The concept of moving block signallings (MBS) has been adopted in a few mass transit railway systems. When a dense queue of trains begins to move from a complete stop, the trains can re-start in very close succession under MBS. The feeding substations nearby are likely to be overloaded and the service will inevitably be disturbed unless substations of higher power rating are used. By introducing starting time delays among the trains or limiting the trains’ acceleration rate to a certain extent, the peak energy demand can be contained. However, delay is introduced and quality of service is degraded. An expert system approach is presented to provide a supervisory tool for the operators. As the knowledge base is vital for the quality of decisions to be made, the study focuses on its formulation with a balance between delay and peak power demand.
Resumo:
Conflict occurs when two or more trains approach the same junction within a specified time. Such conflicts result in delays. Current practices to assign the right of way at junctions achieve orderly and safe passage of the trains, but do not attempt to reduce the delays. A traffic controller developed in the paper assigns right of way to impose minimum total weighted delay on the trains. The traffic flow model and the optimisation technique used in this controller are described. Simulation studies of the performance of the controller are given.
Resumo:
High reliability of railway power systems is one of the essential criteria to ensure quality and cost-effectiveness of railway services. Evaluation of reliability at system level is essential for not only scheduling maintenance activities, but also identifying reliability-critical components. Various methods to compute reliability on individual components or regularly structured systems have been developed and proven to be effective. However, they are not adequate for evaluating complicated systems with numerous interconnected components, such as railway power systems, and locating the reliability critical components. Fault tree analysis (FTA) integrates the reliability of individual components into the overall system reliability through quantitative evaluation and identifies the critical components by minimum cut sets and sensitivity analysis. The paper presents the reliability evaluation of railway power systems by FTA and investigates the impact of maintenance activities on overall reliability. The applicability of the proposed methods is illustrated by case studies in AC railways.
Resumo:
On 12 June 2006, the lights went out in New Zealand’s largest city and major commercial centre, Auckland. Business was disrupted and many thousands of people inconvenienced. The unscheduled power cut was the latest in a series of electric power problems in New Zealand over the past decade. Attention turned to state-owned enterprise [SOE] Transpower, which was in charge of maintaining and developing New Zealand’s national electricity grid. The problem of 12 June was traced to two shackles in poor condition, small but essential parts of the electricity grid infrastructure. Closer examination of New Zealand’s electricity sector indicated these shackles were merely the tip of a power supply iceberg. Transpower’s Chief Executive, Ralph Craven, was now answerable to the Prime Minister for the issues creating the problems, and a workable solution to fix them. Transpower Chief Executive Ralph Craven needed to produce answers that went well beyond the problem of the two faulty shackles. The power crisis had brought to the fore wider issues of roles, responsibilities, and expectations in relation to the supply of electric power in New Zealand. Transpower was contending with these issues on a daily basis; however, the incident on 12 June publicly highlighted the urgent need for solutions that served the stakeholders in this critical industry.
Resumo:
This paper discusses the control and protection of a microgrid that is connected to utility through back-to-back converters. The back-to-back converter connection facilitates bidirectional power flow between the utility and the microgrid. These converters can operate in two different modes–one in which a fixed amount of power is drawn from the utility and the other in which the microgrid power shortfall is supplied by the utility. In the case of a fault in the utility or microgrid side, the protection system should act not only to clear the fault but also to block the back-to-back converters such that its dc bus voltage does not fall during fault. Furthermore, a converter internal mechanism prevents it from supplying high current during a fault and this complicates the operation of a protection system. To overcome this, an admittance based relay scheme is proposed, which has an inverse time characteristic based on measured admittance of the line. The proposed protection and control schemes are able to ensure reliable operation of the microgrid.
