327 resultados para Construction industry - Cost effectiveness
Resumo:
Construction 2020 is a national initiative undertaken by CRC for Construction Innovation to focus its ongoing leadership of the Australian property and construction industry in applied research and best contribute to the industry's national and international growth and competitiveness. It is the first major report on the long-term outlook for the industry since the late 1990s. The report identifies nine key themes for the future of the property and construction industry. These visions describe the major concerns of the industry and the improved future working environment favoured by its stakeholders. The first and clearest vision, agreed across the industry, is that environmentally sustainable construction the creation of buildings and infrastructure that minimise their impact on the natural environment is an area of huge potential. Here technologies like Construction Innovation's LCADesign can make a big difference. This is a calculator that works out automatically from 3D computer-aided design the environmental costs of materials in a building all at the push of a button. By working with industry, we'd expect to have a comprehensive set of eco-design tools for all stages of the construction life cycle, to minimise energy use, greenhouse and other forms of waste or pollution. Other significant areas of focus in the report include the development of nationally uniform codes of practice, new tools to evaluate design and product performance, comparisons with overseas industries, and a worldwide research network to ensure that Australian technology is at the cutting edge.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
This paper outlines how the project agreement operating on the Australian National Museum project in Canberra, Australia facilitated a responsible and responsive workplace environment for construction workers. A project alliancing approach was adopted and designed to encourage industrial relations innovation in the workplace. The trigger for this approach was the perceived success of the alliancing working arrangements between key project delivery teams and a desire to extend this arrangement to subcontractors, suppliers and the workforce. Changes in the Australian workplace relations environment and introduction of a national code of practice for the Australian construction industry provided impetus for reaching a new type of workplace agreement. The workplace culture and characteristics of relationships formed between workers and management on that site shaped the agreed terms and conditions of work. It also spurred the pursuit of innovative approaches to project delivery from a technology, management and workplace culture perspective.
Resumo:
Purpose: The purpose of this paper is to provide a labour process theory interpretation of four case studies within the Australian construction industry. In each case study a working time intervention (a shift to a five-day working week from the industry standard six days) was implemented as an attempt to improve the work-life balance of employees. ----- ----- Design/methodology/approach: This paper was based on four case studies with mixed methods. Each case study has a variety of data collection methods which include questionnaires, short and long interviews, and focus groups. ----- ----- Findings: It was found that the complex mix of wage- and salary-earning staff within the construction industry, along with labour market pressures, means that changing to a five-day working week is quite a radical notion within the industry. However, there are some organisations willing to explore opportunities for change with mixed experiences. ----- ----- Practical implications: The practical implications of this research include understanding the complexity within the Australian construction industry, based around hours of work and pay systems. Decision-makers within the construction industry must recognize a range of competing pressures that mean that “preferred” managerial styles might not be appropriate. ----- ----- Originality/value:– This paper shows that construction firms must take an active approach to reducing the culture of long working hours. This can only be achieved by addressing issues of project timelines and budgets and assuring that take-home pay is not reliant on long hours of overtime.
Resumo:
Since the establishment of the first national strategic development plan in the early 1970s, the construction industry has played an important role in terms of the economic, social and cultural development of Indonesia. The industry’s contribution to Indonesia’s gross domestic product (GDP) increased from 3.9% in 1973 to 7.7% in 2007. Business Monitoring International (2009) forecasts that Indonesia is home to one of the fastest-growing construction industries in Asia despite the average construction growth rate being expected to remain under 10% over the period 2006 – 2010. Similarly, Howlett and Powell (2006) place Indonesia as one of the 20 largest construction markets in 2010. Although the prospects for the Indonesian construction industry are now very promising, many local construction firms still face serious difficulties, such as poor performance and low competitiveness. There are two main reasons behind this problem: the environment that they face is not favourable; the other is the lack of strategic direction to improve competitiveness and performance. Furthermore, although strategic management has now become more widely used by many large construction firms in developed countries, practical examples and empirical studies related to the Indonesian construction industry remain scarce. In addition, research endeavours related to these topics in developing countries appear to be limited. This has potentially become one of the factors hampering efforts to guide Indonesian construction enterprises. This research aims to construct a conceptual model to enable Indonesian construction enterprises to develop a sound long-term corporate strategy that generates competitive advantage and superior performance. The conceptual model seeks to address the main prescription of a dynamic capabilities framework (Teece, Pisano & Shuen, 1997; Teece, 2007) within the context of the Indonesian construction industry. It is hypothesised that in a rapidly changing and varied environment, competitive success arises from the continuous development and reconfiguration of firm’s specific assets achieving competitive advantage is not only dependent on the exploitation of specific assets/capabilities, but on the exploitation of all of the assets and capabilities combinations in the dynamic capabilities framework. Thus, the model is refined through sequential statistical regression analyses of survey results with a sample size of 120 valid responses. The results of this study provide empirical evidence in support of the notion that a competitive advantage is achieved via the implementation of a dynamic capability framework as an important way for a construction enterprise to improve its organisational performance. The characteristics of asset-capability combinations were found to be significant determinants of the competitive advantage of the Indonesian construction enterprises, and that such advantage sequentially contributes to organisational performance. If a dynamic capabilities framework can work in the context of Indonesia, it suggests that the framework has potential applicability in other emerging and developing countries. This study also demonstrates the importance of the multi-stage nature of the model which provides a rich understanding of the dynamic process by which asset-capability should be exploited in combination by the construction firms operating in varying levels of hostility. Such findings are believed to be useful to both academics and practitioners, however, as this research represents a dynamic capabilities framework at the enterprise level, future studies should continue to explore and examine the framework in other levels of strategic management in construction as well as in other countries where different cultures or similar conditions prevails.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.
