108 resultados para Photovoltaic power generation


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Determination of the placement and rating of transformers and feeders are the main objective of the basic distribution network planning. The bus voltage and the feeder current are two constraints which should be maintained within their standard range. The distribution network planning is hardened when the planning area is located far from the sources of power generation and the infrastructure. This is mainly as a consequence of the voltage drop, line loss and system reliability. Long distance to supply loads causes a significant amount of voltage drop across the distribution lines. Capacitors and Voltage Regulators (VRs) can be installed to decrease the voltage drop. This long distance also increases the probability of occurrence of a failure. This high probability leads the network reliability to be low. Cross-Connections (CC) and Distributed Generators (DGs) are devices which can be employed for improving system reliability. Another main factor which should be considered in planning of distribution networks (in both rural and urban areas) is load growth. For supporting this factor, transformers and feeders are conventionally upgraded which applies a large cost. Installation of DGs and capacitors in a distribution network can alleviate this issue while the other benefits are gained. In this research, a comprehensive planning is presented for the distribution networks. Since the distribution network is composed of low and medium voltage networks, both are included in this procedure. However, the main focus of this research is on the medium voltage network planning. The main objective is to minimize the investment cost, the line loss, and the reliability indices for a study timeframe and to support load growth. The investment cost is related to the distribution network elements such as the transformers, feeders, capacitors, VRs, CCs, and DGs. The voltage drop and the feeder current as the constraints are maintained within their standard range. In addition to minimizing the reliability and line loss costs, the planned network should support a continual growth of loads, which is an essential concern in planning distribution networks. In this thesis, a novel segmentation-based strategy is proposed for including this factor. Using this strategy, the computation time is significantly reduced compared with the exhaustive search method as the accuracy is still acceptable. In addition to being applicable for considering the load growth, this strategy is appropriate for inclusion of practical load characteristic (dynamic), as demonstrated in this thesis. The allocation and sizing problem has a discrete nature with several local minima. This highlights the importance of selecting a proper optimization method. Modified discrete particle swarm optimization as a heuristic method is introduced in this research to solve this complex planning problem. Discrete nonlinear programming and genetic algorithm as an analytical and a heuristic method respectively are also applied to this problem to evaluate the proposed optimization method.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Carbon Capture and Storage (CCS) is a critical part of the global effort to address climate change as CCS has the potential to achieve deep cuts in CO2 emissions to atmosphere from the use of fossil fuels. In this context, pre-combustion capture through Integrated Gasification Combined Cycle (IGCC) power plants with CCS is one of the key pathways to low emissions power generation. There are, however, very significant challenges to the development, commercialization and deployment of IGCC with CCS technologies. This article examines matters of cost, the need for government support to early movers, the attribution of economic value for carbon dioxide and various other regulatory, policy, technical and infrastructural barriers to the development and subsequent deployment of this low emissions coal technology option.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Many people take pleasure in visiting waterfalls and much has been written on the subject. Numerous accounts of Niagara Falls were published after Hennepin's late seventeenth-centure descriptions, particularly from the early nineteenth century, but is was only later that other waterfalls became the subject of books. George Holley's Niagara and Other Famous Cataracts of the World, published in 1883, and John Gibson's Great Waterfalls, Cataracts and Geysers, published in 1887, are early examples of global accounts of major falls. Most books about waterfalls are guides to the falls of a particular country, state or region. Apart from a few slim illustrated volumes, few books have been puslished on the world's waterfalls since Edward Rashleigh's Among the Waterfalls (1935). Most of these are slim pictorial volumes, some aimed at the children's market. Geologist Richard Maxwell Pearl published a series of waterfall articles in his journal Earth Science between 1973 and 1975, apparently with the intention of turning them into a book, but this never materialized. My book, the culmination of more than a decade of waterfalls research, is comprehensive in its approach, but is not intended to describe as many of the world's waterfalls as possible. This is far from my aim, and readers may be disappointed at my omission of falls they feel deserved mention. What I have attempted to do is celebrate the delights of these beautiful wonders of nature by considering them from many points of view, emphasizing the roles that they play in the human experience. To be as representative as possible, I draw on examples of waterfalls from all over the world, some famous, many not. North and South America, Europe, Africa, Asia and Oceania and, with recent global warming, the Earth's polar regions, all feature in the discussion. Even though there are already enough books and articles about Niagara Falls to fill a large library, it has been impossible to avoid making frequent reference to this great cataract, which has been so important in the history of travel and tourism, power generation, urban development and art. Amoung the issues that I consider is the human impact on waterfalls, particularly the effects of hydropower schemes and tourism development. Also considered are artificial waterfalls, which have long been features of the designed landscape. Their contemporay role is poignantly exemplified in the design of the National September 11 Memorial, in which the footprints of the Twin Towers are traced by walls of waterfalls. A geographer and urban and regional planner by training, I have ventured into many other fields of knowledge that are outside my areas of expertise. I apologize for any errors that I may have made in my book and invite correction.