765 resultados para Cost Planning
Resumo:
A statistical approach is used in the design of a battery-supercapacitor energy storage system for a wind farm. The design exploits the technical merits of the two energy storage mediums, in terms of the differences in their specific power and energy densities, and their ability to accommodate different rates of change in the charging/discharging powers. By treating the input wind power as random and using a proposed coordinated power flows control strategy for the battery and the supercapacitor, the approach evaluates the energy storage capacities, the corresponding expected life cycle cost/year of the storage mediums, and the expected cost/year of unmet power dispatch. A computational procedure is then developed for the design of a least-cost/year hybrid energy storage system to realize wind power dispatch at a specified confidence level.
Resumo:
This paper presents a method to enable a mobile robot working in non-stationary environments to plan its path and localize within multiple map hypotheses simultaneously. The maps are generated using a long-term and short-term memory mechanism that ensures only persistent configurations in the environment are selected to create the maps. In order to evaluate the proposed method, experimentation is conducted in an office environment. Compared to navigation systems that use only one map, our system produces superior path planning and navigation in a non-stationary environment where paths can be blocked periodically, a common scenario which poses significant challenges for typical planners.
Resumo:
The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.
Resumo:
Background In 2002/03 the Queensland Government responded to high rates of alcohol-related harm in discrete Indigenous communities by implementing alcohol management plans (AMPs), designed to include supply and harm reduction and treatment measures. Tighter alcohol supply and carriage restrictions followed in 2008 following indications of reductions in violence and injury. Despite the plans being in place for over a decade, no comprehensive independent review has assessed to what level the designed aims were achieved and what effect the plans have had on Indigenous community residents and service providers. This study will describe the long-term impacts on important health, economic and social outcomes of Queensland’s AMPs. Methods/Design The project has two main studies, 1) outcome evaluation using de-identified epidemiological data on injury, violence and other health and social indicators for across Queensland, including de-identified databases compiled from relevant routinely-available administrative data sets, and 2) a process evaluation to map the nature, timing and content of intervention components targeting alcohol. Process evaluation will also be used to assess the fidelity with which the designed intervention components have been implemented, their uptake and community responses to them and their perceived impacts on alcohol supply and consumption, injury, violence and community health. Interviews and focus groups with Indigenous residents and service providers will be used. The study will be conducted in all 24 of Queensland’s Indigenous communities affected by alcohol management plans. Discussion This evaluation will report on the impacts of the original aims for AMPs, what impact they have had on Indigenous residents and service providers. A central outcome will be the establishment of relevant databases describing the parameters of the changes seen. This will permit comprehensive and rigorous surveillance systems to be put in place and provided to communities empowering them with the best credible evidence to judge future policy and program requirements for themselves. The project will inform impending alcohol policy and program adjustments in Queensland and other Australian jurisdictions. The project has been approved by the James Cook University Human Research Ethics Committee (approval number H4967 & H5241).
