72 resultados para Final state
Resumo:
Under the Alien Tort Statute United States of America (“America”) Federal Courts have the jurisdiction to hear claims for civil wrongs, committed against non-American citizens, which were perpetrated outside America’s national borders. The operation of this law has confronted American Federal Courts with difficulties on how to manage conflicts between American executive foreign policy and judicial interpretations of international law. Courts began to pass judgment over conduct which was approved by foreign governments. Then in 2005 the American Supreme Court wound back the scope of the Alien Tort Statute. This article will review the problems with the expansion of the Alien Tort Statute and the reasons for its subsequent narrowing.
Resumo:
Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course
Resumo:
This research project aims to improve economic, social and environmental sustainability of the pre-cast concrete and construction and demolition waste supply chains through the development, trial and evaluation of an innovative supply chain management strategy. The long-term goals are to improve competitive behaviour and market sector performance and improve business process efficiency and effectiveness of public sector program delivery by influencing policy development, changing organisational behaviour and implementation development to achieve more economic, social and environmental sustainable markets.
Resumo:
This report is for one of the four Tasks of the CRC project ‘Regenerating Construction to Enhance Sustainability’. The report specifically addresses Task 2 ‘Design guidelines for delivering high quality indoor environments’.
Resumo:
The main objective was to compare the environmental impacts of a building undergoing refurbishment both before and after the refurbishment and to assist in the design of the refurbishment with what is learned.
Resumo:
This report presents the results of a study on indoor environment quality (IEQ) and occupant productivity in two buildings that are owned and Occupied by City of Melbourne, and located next to each other in Central Melbourne, Council House 1 (CH1) and Council House 2 (CH2). The impact of a range of relevant IEQ and other parameters on health, wellbeing and productivity of occupants is assessed. The before-and-after case study has demonstrated that the productivity of office building occupants can potentially be enhanced through good building design, and provision of a high quality, healthy, comfortable and functional interior environment, that takes account of basic occupant needs. It has shown that good indoor environment quality is a necessary pre-requisite for enhanced productivity in office buildings, but that broader aspects of overall building and interior design are also important.
Resumo:
The Regenerating Construction Project for the CRC for Construction Innovation aims to assist in the delivery of demonstrably superior ‘green’ buildings. Components of the project address eco-efficient redesign, achieving a smaller ecological footprint, enhancing indoor environment and minimising waste in design and construction. The refurbishment of Council House 1 for Melbourne City Council provides an opportunity to develop and demonstrate tools that will be of use for commercial building refurbishment generally. It is hoped that the refurbishment will act as an exemplar project to demonstrate environmentally friendly possibilities for office building refurbishment.
Resumo:
The project has further developed two programs for the industry partners related to service life prediction and salt deposition. The program for Queensland Department of Main Roads which predicts salt deposition on different bridge structures at any point in Queensland has been further refined by looking at more variables. It was found that the height of the bridge significantly affects the salt deposition levels only when very close to the coast. However the effect of natural cleaning of salt by rainfall was incorporated into the program. The user interface allows selection of a location in Queensland, followed by a bridge component. The program then predicts the annual salt deposition rate and rates the likely severity of the environment. The service life prediction program for the Queensland Department of Public Works has been expanded to include 10 common building components, in a variety of environments. Data mining procedures have been used to develop the program and increase the usefulness of the application. A Query Based Learning System (QBLS) has been developed which is based on a data-centric model with extensions to provide support for user interaction. The program is based on number of sources of information about the service life of building components. These include the Delphi survey, the CSIRO Holistic model and a school survey. During the project, the Holistic model was modified for each building component and databases generated for the locations of all Queensland schools. Experiments were carried out to verify and provide parameters for the modelling. These included instrumentation of a downpipe, measurements on pH and chloride levels in leaf litter, EIS measurements and chromate leaching from Colorbond materials and dose tests to measure corrosion rates of new materials. A further database was also generated for inclusion in the program through a large school survey. Over 30 schools in a range of environments from tropical coastal to temperate inland were visited and the condition of the building components rated on a scale of 0-5. The data was analysed and used to calculate an average service life for each component/material combination in the environments, where sufficient examples were available.
Resumo:
The Your Building Project to build a website as the business and technical guide to sustainable commercial buildings has now been completed. The site is available at www.yourbuilding.org. The project was delivered to meet the requirements of the funding agreement between the Commonwealth of Australia represented by the Department of the Environment and Heritage (now Department of the Environment and Water Resources) and the Cooperative Research Centre for Construction Innovation (Construction Innovation).