Resumo:
Trees, shrubs and other vegetation are of continued importance to the environment and our daily life. They provide shade around our roads and houses, offer a habitat for birds and wildlife, and absorb air pollutants. However, vegetation touching power lines is a risk to public safety and the environment, and one of the main causes of power supply problems. Vegetation management, which includes tree trimming and vegetation control, is a significant cost component of the maintenance of electrical infrastructure. For example, Ergon Energy, the Australia’s largest geographic footprint energy distributor, currently spends over $80 million a year inspecting and managing vegetation that encroach on power line assets. Currently, most vegetation management programs for distribution systems are calendar-based ground patrol. However, calendar-based inspection by linesman is labour-intensive, time consuming and expensive. It also results in some zones being trimmed more frequently than needed and others not cut often enough. Moreover, it’s seldom practicable to measure all the plants around power line corridors by field methods. Remote sensing data captured from airborne sensors has great potential in assisting vegetation management in power line corridors. This thesis presented a comprehensive study on using spiking neural networks in a specific image analysis application: power line corridor monitoring. Theoretically, the thesis focuses on a biologically inspired spiking cortical model: pulse coupled neural network (PCNN). The original PCNN model was simplified in order to better analyze the pulse dynamics and control the performance. Some new and effective algorithms were developed based on the proposed spiking cortical model for object detection, image segmentation and invariant feature extraction. The developed algorithms were evaluated in a number of experiments using real image data collected from our flight trails. The experimental results demonstrated the effectiveness and advantages of spiking neural networks in image processing tasks. Operationally, the knowledge gained from this research project offers a good reference to our industry partner (i.e. Ergon Energy) and other energy utilities who wants to improve their vegetation management activities. The novel approaches described in this thesis showed the potential of using the cutting edge sensor technologies and intelligent computing techniques in improve power line corridor monitoring. The lessons learnt from this project are also expected to increase the confidence of energy companies to move from traditional vegetation management strategy to a more automated, accurate and cost-effective solution using aerial remote sensing techniques.
Resumo:
A microgrid provides economical and reliable power to customers by integrating distributed resources more effectively. Islanded operation enables a continuous power supply for loads during a major grid disturbance. Reliability of a microgrid can be further increased by forming a mesh configuration. However, the protection of mesh microgrids is a challenging task. In this paper, protection schemes are discussed using current differential protection of a microgrid. The protection challenges associated with bi-directional power flow, meshed configuration, changing fault current level due to intermittent nature of DGs and reduced fault current level in an islanded mode are considered in proposing the protection solutions. Relay setting criterion and current transformer (CT) selection guidelines are also discussed. The results are verified using MATLAB calculations and PSCAD simulations.
Resumo:
Some uncertainties such as the stochastic input/output power of a plug-in electric vehicle due to its stochastic charging and discharging schedule, that of a wind unit and that of a photovoltaic generation source, volatile fuel prices and future uncertain load growth, all together could lead to some risks in determining the optimal siting and sizing of distributed generators (DGs) in distributed systems. Given this background, under the chance constrained programming (CCP) framework, a new method is presented to handle these uncertainties in the optimal sitting and sizing problem of DGs. First, a mathematical model of CCP is developed with the minimization of DGs investment cost, operational cost and maintenance cost as well as the network loss cost as the objective, security limitations as constraints, the sitting and sizing of DGs as optimization variables. Then, a Monte Carolo simulation embedded genetic algorithm approach is developed to solve the developed CCP model. Finally, the IEEE 37-node test feeder is employed to verify the feasibility and effectiveness of the developed model and method. This work is supported by an Australian Commonwealth Scientific and Industrial Research Organisation (CSIRO) Project on Intelligent Grids Under the Energy Transformed Flagship, and Project from Jiangxi Power Company.
