is found using a smooth nonlinear programming model. The dual vector recovered from this model is subsequently used by the master to generate the next trial configuration. The solution algorithm progresses until lower and upper bounds converge. A range of numerical experiments are conducted and these experiments are included in the discussion. Using the operating model as a basis, a regional capacity expansion model is then developed. It determines the type, location and capacity of additional power plants and transmission lines, which are required to meet predicted electicity demands. A generalised resource decompostion scheme, similar to that used to solve the operating problem, is employed. The solution algorithm is used to solve a range of test problems and the results of these numerical experiments are reported. Finally, the expansion problem is applied to the Queensland electricity grid in Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The analysis of investment in the electric power has been the subject of intensive research for many years. The efficient generation and distribution of electrical energy is a difficult task involving the operation of a complex network of facilities, often located over very large geographical regions. Electric power utilities have made use of an enormous range of mathematical models. Some models address time spans which last for a fraction of a second, such as those that deal with lightning strikes on transmission lines while at the other end of the scale there are models which address time horizons consisting of ten or twenty years; these usually involve long range planning issues. This thesis addresses the optimal long term capacity expansion of an interconnected power system. The aim of this study has been to derive a new, long term planning model which recognises the regional differences which exist for energy demand and which are present in the construction and operation of power plant and transmission line equipment. Perhaps the most innovative feature of the new model is the direct inclusion of regional energy demand curves in the nonlinear form. This results in a nonlinear capacity expansion model. After review of the relevant literature, the thesis first develops a model for the optimal operation of a power grid. This model directly incorporates regional demand curves. The model is a nonlinear programming problem containing both integer and continuous variables. A solution algorithm is developed which is based upon a resource decomposition scheme that separates the integer variables from the continuous ones. The decompostion of the operating problem leads to an interactive scheme which employs a mixed integer programming problem, known as the master, to generate trial operating configurations. The optimum operating conditions of each trial configuration is found using a smooth nonlinear programming model. The dual vector recovered from this model is subsequently used by the master to generate the next trial configuration. The solution algorithm progresses until lower and upper bounds converge. A range of numerical experiments are conducted and these experiments are included in the discussion. Using the operating model as a basis, a regional capacity expansion model is then developed. It determines the type, location and capacity of additional power plants and transmission lines, which are required to meet predicted electicity demands. A generalised resource decompostion scheme, similar to that used to solve the operating problem, is employed. The solution algorithm is used to solve a range of test problems and the results of these numerical experiments are reported. Finally, the expansion problem is applied to the Queensland electricity grid in Australia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Capacity reduction programs in the form of buybacks or decommissioning programs have had relatively widespread application in fisheries in the US, Europe and Australia. A common criticism of such programs is that they remove the least efficient vessels first, resulting in an increase in average efficiency of the remaining fleet. The effective fishing power of the fleet, therefore, does not decrease in proportion to the number of vessels removed. Further, reduced crowding may increase efficiency of the remaining vessels. In this paper, the effects of a buyback program on average technical efficiency in Australia’s Northern Prawn Fishery are examined using a multi-output distance function approach with an explicit inefficiency model. The results indicate that average efficiency of the remaining vessels was greater than that of the removed vessels, and that average efficiency of remaining vessels also increased as a result of reduced crowding.