Resumo:
This feasibility study was established to investigate the application of the concept of ‘best value’ in construction procurement in Australia. In the case of ‘best value’ in the business enterprise, ‘best value’ is that which returns greatest value to the business enterprise’s shareholders. However, in the case of the public sector, ‘best value’ is more complex. For that reason, this research project focuses mainly on public sector construction project procurement.
Resumo:
This is the final report of research project 2002-057-C: Enabling Team Collaboration with Pervasive and Mobile Computing. The research project was carried out by the Australian Cooperative Research Centre for Construction Innovation and has two streams that consider the use of pervasive computing technologies in two different contexts. The first context was the on-site deployment of mobile computing devices, where as the second context was the use and development of intelligent rooms based on sensed environments and new human-computer interfaces (HCI) for collaboration in the design office. The two streams present a model of team collaboration that relies on continues communication to people and information to reduce information leakage. This report consists of five sections: (1) Introduction; (2) Research Project Background; (3) Project Implementation; (4) Case Studies and Outcomes; and (5) Conclusion and Recommendation. Introduction in Section 1 presents a brief description of the research project including general research objectives and structure. Section 2 introduces the background of the research and detailed information regarding project participants, objectives and significance, and also research methodology. Review of all research activities such as literature review and case studies are summarised in Project Implementation in Section 3. Following this, in Section 4 the report then focuses on analysing the case studies and presents their outcomes. Conclusion and recommendation of the research project are summarised in Section 5. Other information to support the content of the report such as research project schedule is provided in Appendices. The purpose of the final project report is to provide industry partners with detailed information on the project activities and methodology such as the implementation of pervasive computing technologies in the real contexts. The report summarises the outcomes of the case studies and provides necessary recommendation to industry partners of using new technologies to support better project collaboration.
Final : report assessing risk and variation in maintenance and rehabilitation costs for road network
Resumo:
This report presents the results of research projects conducted by The Australian Cooperative Research Centre for Construction Innovation, Queensland University of Technology, RMIT University, Queensland Government Department of Main Roads and Queensland Department of Public Works. The research projects aimed at developing a methodology for assessing variation and risk in investment in road network, including the application of the method in assessing road network performance and maintenance and rehabilitation costs for short- and long-term future investment.
Resumo:
Paramedics are at high risk of exposure to infectious diseases because they frequently undertake procedures such as the use and disposal of sharps as components of everyday practice. While the literature demonstrates that the management of sharps is problematic across all health disciplines, there is a paucity of research examining sharps management practices in the Australian pre-hospital paramedic context. This study examines knowledge and practices of sharps control among paramedics in Queensland, Australia. A mail survey focusing on infection control knowledge and practices was sent to all clinical personnel of the Queensland Ambulance Service (QAS) (N = 2274). A total of 1258 surveys were returned, a response rate of 55.3%. Participants responded to 12 true/false statements on the management of sharps and three questions about recapping practices. Most respondents were knowledgeable about the correct management of sharps, with a mean of 11.28 (out of 12, SD = 1.32). When gauging reported practices, more than half (59.1%, n = 736) of participants reported recapping a needle, and 38.5% (n = 479) reported never having done so. These results reflect good knowledge of general management of sharps among respondents, but suggest deficits regarding reported practices. The results suggest that a comprehensive ambulance in-service education programme focusing particularly on sharps management is required. The study highlights the need for further research on sharps management practices in the field, identification of barriers to safe sharps practices in pre-hospital settings, and 'best practice' for translating good sharps management knowledge into practice.
Resumo:
This was a two-stage project to inform the Australian property and construction industry generally, and to provide the Australian Building Codes Board (ABCB) with information to allow it to determine whether or not sustainability requirements are necessary in the Future Building Code of Australia (BCA21). Research objectives included: examine overseas sustainability requirements for buildings and outline the reason why it is controlled and regulated in the particular country, state, principality etc. examine studies focusing on sustainability developments in buildings in Australia and overseas identify potential issues and implications associated with sustainable building requirements provide advice on whether provisions are necessary in the BCA21 to make buildings sustainable if the study determines there is a need for sustainability requirements in the BCA21, the study was to demonstrate the need to control and regulate along with the method to control and regulate. This research was broken down into two stages. Stage 1 was a literature review of international requirements as well as current thinking and practice for sustainable building developments. Stage 2 identified issues and implications of sustainability requirements for buildings and advice on whether provisions are necessary in the BCA21. This stage included workshops in all capital cities and involved key stakeholders, such as regulators, local government and representatives from key associations. This final report brings together the work of both stages, along with a searchable internet database of references and a series of nine key recommendations.