Resumo:
A significant reduction in carbon emissions is a global mission and the construction industry has an indispensable role to play as a major carbon dioxide (CO2) generator. Over the years, various building environmental assessment (BEA) models and concepts have been developed to promote environmentally responsible design and construction. However, limited attention has been placed on assessing and benchmarking the carbon emitted throughout the lifecycle of building facilities. This situation could undermine the construction industry’s potential to reduce its dependence on raw materials, recognise the negative impacts of producing new materials, and intensify the recycle and reuse process. In this paper, current BEA approaches adopted by the construction industry are first introduced. The focus of these models and concepts is then examined. Following a brief review of lifecycle analysis, the boundary in which a lifecycle carbon emission analysis should be set for a construction project is identified. The paper concludes by highlighting the potential barriers of applying lifecycle carbon emissions analysis in the construction industry. It is proposed that lifecycle carbon emission analysis can be integrated with existing BEA models to provide a more comprehensive and accurate evaluation on the cradle-to-grave environmental performance of a construction facility. In doing so, this can assist owners and clients to identify the optimum solution to maximise emissions reduction opportunities.
Resumo:
Project management in the construction industry involves coordination of many tasks and individuals, affected by complexity and uncertainty, which increases the need for efficient cooperation. Procurement is crucial since it sets the basis for cooperation between clients and contractors. This is true whether the project is local, regional or global in scope. Traditionally, procurement procedures are competitive, resulting in conflicts, adversarial relationships and less desirable project results. The purpose of this paper is to propose and empirically test an alternative procurement model based on cooperative procurement procedures that facilitates cooperation between clients and contractors in construction projects. The model is based on four multi-item constructs – incentive-based compensation, limited bidding options, partner selection and cooperation. Based on a sample of 87 client organisations, the model was empirically tested and exhibited strong support, including content, nomological, convergent and discriminant validity, as well as reliability. Our findings indicate that partner selection based on task related attributes mediates the relationship between two important pre-selection processes (incentive-based compensation and limited bid invitation) and preferred outcome of cooperation. The contribution of the paper is identifying valid and reliable measurement constructs and confirming a unique sequential order for achieving cooperation. Moreover, the findings are applicable for many types of construction projects because of the similarities in the construction industry worldwide.
Resumo:
Background Providing ongoing family centred support is an integral part of childhood cancer care. For families living in regional and remote areas, opportunities to receive specialist support are limited by the availability of health care professionals and accessibility, which is often reduced due to distance, time, cost and transport. The primary aim of this work is to investigate the cost-effectiveness of videotelephony to support regional and remote families returning home for the first time with a child newly diagnosed with cancer Methods/design We will recruit 162 paediatric oncology patients and their families to a single centre randomised controlled trial. Patients from regional and remote areas, classified by Accessibility/Remoteness Index of Australia (ARIA+) greater than 0.2, will be randomised to a videotelephone support intervention or a usual support control group. Metropolitan families (ARIA+ ≤ 0.2) will be recruited as an additional usual support control group. Families allocated to the videotelephone support intervention will have access to usual support plus education, communication, counselling and monitoring with specialist multidisciplinary team members via a videotelephone service for a 12-week period following first discharge home. Families in the usual support control group will receive standard care i.e., specialist multidisciplinary team members provide support either face-to-face during inpatient stays, outpatient clinic visits or home visits, or via telephone for families who live far away from the hospital. The primary outcome measure is parental health related quality of life as measured using the Medical Outcome Survey (MOS) Short Form SF-12 measured at baseline, 4 weeks, 8 weeks and 12 weeks. The secondary outcome measures are: parental informational and emotional support; parental perceived stress, parent reported patient quality of life and parent reported sibling quality of life, parental satisfaction with care, cost of providing improved support, health care utilisation and financial burden for families. Discussion This investigation will establish the feasibility, acceptability and cost-effectiveness of using videotelephony to improve the clinical and psychosocial support provided to regional and remote paediatric oncology patients and their families.
Resumo:
Levels of waste within the construction industry need to be reduced for environmental and economic reasons. Changing people's wasteful behaviour can make a significant contribution. This paper describes a research project that used Ajzen's 'theory of planned behaviour' to investigate the attitudinal forces that shape behaviour at the operative level. It concludes that operatives see waste as an inevitable by-product of construction activity. Attitudes towards waste management are not negative, although they are pragmatic and impeded by perceptions of a lack of managerial commitment. Waste management is perceived as a low project priority, and there is an absence of appropriate resources and incentives to support it. A theory of waste behaviour is proposed for the construction industry, and recommendations are made to help managers improve operatives' attitudes towards waste.