172 resultados para 2D barcode based authentication scheme
Resumo:
We consider the following problem: members in a dynamic group retrieve their encrypted data from an untrusted server based on keywords and without any loss of data confidentiality and member’s privacy. In this paper, we investigate common secure indices for conjunctive keyword-based retrieval over encrypted data, and construct an efficient scheme from Wang et al. dynamic accumulator, Nyberg combinatorial accumulator and Kiayias et al. public-key encryption system. The proposed scheme is trapdoorless and keyword-field free. The security is proved under the random oracle, decisional composite residuosity and extended strong RSA assumptions.
Resumo:
Interfacing converters used in connecting energy storage systems like supercapacitors and battery banks to wind power systems introduce additional cost and power losses. This paper therefore presents a direct integration scheme for supercapacitors used in mitigating short-term power fluctuations in wind power systems. This scheme uses a dual inverter topology for both grid connection and interfacing a supercapacitor bank. The main inverter of the dual inverter system is powered by the rectified output of a wind turbine-coupled permanent-magnet synchronous generator. The auxiliary inverter is directly connected to the supercapacitor bank. With this approach, an interfacing converter is not required, and there are no associated costs and power losses incurred. The operation of the proposed system is discussed in detail. Simulation and experimental results are presented to verify the efficacy of the proposed system in suppressing short-term wind power fluctuations.
Resumo:
This paper describes a diode-clamped three-level inverter-based battery/supercapacitor direct integration scheme for renewable energy systems. The study is carried out for three different cases. In the first case, one of the two dc-link capacitors of the inverter is replaced by a battery bank and the other by a supercapacitor bank. In the second case, dc-link capacitors are replaced by two battery banks. In the third case, ordinary dc-link capacitors are replaced by two supercapacitor banks. The first system is supposed to mitigate both long-term and short-term power fluctuations while the last two systems are intended for smoothening long-term and short-term power fluctuations, respectively. These topologies eliminate the need for interfacing dc-dc converters and thus considerably improve the overall system efficiency. The major issue in aforementioned systems is the unavoidable imbalance in dc-link voltages. An analysis on the effects of unbalance and a space vector modulation method, which can produce undistorted current even in the presence of such unbalances, are presented in this paper. Furthermore, small vector selection-based power sharing and state of charge balancing techniques are proposed. Experimental results, obtained from a laboratory prototype, are presented to verify the efficacy of the proposed modulation and control techniques.
Resumo:
Supercapacitors are increasingly used as short term energy storage elements in distributed generation systems. The traditional approach in integrating them to the main system is the use of interfacing dc-dc converters which introduce additional costs and power losses. This paper therefore, presents a novel direct integration scheme for supercapacitors and thereby eliminates associated costs and power losses of interfacing converters. The idea is simply to replace ordinary capacitors of three-level flying-capacitor rectifiers with supercapacitors and operate them under variable voltage conditions. An analysis on the reduction of power losses by the proposed system is presented. Furthermore, supercapacitor sizing and implementation issues such as effects of the variable voltage operation and resistive behavior of supercapacitors at high frequencies are also discussed. Simulation results are presented to verify the efficacy of the proposed system in suppressing short term power fluctuations in wind generation system.
Resumo:
A novel gray-box neural network model (GBNNM), including multi-layer perception (MLP) neural network (NN) and integrators, is proposed for a model identification and fault estimation (MIFE) scheme. With the GBNNM, both the nonlinearity and dynamics of a class of nonlinear dynamic systems can be approximated. Unlike previous NN-based model identification methods, the GBNNM directly inherits system dynamics and separately models system nonlinearities. This model corresponds well with the object system and is easy to build. The GBNNM is embedded online as a normal model reference to obtain the quantitative residual between the object system output and the GBNNM output. This residual can accurately indicate the fault offset value, so it is suitable for differing fault severities. To further estimate the fault parameters (FPs), an improved extended state observer (ESO) using the same NNs (IESONN) from the GBNNM is proposed to avoid requiring the knowledge of ESO nonlinearity. Then, the proposed MIFE scheme is applied for reaction wheels (RW) in a satellite attitude control system (SACS). The scheme using the GBNNM is compared with other NNs in the same fault scenario, and several partial loss of effect (LOE) faults with different severities are considered to validate the effectiveness of the FP estimation and its superiority.
Resumo:
This paper presents a new direct integration scheme for supercapacitors that are used to mitigate short term power fluctuations in wind power systems. The proposed scheme uses the popular dual inverter topology for grid connection as well as interfacing a supercapacitor bank. The dual inverter system is formed by cascading two 2-level inverters named as the “main inverter” and the “auxiliary inverter”. The main inverter is powered by the rectified output of a wind turbine coupled permanent magnet synchronous generator. The auxiliary inverter is directly connected to a super capacitor bank. This approach eliminates the need for an interfacing dc-dc converter for the supercapacitor bank and thus improves the overall efficiency. A detailed analysis on the effects of non-integer dynamically changing voltage ratio is presented. The concept of integrated boost rectifier is used to carry out the Maximum Power Point Tracking (MPPT) of the wind turbine generator. Another novel feature of this paper is the power reference adjuster which effectively manages capacitor charging and discharging at extreme conditions. Simulation results are presented to verify the efficacy of the proposed system in suppressing short term wind power fluctuations.