Resumo:
The Wet Tropics region has a unique water asset and is also considered a priority region for the improvement of water quality entering the Great Barrier Reef due to a combination of high rainfall, intensive agricultural use, urban areas and the proximity of valuable reef assets to the coast. Agricultural activities are one of many identified threats to water quality and water flows in the Wet Tropics in terms of sediment and pollutant-related water quality decline. Information describing the current state of agricultural management practices across the region is patchy at best. Based on the best available information on agricultural management practices in the Wet Tropics in 2008, it is clear that opportunities exist to improve nutrient, sediment and pesticide management practice to reduce the impact on the water asset and the Great Barrier Reef. Based on current understandings of practices and the relationship between practices and reef water quality, the greatest opportunities for improved water quality are as follows: · nutrients – correct rate and the placement of fertilisers; · pesticides – improve weed control planning, herbicide rates and calibration practice; and · soil and sediment – implement new farming system practices. The 2008-09 Reef Rescue program sought to accelerate the rate of adoption of improved management practices and through Terrain invested $6.8M in the 2008-09 year for: · landholder water quality improvement incentive payments; · cross regional catchment repair of wetlands and riparian lands in areas of high sediment or nutrient loss; and · partnerships in the region to lever resources and support for on-ground practice change. The program delivered $3,021,999 in onground incentives to landholders in the Wet Tropics to improve farm practices from D or C level to B or A level. The landholder Water Quality Incentives Grants program received 300 individual applications for funding and funded 143 individual landholders to implement practice change across 36,098 ha of farm land. It is estimated that the Reef Rescue program facilitated practice change across 21% of the cane industry, and 20% of the banana industry. The program levered an additional $2,441,166 in landholder cash contributions and a further $907,653 in non-cash in-kind contributions bringing the total project value of the landholder grants program in the Wet Tropics to $6,370,819. Most funded projects targeted multiple water quality objectives with a focus on nutrient and sediment reduction. Of the 143 projects funded, 115 projects addressed nutrient management either as the primary focus or in combination with strategies that targeted other water quality objectives. Overall, 82 projects addressed two or more water quality targets. Forty-five percent of incentive funds were allocated to new farming system practices (direct drill legumes, zonal tillage equipment, permanent beds, min till planting equipment, GPS units, laser levelling), followed by 24% allocated to subsurface fertiliser applicators (subsurface application of fertiliser using a stool splitter or beside the stool, at the correct Six Easy Steps rate). As a result, Terrain estimates that the incentive grants achieved considerable reductions in nitrogen, phosphorus, sediment and pesticide loads. The program supported nutrient management training of 167 growers managing farms covering over 20% of the area harvested in 2008, and 18 industry advisors and resellers. This resulted in 115 growers (155 farms) developing nutrient management plans. The program also supported Integrated Weed Management training of 80 growers managing farms covering 8% of the area harvested in 2008, and 6 industry advisors and resellers. This report, which draws on the best available Reef Rescue Management Monitoring, Evaluation, Reporting, and Improvement (MERI) information to evaluate program performance and impact on water quality outcomes, is the first in a series of annual reports that will assess and evaluate the impact of the Reef Rescue program on agricultural practices and water quality outcomes. The assessment is predominantly focused on the cane industry because of data availability. In the next stage, efforts will expand to: · improve practice data for the banana and grazing industry; · gain a better understanding of the water quality trends and the factors influencing them in the Wet Tropics; in particular work will focus on linking the results of the Paddock to Reef monitoring program and practice change data to assess program impact; · enhance estimations of the impact of practice change on pollutant loads from agricultural land use; · gain a better understanding of the extent of ancillary practice (change not directly funded) resulting from Reef Rescue training/ education/communication programs; and · provide a better understanding of the economic cost of practice change across the Wet Tropics region. From an ecological perspective, water quality trends and the factors that may be contributing to change, require further investigation. There is a critical need to work towards an enhanced understanding of the link between catchment land management practice change and reef water quality, so that reduced nutrient, sediment, and pesticide discharge to the Great Barrier Reef can be quantified. This will also assist with future prioritisation of grants money to agricultural industries, catchments and sub catchments. From a social perspective, the program has delivered significant water quality benefits from landholder education and training. It is believed that these activities are giving landholders the information and tools to implement further lasting change in their production systems and in doing so, creating a change in attitude that is supportive and inclusive of Natural Resource Management (NRM). The program in the Wet Tropics has also considerably strengthened institutional partnerships for NRM, particularly between NRM and industry and extension organisations. As a result of the Reef Rescue program, all institutions are actively working together to collectively improve water quality. The Reef Rescue program is improving water quality entering the Great Barrier Reef Lagoon by catalysing substantial activity in the Wet Tropics region to improve land management practices and reduce the water quality impact of agricultural landscapes. The solid institutional partnerships between the regional body, industry, catchment and government organisations have been fundamental to the successful delivery of the landholder grant and catchment rehabilitation programs. Landholders have generally had a positive perception and reaction to the program, its intent, and the practical, focused nature of grant-based support. Demand in the program was extremely high in 2008-09 and is expected to increase in 2009-2010.