Resumo:
A novel concept of producing high dc voltage for pulsed-power applications is proposed in this paper. The topology consists of an LC resonant circuit supplied through a tuned alternating waveform that is produced by an inverter. The control scheme is based on the detection of variations in the resonant frequency and adjustment of the switching signal patterns for the inverter to produce a square waveform with exactly the same frequencies. Therefore the capacitor voltage oscillates divergently with an increasing amplitude. A simple one-stage capacitor-diode voltage multiplier (CDVM) connected to the resonant capacitor then rectifies the alternating voltage and gives a dc level equal to twice the input voltage amplitude. The produced high voltage appears then in the form of high-voltage pulses across the load. A basic model is simulated by Simulink platform of MATLAB and the results are included in the paper.
Resumo:
The development of an intelligent plug-in electric vehicle (PEV) network is an important research topic in the smart grid environment. An intelligent PEV network enables a flexible control of PEV charging and discharging activities and hence PEVs can be utilized as ancillary service providers in the power system concerned. Given this background, an intelligent PEV network architecture is first developed, and followed by detailed designs of its application layers, including the charging and discharging controlling system, mobility and roaming management, as well as communication mechanisms associated. The presented architecture leverages the philosophy in mobile communication network buildup
Resumo:
This paper proposes a new approach for state estimation of angles and frequencies of equivalent areas in large power systems with synchronized phasor measurement units. Defining coherent generators and their correspondent areas, generators are aggregated and system reduction is performed in each area of inter-connected power systems. The structure of the reduced system is obtained based on the characteristics of the reduced linear model and measurement data to form the non-linear model of the reduced system. Then a Kalman estimator is designed for the reduced system to provide an equivalent dynamic system state estimation using the synchronized phasor measurement data. The method is simulated on two test systems to evaluate the feasibility of the proposed method.
Resumo:
The well-known power system stabilizer (PSS) is used to generate supplementary control signals for the excitation system of a generator so as to damp low frequency oscillations in the power system concerned. Up to now, various kinds of PSS design methods have been proposed and some of them applied in actual power systems with different degrees. Given this background, the small-disturbance eigenvalue analysis and large-disturbance dynamic simulations in the time domain are carried out to evaluate the performances of four different PSS design methods, including the Conventional PSS (CPSS), Single-Neuron PSS (SNPSS), Adaptive PSS (APSS) and Multi-band PSS (MBPSS). To make the comparisons equitable, the parameters of the four kinds of PSSs are all determined by the steepest descent method. Finally, an 8-unit 24-bus power system is employed to demonstrate the performances of the four kinds of PSSs by the well-established eigenvalue analysis as well as numerous digital simulations, and some useful conclusions obtained.
Resumo:
Nonthermal plasma (NTP) treatment of exhaust gas is a promising technology for both nitrogen oxides (NOX) and particulate matter (PM) reduction by introducing plasma into the exhaust gases. This paper considers the effect of NTP on PM mass reduction, PM size distribution, and PM removal efficiency. The experiments are performed on real exhaust gases from a diesel engine. The NTP is generated by applying high-voltage pulses using a pulsed power supply across a dielectric barrier discharge (DBD) reactor. The effects of the applied high-voltage pulses up to 19.44 kVpp with repetition rate of 10 kHz are investigated. In this paper, it is shown that the PM removal and PM size distribution need to be considered both together, as it is possible to achieve high PM removal efficiency with undesirable increase in the number of small particles. Regarding these two important factors, in this paper, 17 kVpp voltage level is determined to be an optimum point for the given configuration. Moreover, particles deposition on the surface of the DBD reactor is found to be a significant phenomenon, which should be considered in all plasma PM removal tests.
Resumo:
The measurement of losses in high efficiency / high power converters is difficult. Measuring the losses directly from the difference between the input and output power results in large errors. Calorimetric methods are usually used to bypass this issue but introduce different problems, such as, long measurement times, limited power loss measurement range and/or large set up cost. In this paper the total losses of a converter are measured directly and switching losses are exacted. The measurements can be taken with only three multimeters and a current probe and a standard bench power supply. After acquiring two or three power loss versus output current sweeps, a series of curve fitting processes are applied and the switching losses extracted.