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper addresses the snap of renewable energy and the need for effective progress strategies linked with sustainable energy development along with prospect of renewable energy in Bangladesh. Our country is gifted with vast renewable energy resources such as biomass and solar. Approximately 73% of total energy demand of the country is supplied by local biomass based fuels. Bangladesh is endowed with abundant supplies of solar energy. Annually about 1.9 MWh energy is received per square meter of horizontal area in Bangladesh. Besides, hydro and wind as well as geothermal power can be considered as potential renewable energy resources. Karnafuli Hydro Station is the merely hydro energy power generation plant of the country that generates 230 MW. The annual wind speed at a height of 25m at some coastal locations is above 5 m/s and much higher in the pre-monsoon and monsoon periods.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Given the paradigm of smart grid as the promising backbone for future network, this paper uses this paradigm to propose a new coordination approach for LV network based on distributed control algorithm. This approach divides the LV network into hierarchical communities where each community is controlled by a control agent. Different level of communication has been proposed for this structure to control the network in different operation modes.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents a new approach for network upgrading to improve the penetration level of Small Scale Generators in residential feeders. In this paper, it is proposed that a common DC link can be added to LV network to alleviate the negative impact of increased export power on AC lines, allowing customers to inject their surplus power with no restrictions to the common DC link. In addition, it is shown that the proposed approach can be a pathway from current AC network to future DC network.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Capacity probability models of generating units are commonly used in many power system reliability studies, at hierarchical level one (HLI). Analytical modelling of a generating system with many units or generating units with many derated states in a system, can result in an extensive number of states in the capacity model. Limitations on available memory and computational time of present computer facilities can pose difficulties for assessment of such systems in many studies. A cluster procedure using the nearest centroid sorting method was used for IEEE-RTS load model. The application proved to be very effective in producing a highly similar model with substantially fewer states. This paper presents an extended application of the clustering method to include capacity probability representation. A series of sensitivity studies are illustrated using IEEE-RTS generating system and load models. The loss of load and energy expectations (LOLE, LOEE), are used as indicators to evaluate the application

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Tilting-pad hydrodynamic thrust bearings are used in hydroelectric power stations around the world, reliably supporting turbines weighing hundreds of tonnes, over decades of service. Newer designs incorporate hydrostatic recesses machined into the sector-shaped pads to enhance oil film thickness at low rotational speeds. External pressurisation practically eliminates wear and enhances service life and reliability. It follows that older generating plants, lacking such assistance, stand to benefit from being retrofitted with hydrostatic lubrication systems. The design process is not trivial however. The need to increase the groove size to permit spontaneous lifting of the turbine under hydrostatic pressure, conflicts with the need to preserve performance of the original plane pad design. A haphazardly designed recess can induce a significant rise in bearing temperature concomitant with reduced mechanical efficiency and risk of thermal damage. In this work, a numerical study of a sector-shaped pad is undertaken to demonstrate how recess size and shape can affect the performance of a typical bearing.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Single phase distributed energy resources (DERs) can cause voltage rise along distribution feeder and power imbalance among the phases. Usually transformer tap setting are used to mitigate voltage drop along feeders. However this can aggravate the voltage rise problem when DERs are connected. Moreover if the power generation in a phase is more than its load demand, the excess power in that phase will be fed back to the transmission network. In this paper, a unified power quality compensator (UPQC) has been utilized to alleviate the voltage quality excess power circulation problems. Through analysis and simulation results, the mode of operation of UPQC is highlighted. The proposals are validated through extensive digital computer simulation studies using PSCAD and MATLAB.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

To minimise the number of load sheddings in a microgrid (MG) during autonomous operation, islanded neighbour MGs can be interconnected if they are on a self-healing network and an extra generation capacity is available in the distributed energy resources (DER) of one of the MGs. In this way, the total load in the system of interconnected MGs can be shared by all the DERs within those MGs. However, for this purpose, carefully designed self-healing and supply restoration control algorithm, protection systems and communication infrastructure are required at the network and MG levels. In this study, first, a hierarchical control structure is discussed for interconnecting the neighbour autonomous MGs where the introduced primary control level is the main focus of this study. Through the developed primary control level, this study demonstrates how the parallel DERs in the system of multiple interconnected autonomous MGs can properly share the load of the system. This controller is designed such that the converter-interfaced DERs operate in a voltage-controlled mode following a decentralised power sharing algorithm based on droop control. DER converters are controlled based on a per-phase technique instead of a conventional direct-quadratic transformation technique. In addition, linear quadratic regulator-based state feedback controllers, which are more stable than conventional proportional integrator controllers, are utilised to prevent instability and weak dynamic performances of the DERs when autonomous MGs are interconnected. The efficacy of the primary control level of the DERs in the system of multiple interconnected autonomous MGs is validated through the PSCAD/EMTDC simulations considering detailed dynamic models of DERs and converters.