201 resultados para BIM Guides
Resumo:
Cost estimating is a key task within Quantity Surveyors’ (QS) offices. Provision of an accurate estimate is vital to ensure that the objectives of the client are met by staying within the client’s budget. Building Information Modelling (BIM) is an evolving technology that has gained attention in the construction industries all over the world. Benefits from the use of BIM include cost and time savings if the processes used by the procurement team are adapted to maximise the benefits of BIM. BIM can be used by QSs to automate aspects of quantity take-off and the preparation of estimates, decreasing turnaround time and assist in controlling errors and inaccuracies. The Malaysian government has decided to require the use of BIM for its projects beginning from 2016. However, slow uptake is reported in the use of BIM both within companies and to support collaboration within the Malaysian industry. It has been recommended that QSs to start evaluating the impact of BIM on their practices. This paper reviews the perspectives of QSs in Malaysia towards the use of BIM to achieve more dependable results in their cost estimating practice. The objectives of this paper include identifying strategies in improving practice and potential adoption drivers that lead QSs to BIM usage in their construction projects. From the expert interviews, it was found out that, despite still using traditional methods and not practising BIM, the interviewees still acquire limited knowledge related to BIM. There are some drivers that potentially motivate them to employ BIM in their practices. These include client demands, innovation in traditional methods, speed in estimating costs, reduced time and costs, improvement in practices and self-awareness, efficiency in projects, and competition from other companies. The findings of this paper identify the potential drivers in encouraging Malaysian Quantity Surveyors to exploit BIM in their construction projects.
Resumo:
Purpose We sought to analyse clinical and oncological outcomes of patients after guided resection of periacetabular tumours and endoprosthetic reconstruction of the remaining defect. Methods From 1988 to 2008, we treated 56 consecutive patients (mean age 52.5 years, 41.1 % women). Patients were followed up either until death or February 2011 (mean follow up 5.5 years, range 0.1–22.5, standard deviation ± 5.3). Kaplan–Meier analysis was used to estimate survival rates. Results Disease-specific survival was 59.9 % at five years and 49.7 % at ten and 20 years, respectively. Wide resection margins were achieved in 38 patients, whereas 11 patients underwent marginal and seven intralesional resection. Survival was significantly better in patients with wide or marginal resection than in patients with intralesional resection (p = 0.022). Survival for patients with secondary tumours was significantly worse than for patients with primary tumours (p = 0.003). In 29 patients (51.8 %), at least one reoperation was necessary, resulting in a revision-free survival of 50.5 % at five years, 41.1 % at ten years and 30.6 % at 20 years. Implant survival was 77.0 % at five years, 68.6 % at ten years and 51.8 % at 20 years. A total of 35 patients (62.5 %) experienced one or more complications after surgery. Ten of 56 patients (17.9 %) experienced local recurrence after a mean of 8.9 months. The mean postoperative Musculoskeletal Tumor Society (MSTS) score was 18.1 (60.1 %). Conclusion The surgical approach assessed in this study simplifies the process of tumour resection and prosthesis implantation and leads to acceptable clinical and oncological outcomes.
Resumo:
Building Information Modelling (BIM) is a digital process that encompasses all aspects, disciplines and systems of built assets within a single virtual model. This allows stakeholders to collaborate more accurately and efficiently than with traditional processes. Case study 1 Design: New Generation Rollingstock Maintenance Centre, Queensland. Case Study 2 Construction: Perth Children's Hospital, Western Australia. Case Study 3 Asset Management: Sydney Opera House, New South Wales. This project sought to provide the built environment industry with a framework to measure and maximize benefits from implementing BIM across the life-cycle phases of a built asset.
Resumo:
The delivery of products and services for construction-based businesses is increasingly becoming knowledge-driven and information-intensive. The proliferation of building information modelling (BIM) has increased business opportunities as well as introduced new challenges for the architectural, engineering and construction and facilities management (AEC/FM) industry. As such, the effective use, sharing and exchange of building life cycle information and knowledge management in building design, construction, maintenance and operation assumes a position of paramount importance. This paper identifies a subset of construction management (CM) relevant knowledge for different design conditions of building components through a critical, comprehensive review of synthesized literature and other information gathering and knowledge acquisition techniques. It then explores how such domain knowledge can be formalized as ontologies and, subsequently, a query vocabulary in order to equip BIM users with the capacity to query digital models of a building for the retrieval of useful and relevant domain-specific information. The formalized construction knowledge is validated through interviews with domain experts in relation to four case study projects. Additionally, retrospective analyses of several design conditions are used to demonstrate the soundness (realism), completeness, and appeal of the knowledge base and query-based reasoning approach in relation to the state-of-the-art tools, Solibri Model Checker and Navisworks. The knowledge engineering process and the methods applied in this research for information representation and retrieval could provide useful mechanisms to leverage BIM in support of a number of knowledge intensive CM/FM tasks and functions.