Resumo:
Business planning is at the core of entrepreneurship as it has implications for opportunity discovery and exploitation. This thesis' objectives are to disentangle the relationships between business planning and venture emergence to reconcile previous inconsistent findings. It reveals that the formalization of planning, the effort invested in the venture and the revision of the plan influence success for entrepreneurs in the process of launching their firm. This thesis provides generalizable results about the phenomenon of business planning by using a longitudinal random sample of emerging firms.
Resumo:
INTRODUCTION: Increasing health care costs, limited resources and increased demand makes cost effective and cost-efficient delivery of Adolescent Idiopathic Scoliosis (AIS) management paramount. Rising implant costs in deformity correction surgery have prompted analysis of whether high implant densities are justified. The objective of this study was to analyse the costs of thoracoscopic scoliosis surgery, comparing initial learning curve costs with those of the established technique and to the costs involved in posterior instrumented fusion from the literature. METHODS: 189 consecutive cases from April 2000 to July 2011 were assessed with a minimum of 2 years follow-up. Information was gathered from a prospective database covering perioperative factors, clinical and radiological outcomes, complications and patient reported outcomes. The patients were divided into three groups to allow comparison; 1. A learning curve cohort, 2. An intermediate cohort and 3. A third cohort of patients, using our established technique. Hospital finance records and implant manufacturer figures were corrected to 2013 costs. A literature review of AIS management costs and implant density in similar curve types was performed. RESULTS: The mean pre-op Cobb angle was 53°(95%CI 0.4) and was corrected postop to mean 22.9°(CI 0.4). The overall complication rate was 20.6%, primarily in the first cohort, with a rate of 5.6% in the third cohort. The average total costs were $46,732, operating room costs of $10,301 (22.0%) and ICU costs of $4620 (9.8%). The mean number of screws placed was 7.1 (CI 0.04) with a single rod used for each case giving average implant costs of $14,004 (29.9%). Comparison of the three groups revealed higher implant costs as the technique evolved to that in use today, from $13,049 in Group 1 to $14577 in Group 3 (P<0.001). Conversely operating room costs reduced from $10,621 in Group 1 to $7573 (P<0.001) in Group 3. ICU stay was reduced from an average of 1.2 to 0 days. In-patient stay was significantly (P=0.006) lower in Groups 2 and 3 (5.4 days) than Group 1 (5.9 days) (i.e. a reduction in cost of approximately $6,140). CONCLUSIONS: The evolution of our thoracoscopic anterior scoliosis correction has resulted in an increase in the number of levels fused and reduction in complication rate. Implant costs have risen as a result, however, there has been a concurrent decrease in those costs generated by operating room use, ICU and in-patient stay with increasing experience. Literature review of equivalent curve types treated posteriorly shows similar perioperative factors but higher implant density, 69-83% compared to the 50% in this study. Thoracoscopic Scoliosis surgery presents a low density, reliable, efficient and effective option for selected curves. A cost analysis of Thoracoscopic Scoliosis Surgery using financial records and a prospectively collected database of all patients since 2000, demonstrating a clear cost advantage compared to equivalent posterior instrumentation and fusion.
Resumo:
Level crossing risk continues to be a significant safety concern for the security of rail operations around the world. Over the last decade or so, a third of railway related fatalities occurred as a direct result of collisions between road and rail vehicles in Australia. Importantly, nearly half of these collisions occurred at railway level crossings with no active protection, such as flashing lights or boom barriers. Current practice is to upgrade level crossings that have no active protection. However, the total number of level crossings found across Australia exceed 23,500, and targeting the proportion of these that are considered high risk (e.g. public crossings with passive controls) would cost in excess of AU$3.25 billion based on equipment, installation and commissioning costs of warning devices that are currently type approved. Level crossing warning devices that are low-cost provide a potentially effective control for reducing risk; however, over the last decade, there have been significant barriers and legal issues in both Australia and the US that have foreshadowed their adoption. These devices are designed to have significantly lower lifecycle costs compared with traditional warning devices. They often make use of use of alternative technologies for train detection, wireless connectivity and solar energy supply. This paper describes the barriers that have been encountered for the adoption of these devices in Australia, including the challenges associated with: (1) determining requisite safety levels for such devices; (2) legal issues relating to duty of care obligations of railway operators; and (3) issues of Tort liability around the use of less than fail-safe equipment. This paper provides an overview of a comprehensive safety justification that was developed as part of a project funded by a collaborative rail research initiative established by the Australian government, and describes the conceptual framework and processes being used to justify its adoption. The paper provides a summary of key points from peer review and discusses prospective barriers that may need to be overcome for future adoption. A successful outcome from this process would result in the development of a guideline for decision-making, providing a precedence for adopting low-cost level crossing warning devices in other parts of the world. The framework described in this paper also provides relevance to the review and adoption of analogous technologies in rail and other safety critical industries.