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents a new hybrid evolutionary algorithm based on Particle Swarm Optimization (PSO) and Ant Colony Optimization (ACO) for daily Volt/Var control in distribution system including Distributed Generators (DGs). Due to the small X/R ratio and radial configuration of distribution systems, DGs have much impact on this problem. Since DGs are independent power producers or private ownership, a price based methodology is proposed as a proper signal to encourage owners of DGs in active power generation. Generally, the daily Volt/Var control is a nonlinear optimization problem. Therefore, an efficient hybrid evolutionary method based on Particle Swarm Optimization and Ant Colony Optimization (ACO), called HPSO, is proposed to determine the active power values of DGs, reactive power values of capacitors and tap positions of transformers for the next day. The feasibility of the proposed algorithm is demonstrated and compared with methods based on the original PSO, ACO and GA algorithms on IEEE 34-bus distribution feeder.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents a new algorithm based on honey-bee mating optimization (HBMO) to estimate harmonic state variables in distribution networks including distributed generators (DGs). The proposed algorithm performs estimation for both amplitude and phase of each harmonics by minimizing the error between the measured values from phasor measurement units (PMUs) and the values computed from the estimated parameters during the estimation process. Simulation results on two distribution test system are presented to demonstrate that the speed and accuracy of proposed distribution harmonic state estimation (DHSE) algorithm is extremely effective and efficient in comparison with the conventional algorithms such as weight least square (WLS), genetic algorithm (GA) and tabu search (TS).

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents an efficient hybrid evolutionary optimization algorithm based on combining Ant Colony Optimization (ACO) and Simulated Annealing (SA), called ACO-SA, for distribution feeder reconfiguration (DFR) considering Distributed Generators (DGs). Due to private ownership of DGs, a cost based compensation method is used to encourage DGs in active and reactive power generation. The objective function is summation of electrical energy generated by DGs and substation bus (main bus) in the next day. The approach is tested on a real distribution feeder. The simulation results show that the proposed evolutionary optimization algorithm is robust and suitable for solving DFR problem.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Since Queensland Wire Industries Pty Ltd v Broken Hill Pty Co Ltd (1989) 167 CLR 177 it has been recognised that corporations with substantial market power are subject to special responsibilities and restraints that corporations without market power are not. In NT Power Generation Pty Ltd v Power and Water Authority (2004) 219 CLR 90 McHugh A-CJ, Gummow, Callinan and Heydon JJ in their joint reasons stated (at [76]), that s 46 of the Competition and Consumer Act 2010 (Cth) (CCA) can operate not only to prevent firms with substantial market power from doing prohibited things, but also compel them positively to do things they do not want to do. Their Honours also stated (at [126]) that the proposition that a private property owner who declines to permit competitors to use the property is immune from s 46 is “intrinsically unsound”. However, the circumstances in which a firm with substantial power must accommodate competitors, and private property rights give way to the public interest are uncertain. The purpose of this Note is to consider recent developments in two areas of the CCA where the law requires private property rights to give way to the public interest. The first part of the Note considers two recent cases which clarify the circumstances in which s 46 of the CCA can be used to compel a firm with substantial market power to accommodate a competitor and allow the competitor to make use of private property rights in the public interest. Secondly, on 12 February 2014 the Minister for Small Business, the Hon Bruce Billson,released the Productivity Commission’s Final Report, on the National Access Regime in Pt IIIA of the CCA (National Access Regime, Inquiry Report No 66, Canberra). Pt IIIA provides for the processes by which third parties may obtain access to infrastructure owned by others in the public interest. The Report recommends that Pt IIIA be retained but makes a number of suggestions for its reform, some of which will be briefly considered.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper introduces a novel cage induction generator and presents a mathematical model, through which its behavior can be accurately predicted. The proposed generator system employs a three-phase cage induction machine and generates single-phase and constant-frequency electricity at varying rotor speeds without an intermediate inverter stage. The technique uses any one of the three stator phases of the machine as the excitation winding and the remaining two phases, which are connected in series, as the power winding. The two-series-connected-and-one-isolated (TSCAOI) phase winding configuration magnetically decouples the two sets of windings, enabling independent control. Electricity is generated through the power winding at both sub- and super-synchronous speeds with appropriate excitation to the isolated single winding at any frequency of generation. A dynamic mathematical model, which accurately predicts the behavior of the proposed generator, is also presented and implemented in MATLAB/Simulink. Experimental results of a 2-kW prototype generator under various operating conditions are presented, together with theoretical results, to demonstrate the viability of the TSCAOI power generation. The proposed generator is simple and capable of both storage and retrieval of energy through its excitation winding and is expected to be suitable for applications, such as small wind turbines and microhydro systems.