Resumo:
In this paper we present a novel scheme for improving speaker diarization by making use of repeating speakers across multiple recordings within a large corpus. We call this technique speaker re-diarization and demonstrate that it is possible to reuse the initial speaker-linked diarization outputs to boost diarization accuracy within individual recordings. We first propose and evaluate two novel re-diarization techniques. We demonstrate their complementary characteristics and fuse the two techniques to successfully conduct speaker re-diarization across the SAIVT-BNEWS corpus of Australian broadcast data. This corpus contains recurring speakers in various independent recordings that need to be linked across the dataset. We show that our speaker re-diarization approach can provide a relative improvement of 23% in diarization error rate (DER), over the original diarization results, as well as improve the estimated number of speakers and the cluster purity and coverage metrics.
Resumo:
High mechanical stress in atherosclerotic plaques at vulnerable sites, called critical stress, contributes to plaque rupture. The site of minimum fibrous cap (FC) thickness (FCMIN) and plaque shoulder are well-documented vulnerable sites. The inherent weakness of the FC material at the thinnest point increases the stress, making it vulnerable, and it is the big curvature of the lumen contour over FC which may result in increased plaque stress. We aimed to assess critical stresses at FCMIN and the maximum lumen curvature over FC (LCMAX) and quantify the difference to see which vulnerable site had the highest critical stress and was, therefore, at highest risk of rupture. One hundred patients underwent high resolution carotid magnetic resonance (MR) imaging. We used 352 MR slices with delineated atherosclerotic components for the simulation study. Stresses at all the integral nodes along the lumen surface were calculated using the finite-element method. FCMIN and LCMAX were identified, and critical stresses at these sites were assessed and compared. Critical stress at FC MIN was significantly lower than that at LCMAX (median: 121.55 kPa; inter quartile range (IQR) = [60.70-180.32] kPa vs. 150.80 kPa; IQR = [91.39-235.75] kPa, p < 0.0001). If critical stress at FCMIN was only used, then the stress condition of 238 of 352 MR slices would be underestimated, while if the critical stress at LCMAX only was used, then 112 out of 352 would be underestimated. Stress analysis at FCMIN and LCMAX should be used for a refined mechanical risk assessment of atherosclerotic plaques, since material failure at either site may result in rupture.
Resumo:
Instead of the costly encryption algorithms traditionally employed in auction schemes, efficient Goldwasser-Micali encryption is used to design a new sealed-bid auction. Multiplicative homomorphism instead of the traditional additive homomorphism is exploited to achieve security and high efficiency in the auction. The new scheme is the currently known most efficient non-interactive sealed-bid auction with bid privacy.
Resumo:
We propose a new password-based 3-party protocol with a formal security proof in the standard model. Under reasonable assumptions we show that our new protocol is more efficient than the recent protocol of Abdalla and Pointcheval (FC 2005), proven in the random oracle model. We also observe some limitations in the model due to Abdalla, Fouque and Pointcheval (PKC 2005) for proving security of such protocols.
Resumo:
Denial-of-service attacks (DoS) and distributed denial-of-service attacks (DDoS) attempt to temporarily disrupt users or computer resources to cause service un- availability to legitimate users in the internetworking system. The most common type of DoS attack occurs when adversaries °ood a large amount of bogus data to interfere or disrupt the service on the server. The attack can be either a single-source attack, which originates at only one host, or a multi-source attack, in which multiple hosts coordinate to °ood a large number of packets to the server. Cryptographic mechanisms in authentication schemes are an example ap- proach to help the server to validate malicious tra±c. Since authentication in key establishment protocols requires the veri¯er to spend some resources before successfully detecting the bogus messages, adversaries might be able to exploit this °aw to mount an attack to overwhelm the server resources. The attacker is able to perform this kind of attack because many key establishment protocols incorporate strong authentication at the beginning phase before they can iden- tify the attacks. This is an example of DoS threats in most key establishment protocols because they have been implemented to support con¯dentiality and data integrity, but do not carefully consider other security objectives, such as availability. The main objective of this research is to design denial-of-service resistant mechanisms in key establishment protocols. In particular, we focus on the design of cryptographic protocols related to key establishment protocols that implement client puzzles to protect the server against resource exhaustion attacks. Another objective is to extend formal analysis techniques to include DoS- resistance. Basically, the formal analysis approach is used not only to analyse and verify the security of a cryptographic scheme carefully but also to help in the design stage of new protocols with a high level of security guarantee. In this research, we focus on an analysis technique of Meadows' cost-based framework, and we implement DoS-resistant model using Coloured Petri Nets. Meadows' cost-based framework is directly proposed to assess denial-of-service vulnerabil- ities in the cryptographic protocols using mathematical proof, while Coloured Petri Nets is used to model and verify the communication protocols using inter- active simulations. In addition, Coloured Petri Nets are able to help the protocol designer to clarify and reduce some inconsistency of the protocol speci¯cation. Therefore, the second objective of this research is to explore vulnerabilities in existing DoS-resistant protocols, as well as extend a formal analysis approach to our new framework for improving DoS-resistance and evaluating the performance of the new proposed mechanism. In summary, the speci¯c outcomes of this research include following results; 1. A taxonomy of denial-of-service resistant strategies and techniques used in key establishment protocols; 2. A critical analysis of existing DoS-resistant key exchange and key estab- lishment protocols; 3. An implementation of Meadows's cost-based framework using Coloured Petri Nets for modelling and evaluating DoS-resistant protocols; and 4. A development of new e±cient and practical DoS-resistant mechanisms to improve the resistance to denial-of-service attacks in key establishment protocols.