Resumo:
During the early design stages of construction projects, accurate and timely cost feedback is critical to design decision making. This is particularly challenging for cost estimators, as they must quickly and accurately estimate the cost of the building when the design is still incomplete and evolving. State-of-the-art software tools typically use a rule-based approach to generate detailed quantities from the design details present in a building model and relate them to the cost items in a cost estimating database. In this paper, we propose a generic approach for creating and maintaining a cost estimate using flexible mappings between a building model and a cost estimate. The approach uses queries on the building design that are used to populate views, and each view is then associated with one or more cost items. The benefit of this approach is that the flexibility of modern query languages allows the estimator to encode a broad variety of relationships between the design and estimate. It also avoids the use of a common standard to which both designers and estimators must conform, allowing the estimator added flexibility and functionality to their work.
Resumo:
ROBERT EVAPORATORS in Australian sugar factories are traditionally constructed with 44.45 mm outside diameter stainless steel tubes of ~2 m length for all stages of evaporation. There are a few vessels with longer tubes (up to 2.8 m) and smaller and larger diameters (38.1 and 50.8 mm). Queensland University of Technology is undertaking a study to investigate the heat transfer performance of tubes of different lengths and diameters for the whole range of process conditions typically encountered in the evaporator set. Incorporation of these results into practical evaporator designs requires an understanding of the cost implications for constructing evaporator vessels with calandrias having tubes of different dimensions. Cost savings are expected for tubes of smaller diameter and longer length in terms of material, labour and installation costs in the factory. However these savings must be considered in terms of the heat transfer area requirements for the evaporation duty, which will likely be a function of the tube dimensions. In this paper a capital cost model is described which provides a relative cost of constructing and installing Robert evaporators of the same heating surface area but with different tube dimensions. Evaporators of 2000, 3000, 4000 and 5000 m2 are investigated. This model will be used in conjunction with the heat transfer efficiency data (when available) to determine the optimum tube dimensions for a new evaporator at a specified evaporation duty. Consideration is also given to other factors such as juice residence time (and implications for sucrose degradation and control) and droplet de-entrainment in evaporators of different tube dimensions.
Resumo:
Late intervention often means that young people on the autism spectrum appear to act on impulse, seem disorganized, or fail to learn from past experiences. In this practical, effective resource, the authors share tried and tested techniques for creating and using a personal planner to help individuals on the autism spectrum to develop independence. "Planning to Learn" is split into three parts. The first part guides adults in helping young people to make sense of the world and to develop and practise coping strategies for any given situation. The authors also explain how simple visual and verbal cues can help people to cope successfully in stressful situations. The second part provides worksheets for the young person to complete to learn how to use plans in different situations, for example staying calm when waiting for a doctor, or coping with a change in the school timetable. Each individual makes a unique planner with procedures to refer to, such as responding to pressure, calming down, being organised, and being around people. The third part includes useful cards, schedules and plans for photocopying and including in the planner. This illustrated photocopiable workbook is packed with guidance, support and helpful notes for those new to, or experienced in, working with children and young people with ASD. It can be used within educational and community settings or at home.