Resumo:
In architecture courses, instilling a wider understanding of the industry specific representations practiced in the Building Industry is normally done under the auspices of Technology and Science subjects. Traditionally, building industry professionals communicated their design intentions using industry specific representations. Originally these mainly two dimensional representations such as plans, sections, elevations, schedules, etc. were produced manually, using a drawing board. Currently, this manual process has been digitised in the form of Computer Aided Design and Drafting (CADD) or ubiquitously simply CAD. While CAD has significant productivity and accuracy advantages over the earlier manual method, it still only produces industry specific representations of the design intent. Essentially, CAD is a digital version of the drawing board. The tool used for the production of these representations in industry is still mainly CAD. This is also the approach taken in most traditional university courses and mirrors the reality of the situation in the building industry. A successor to CAD, in the form of Building Information Modelling (BIM), is presently evolving in the Construction Industry. CAD is mostly a technical tool that conforms to existing industry practices. BIM on the other hand is revolutionary both as a technical tool and as an industry practice. Rather than producing representations of design intent, BIM produces an exact Virtual Prototype of any building that in an ideal situation is centrally stored and freely exchanged between the project team. Essentially, BIM builds any building twice: once in the virtual world, where any faults are resolved, and finally, in the real world. There is, however, no established model for learning through the use of this technology in Architecture courses. Queensland University of Technology (QUT), a tertiary institution that maintains close links with industry, recognises the importance of equipping their graduates with skills that are relevant to industry. BIM skills are currently in increasing demand throughout the construction industry through the evolution of construction industry practices. As such, during the second half of 2008, QUT 4th year architectural students were formally introduced for the first time to BIM, as both a technology and as an industry practice. This paper will outline the teaching team’s experiences and methodologies in offering a BIM unit (Architectural Technology and Science IV) at QUT for the first time and provide a description of the learning model. The paper will present the results of a survey on the learners’ perspectives of both BIM and their learning experiences as they learn about and through this technology.
Resumo:
Encouraging Ethics and Preventing Corruption brings theory and practice together in addressing the question: How are we to be ethical in public life and through public institutions? It is a major contribution to public sector ethics within Australia and internationally because it provides an exhaustive analysis of reform across a decade in one jurisdiction, Queensland, and then proceeds to itemise a best practice integrity system or ethics regime. Drawing on the extensive research of two of Australia's leading practical ethicists, this text is essential reading for all students and practitioners of applied and professional ethics in the public sphere. Part A of the text provides a preferred theoretical and conceptual framework which both justifies and guides the development of a public sector ethics regime. Part B examines the place of the individual within a world of institutional ethics. Part C outlines the Queensland governance reforms introduced since 1989 following the Fitzgerald Inquiry which exposed corruption in the police and ministry. The final chapter, the 'Epilogue', gathers the insights of earlier chapters and suggests a more explicitly ethics-centred approach to governance reform that may take us 'beyond best practice'. Clearly, while it is the Australian context we have in mind, we are confident that this is a text which addresses the quest for integrity and ethics in government wherever society is committed to social and liberal democratic ideals.
Resumo:
“SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM)”. The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: • The re-usability of building information for FM purposes • BIM as an Integrated information model for facility management • Extendibility of the BIM to cope with business specific requirements • Commercial facility management software using standardised building information models • The ability to add (organisation specific) intelligence to the model • A roadmap for SOH to adopt BIM for FM The project has established that BIM – building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC – open building exchange standard – specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user “lock in” to proprietary solutions, third party software can be the “best of breed” to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users’ information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the House’s existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House – FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data – provided by several of SOH’s current consultants – show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.
Resumo:
This Digital Modelling Report incorporates the previous research completed for the FM Exemplar Project utilising the Sydney Opera House as a case study. The research has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House do not have digital models of its structure, there is an opportunity to investigate the application of Digital Facility Modelling using standardised Building Information Models (BIM). The digital modelling research project has examined the potential of standardised building information models to develop a digital facility model supporting facilities management (FM). The focus of this investigation was on the following areas: • The re-usability of standardised building information models (BIM) for FM purposes. • The potential of BIM as an information framework acting as integrator for various FM data sources. • The extendibility and flexibility of the BIM to cope with business specific data and requirements. • Commercial FM software using standardised building information models. • The ability to add (organisation-specific) intelligence to the model. • A roadmap for Sydney Opera House to adopt BIM for FM.
Resumo:
Searching academic databases for records on ‘business failure’, ‘business distress’ or ‘bankruptcy’ yields a large body of studies on qualitative, empirical, theoretical and simulation aspects. It is a central part of this research to distil from this large quantity of potentially relevant reports and methodologies those which can both flag and predict business failure in the construction industry. An additional search term, such as, ‘construction’, ‘construction industry’ or ‘contractor’ yields a much smaller number of hits, many of which emphasize the construction industry’s distinctive characteristics. We scientists need first to understand the subject of investigation and the environment in which it lives. To do so, an analysis of existing successful and failed approaches to particular research questions is helpful before embarking on new territory. This guides the structure of the following report for we first review papers that specifically report on aspects of business failure in the construction industry followed by, (a) an overview of promising candidates borrowed from other disciplines and industries, and (b) a possible novel approach. An Australian (Queensland) perspective on the topic will also drive this investigation as most of the published research has been applied to the US and UK construction industries.