Resumo:
Objective: To examine the impact on dental utilisation following the introduction of a participating provider scheme (Regional and Rural Oral Health Program {RROHP)). In this model dentists receive higher third party payments from a private health insurance fund for delivering an agreed range of preventive and diagnostic benefits at no out-ofpocket cost to insured patients. Data source/Study setting: Hospitals Contribution Fund of Australia (HCF) dental claims for all members resident in New South Wales over the six financial years from l99811999 to 200312004. Study design: This cohort study involves before and after analyses of dental claims experience over a six year period for approximately 81,000 individuals in the intervention group (HCF members resident in regional and rural New South Wales, Australia) and 267,000 in the control group (HCF members resident in the Sydney area). Only claims for individuals who were members of HCF at 31 December 1997 were included. The analysis groups claims into the three years prior to the establishment of the RROHP and the three years subsequent to implementation. Data collection/Extraction methods: The analysis is based on all claims submitted by users of services for visits between 1 July 1988 and 30 June 2004. In these data approximately 1,000,000 services were provided to the intervention group and approximately 4,900,000 in the control group. Principal findings: Using Statistical Process Control (SPC) charts, special cause variation was identified in total utilisation rate of private dental services in the intervention group post implementation. No such variation was present in the control group. On average in the three years after implementation of the program the utilisation rate of dental services by regional and rural residents of New South Wales who where members of HCF grew by 12.6%, over eight times the growth rate of 1.5% observed in the control group (HCF members who were Sydney residents). The differences were even more pronounced in the areas of service that were the focus of the program: diagnostic and preventive services. Conclusion: The implementation of a benefit design change, a participating provider scheme, that involved the removal of CO-payments on a defined range of preventive and diagnostic dental services combined with the establishment and promotion of a network of dentists, appears to have had a marked impact on HCF members' utilisation of dental services in regional and rural New South Wales, Australia.
Resumo:
An earlier CRC-CI project on ‘automatic estimating’ (AE) has shown the key benefit of model-based design methodologies in building design and construction to be the provision of timely quantitative cost evaluations. Furthermore, using AE during design improves design options, and results in improved design turn-around times, better design quality and/or lower costs. However, AEs for civil engineering structures do not exist; and research partners in the CRC-CI expressed interest in exploring the development of such a process. This document reports on these investigations. The central objective of the study was to evaluate the benefits and costs of developing an AE for concrete civil engineering works. By studying existing documents and through interviews with design engineers, contractors and estimators, we have established that current civil engineering practices (mainly roads/bridges) do not use model-based planning/design. Drawings are executed in 2D and only completed at the end of lengthy planning/design project management lifecycle stages. We have also determined that estimating plays two important, but different roles. The first is part of project management (which we have called macro level estimating). Estimating in this domain sets project budgets, controls quality delivery and contains costs. The second role is estimating during planning/design (micro level estimating). The difference between the two roles is that the former is performed at the end of various lifecycle stages, whereas the latter is performed at any suitable time during planning/design.
Resumo:
This paper describes the operation of a microgrid that contains a custom power park (CPP). The park may contain an unbalanced and/or nonlinear load and the microgrid may contain many dis-tributed generators (DGs). One of the DGs in the microgrid is used as a compensator to achieve load compensation. A new method is proposed for current reference generation for load compensation, which takes into account the real and reactive power to be supplied by the DG connected to the compensator. The real and reactive power from the DGs and the utility source is tightly regulated assuming that dedicated communication channels are available. Therefore this scheme is most suitable in cases where the loads in CPP and DGs are physically located close to each other. The proposal is validated through extensive simulation studies using EMTDC/PSCAD software package (version 4.2).
Resumo:
Designing and estimating civil concrete structures is a complex process which to many practitioners is tied to manual or semi-manual processes of 2D design and cannot be further improved by automated, interacting design-estimating processes. This paper presents a feasibility study for the development an automated estimator for concrete bridge design. The study offers a value proposition: an efficient automated model-based estimator can add value to the whole bridge design-estimating process, i.e., reducing estimation errors, shortening the duration of success estimates, and increasing the benefit of doing cost estimation when compared with the current practice. This is then followed by a description of what is in an efficient automated model-based estimator and how it should be used. Finally the process of model-based estimating is compared with the current practice to highlight the values embedded in the automated processes.