Resumo:
Objective To summarise how costs and health benefits will change with the adoption of total laparoscopic hysterectomy compared to total abdominal hysterectomy for the treatment of early stage endometrial cancer. Design Cost-effectiveness modelling using the information from a randomised controlled trial. Participants Two hypothetical modelled cohorts of 1000 individuals undergoing total laparoscopic hysterectomy and total abdominal hysterectomy. Outcome measures Surgery costs; hospital bed days used; total healthcare costs; quality-adjusted life years; and net monetary benefits. Results For 1000 individuals receiving total laparoscopic hysterectomy surgery, the costs were $509 575 higher, 3548 hospital fewer bed days were used and total health services costs were reduced by $3 746 221. There were 39.13 more quality-adjusted life years for a 5 year period following surgery. Conclusions The adoption of total laparoscopic hysterectomy is almost certainly a good decision for health services policy makers. There is 100% probability that it will be cost saving to health services, a 86.8% probability that it will increase health benefits and a 99.5% chance that it returns net monetary benefits greater than zero.
Resumo:
Aims To provide the best available evidence to determine the impact of nurse practitioner services on cost, quality of care, satisfaction and waiting times in the emergency department for adult patients. Background The delivery of quality care in the emergency department is one of the most important service indicators in health delivery. Increasing service pressures in the emergency department have resulted in the adoption of service innovation models: the most common and rapidly expanding of these is emergency nurse practitioner services. The rapid uptake of emergency nurse practitioner service in Australia has outpaced the capacity to evaluate this service model in terms of outcomes related to safety and quality of patient care. Previous research is now outdated and not commensurate with the changing domain of delivering emergency care with nurse practitioner services. Data A comprehensive search of four electronic databases from 2006-‐2013 was conducted to identify research evaluating nurse practitioner service impact in the emergency department. English language articles were sought using MEDLINE, CINAHL, Embase and Cochrane and included two previous systematic reviews completed five and seven years ago. Methods A three step approach was used. Following a comprehensive search, two reviewers assessed identified studies against the inclusion criteria. From the original 1013 studies, 14 papers were retained for critical appraisal on methodological quality by two independent reviewers and data extracted using standardised tools. Results Narrative synthesis was conducted to summarise and report the findings as insufficient data was available for meta-‐analysis of results. This systematic review has shown that emergency nurse practitioner service has a positive impact on quality of care, patient satisfaction and waiting times. There was insufficient evidence to draw conclusions regarding impact on costs. Conclusion Synthesis of the available research attempts to provide an evidence base for emergency nurse practitioner service to guide healthcare leaders, policy makers and clinicians in reforming emergency department service provision. The findings suggest that further quality research is required for comparative measures of clinical and service effectiveness of emergency nurse practitioner service. In the context of increased health service demand and the need to provide timely and effective care to patients, such measures will assist in delivering quality patient care.
Resumo:
Purpose This study explores recent claims that humans exhibit a minimum cost of transport (CoTmin) for running which occurs at an intermediate speed, and assesses individual physiological, gait and training characteristics. Methods Twelve healthy participants with varying levels of fitness and running experience ran on a treadmill at six self-selected speeds in a discontinuous protocol over three sessions. Running speed (km[middle dot]hr-1), V[spacing dot above]O2 (mL[middle dot]kg-1[middle dot]km-1), CoT (kcal[middle dot]km-1), heart rate (beats[middle dot]min-1) and cadence (steps[middle dot]min-1) were continuously measured. V[spacing dot above]O2 max was measured on a fourth testing session. The occurrence of a CoTmin was investigated and its presence or absence examined with respect to fitness, gait and training characteristics. Results Five participants showed a clear CoTmin at an intermediate speed and a statistically significant (p < 0.05) quadratic CoT-speed function, while the other participants did not show such evidence. Participants were then categorized and compared with respect to the strength of evidence for a CoTmin (ClearCoTmin and NoCoTmin). The ClearCoTmin group displayed significantly higher correlation between speed and cadence; more endurance training and exercise sessions per week; than the NoCoTmin group; and a marginally non-significant but higher aerobic capacity. Some runners still showed a CoTmin at an intermediate speed even after subtraction of resting energy expenditure. Conclusion The findings confirm the existence of an optimal speed for human running, in some but not all participants. Those exhibiting a COTmin undertook a higher volume of running, ran with a cadence that was more consistently modulated with speed, and tended to be aerobically fitter. The ability to minimise the energetic cost of transport appears not to be ubiquitous feature of human running but may emerge in some individuals with extensive running experience.