Resumo:
Facility managers have to acquire, integrate, edit and update diverse facility information ranging from building elements & fabric data, operational costs, contract types, room allocation, logistics, maintenance, etc. With the advent of standardized Building Information Models (BIM) such as the Industry Foundation Classes (IFC) new opportunities are available for Facility Managers to manage their FM data. The usage of IFC supports data interoperability between different software systems including the use of operational data for facility management systems. Besides the re-use of building data, the Building Information Model can be used as an information framework for storing and retrieving FM related data. Currently several BIM driven FM systems are available including IFC compliant ones. These systems have the potential to not only manage primary data more effectively but also to offer practical systems for detailed monitoring, and analysis of facility performance that can underpin innovative and more cost effective management of complex facilities.
Resumo:
The Automated Estimator and LCADesign are two early examples of nD modelling software which both rely on the extraction of quantities from CAD models to support their further processing. The issues of building information modelling (BIM), quantity takeoff for different purposes and automating quantity takeoff are discussed by comparing the aims and use of the two programs. The technical features of the two programs are also described. The technical issues around the use of 3D models is described together with implementation issues and comments about the implementation of the IFC specifications. Some user issues that emerged through the development process are described, with a summary of the generic research tasks which are necessary to fully support the use of BIM and nD modelling.
Resumo:
Building Information Model (BIM) software, collaboration platforms and 5D Construction Management software is now commercially available and presents the opportunity for construction project teams to design more cost effectively, plan construction earlier, manage costs throughout the life cycle of a building project and provide a central asset management register for facilities managers. This paper outlines the merits of taking a holistic view of ICT in curriculum design. The educational barriers to implementation of these models and planning tools are highlighted. Careful choice of computer software can make a significant difference to how quickly students can master skills; how easy it is to study and how much they enjoy learning and be prepared for employment. An argument for BIM and 5D planning tools to be introduced into the curriculum to assist industry increase productivity and efficiencies are outlined by the authors.
Resumo:
Since 1995 the buildingSMART International Alliance for Interoperability (buildingSMART)has developed a robust standard called the Industry Foundation Classes (IFC). IFC is an object oriented data model with related file format that has facilitated the efficient exchange of data in the development of building information models (BIM). The Cooperative Research Centre for Construction Innovation has contributed to the international effort in the development of the IFC standard and specifically the reinforced concrete part of the latest IFC 2x3 release. Industry Foundation Classes have been endorsed by the International Standards Organisation as a Publicly Available Specification (PAS) under the ISO label ISO/PAS 16739. For more details, go to http://www.tc184- sc4.org/About_TC184-SC4/About_SC4_Standards/ The current IFC model covers the building itself to a useful level of detail. The next stage of development for the IFC standard is where the building meets the ground (terrain) and with civil and external works like pavements, retaining walls, bridges, tunnels etc. With the current focus in Australia on infrastructure projects over the next 20 years a logical extension to this standard was in the area of site and civil works. This proposal recognises that there is an existing body of work on the specification of road representation data. In particular, LandXML is recognised as also is TransXML in the broader context of transportation and CityGML in the common interfacing of city maps, buildings and roads. Examination of interfaces between IFC and these specifications is therefore within the scope of this project. That such interfaces can be developed has already been demonstrated in principle within the IFC for Geographic Information Systems (GIS) project. National road standards that are already in use should be carefully analysed and contacts established in order to gain from this knowledge. The Object Catalogue for the Road Transport Sector (OKSTRA) should be noted as an example. It is also noted that buildingSMART Norway has submitted a proposal
Resumo:
After many years of development BIM (Building Information Modelling) is starting to achieve significant penetration into the building sector of the construction industry. This paper describes the current status of BIM and the drivers that are motivating the change from 2D CAD to BIM within the building sector. The paper then discusses what the implications of the technology underlying BIM may be for the civil construction sector of the construction industry. A project carried out by the Cooperative Research Centre for Construction Innovation is used as an example of this technology as well as several international examples.
Resumo:
This report presents the current state and approach in Building Information Modelling (BIM). The report is focussed at providing a desktop audit of the current state and capabilities of the products and applications supporting BIM. This includes discussion on BIM model servers as well as discipline specific applications, for which the distinction is explained below. The report presented here is aimed at giving a broad overview of the tools and applications with respect to their BIM capabilities and in no way claims to be an exhaustive report for individual tools. Chapter 4 of the report includes the research and development agendas pertaining to the BIM approach based on the observations and analysis from the desktop audit.