317 resultados para Masks -- Mexico -- Veracruz-Llave (State)


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The ISSCT Process Section workshop held in Réunion 20–23 October 2008 was attended by 51 delegates from 10 countries. The theme was Green cane impact on sugar processing. The workshop provided a valuable and timely opportunity to review and discuss the impact on factory operations and performance from a green cane supply that could include significant levels of trash. It was particularly relevant to those mills that were considering options to boost their biomass intake for increased co-generation capacity. Several of the speakers related their experiences with processing ‘whole of crop’ cane supplies through the factory. Speakers detailed the problems and increased losses that were incurred when processing cane with high trash levels. The consensus of the delegates was that the best scenario would involve a cane-cleaning plant at the factory so that only clean cane would be processed through the factory. The forum recommended that more research was required to address the issues of increased impurities in the process streams associated with high trash levels. Site visits to the two factories and a cane-delivery station were arranged as part of the workshop.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fermentation feedstocks in the sugar industry are based on cane juice, B molasses or final molasses. Brazil has been producing ethanol by directing sugarcane juice to fermentation directly or using lower quality juice as a diluent with B molasses to prepare the fermentation broth. One issue that has received only limited interest particularly from outside Brazil is the most appropriate conditions for clarification of the juice going to fermentation. Irrespective of whether the juice supply is the total flow from the milling tandem or a diffuser station or a part of the total flow, removal of the insoluble solids is essential. However, the standard defecation process used by sugar factories around the world to clarify juice can introduce unwanted calcium ions and remove other nutrients such as phosphorus and nitrogen that are considered essential for the fermentation process. An investigation was undertaken by SRI to assess the effects on the constituents of cane juice when subjected to the typical clarification process in an Australian factory and what conditions would be needed to provide a clarified juice suitable for fermentation. Typical juices from one factory were clarified in laboratory trials under a range of pH conditions and the resulting clarified juices analysed. The results indicated that pH had a major effect on the residual concentrations of key constituents in the clarified juice and that the selected clarification conditions are determined by the nominated quality criteria of clarified juice feedstock for fermentation. Further trials were conducted in overseas factories to confirm the results obtained in Australia. It became apparent that the preferred specifications for clarified juice going to fermentation varied from country to country. Each supplier of fermentation technology had criteria applying to clarified juice feedstock that would have a major impact on the standard of clarification required to achieve compliance with the criteria.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper compares three different methods of inclusion of current phasor measurements by phasor measurement units (PMUs) in the conventional power system state estimator. For each of the three methods, comprehensive formulation of the hybrid state estimator in the presence of conventional and PMU measurements is presented. The performance of the state estimator in the presence of conventional measurements and optimally placed PMUs is evaluated in terms of convergence characteristics and estimator accuracy. Test results on the IEEE 14-bus and IEEE 300-bus systems are analyzed to determine the best possible method of inclusion of PMU current phasor measurements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this chapter, we are particularly concerned with making visible the general principles underlying the transmission of Social Studies curriculum knowledge, and considering it in light of a high-stakes mandated national assessment task. Specifically, we draw on Bernstein’s theoretical concept of pedagogic models as a tool for analysing orientations to teaching and learning. We introduce a case in point from the Australian context: one state Social Studies curriculum vis-a-vis one part of the Year Three national assessment measure for reading. We use our findings to consider the implications for the disciplinary knowledge of Social Studies in the communities in which we are undertaking our respective Australian Research Council Linkage project work (Glasswell et al.; Woods et al.). We propose that Social Studies disciplinary knowledge is being constituted, in part, through power struggles between different agencies responsible for the production and relay of official forms of state curriculum and national literacy assessment. This is particularly the case when assessment instruments are used to compare and contrast school results in highly visible web based league tables (see, for example, http://myschoolaustralia.ning.com/).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Various load compensation schemes proposed in literature assume that voltage source at point of common coupling (PCC) is stiff. In practice, however, the load is remote from a distribution substation and is supplied by a feeder. In the presence of feeder impedance, the PWM inverter switchings distort both the PCC voltage and the source currents. In this paper load compensation with such a non-stiff source is considered. A switching control of the voltage source inverter (VSI) based on state feedback is used for load compensation with non-stiff source. The design of the state feedback controller requires careful considerations in choosing a gain matrix and in the generation of reference quantities. These aspects are considered in this paper. Detailed simulation and experimental results are given to support the control design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose, Design/methodology / approach The acknowledgement of state significance in relation to development projects can result in special treatment by regulatory authorities, particularly in terms of environmental compliance and certain economic and other government support measures. However, defining just what constitutes a “significant project”, or a project of “state significance”, varies considerably between Australian states. In terms of establishing threshold levels, in Queensland there is even less clarity. Despite this lack of definition, the implications of “state significance” can nevertheless be considerable. For example, in Queensland if the Coordinator-General declares a project to be a “significant project” under the State Development and Public Works Organisation Act 1971, the environmental impact assessment process may become more streamlined – potentially circumventing certain provisions under The Integrated Planning Act 1997. If the project is not large enough to be so deemed, an extractive resource under the State Planning Policy 2/07 - Protection of Extractive Resources 2007 may be considered to be of State or regional significance and subsequently designated as a “Key Resource Area”. As a consequence, such a project is afforded some measure of resource protection but remains subject to the normal assessment process under the Integrated Development Assessment System, as well as the usual requirements of the vegetation management codes, and other regulations. Findings (Originality/value) & Research limitations / implications This paper explores the various meanings of “state significance” in Queensland and the ramifications for development projects in that state. It argues for a streamlining of the assessment process in order to avoid or minimise constraints acting on the state’s development. In so doing, it questions the existence of a strategic threat to the delivery of an already over-stretched infrastructure program.