634 resultados para Asset Management Contracts
Resumo:
Recent shifts in education and labour market policy have resulted in universities being placed under increasing pressure to produce employable graduates. However, contention exists regarding exactly what constitutes employability and which graduate attributes are required to foster employability in tertiary students. This paper argues that in the context of a rapidly changing information- and knowledge-intensive economy, employability involves far more than possession of the generic skills listed by graduate employers as attractive. Rather, for optimal economic and social outcomes, graduates must be able to proactively navigate the world of work and self-manage the career building process. A model of desirable graduate attributes that acknowledges the importance of self-management and career building skills to lifelong career management and enhanced employability is presented. Some important considerations for the implementation of effective university career management programs are then outlined.
Resumo:
This paper proposes a method for power flow control between utility and microgrid through back-to-back converters, which facilitates desired real and reactive power flow between utility and microgrid. In the proposed control strategy, the system can run in two different modes depending on the power requirement in the microgrid. In mode-1, specified amount of real and reactive power are shared between the utility and the microgrid through the back-to-back converters. Mode-2 is invoked when the power that can be supplied by the DGs in the microgrid reaches its maximum limit. In such a case, the rest of the power demand of the microgrid has to be supplied by the utility. An arrangement between DGs in the microgrid is proposed to achieve load sharing in both grid connected and islanded modes. The back-to-back converters also provide total frequency isolation between the utility and the microgrid. It is shown that the voltage or frequency fluctuation in the utility side has no impact on voltage or power in microgrid side. Proper relay-breaker operation coordination is proposed during fault along with the blocking of the back-to-back converters for seamless resynchronization. Both impedance and motor type loads are considered to verify the system stability. The impact of dc side voltage fluctuation of the DGs and DG tripping on power sharing is also investigated. The efficacy of the proposed control ar-rangement has been validated through simulation for various operating conditions. The model of the microgrid power system is simulated in PSCAD.
Resumo:
The following paper presents an evaluation of airborne sensors for use in vegetation management in powerline corridors. Three integral stages in the management process are addressed including, the detection of trees, relative positioning with respect to the nearest powerline and vegetation height estimation. Image data, including multi-spectral and high resolution, are analyzed along with LiDAR data captured from fixed wing aircraft. Ground truth data is then used to establish the accuracy and reliability of each sensor thus providing a quantitative comparison of sensor options. Tree detection was achieved through crown delineation using a Pulse-Coupled Neural Network (PCNN) and morphologic reconstruction applied to multi-spectral imagery. Through testing it was shown to achieve a detection rate of 96%, while the accuracy in segmenting groups of trees and single trees correctly was shown to be 75%. Relative positioning using LiDAR achieved a RMSE of 1.4m and 2.1m for cross track distance and along track position respectively, while Direct Georeferencing achieved RMSE of 3.1m in both instances. The estimation of pole and tree heights measured with LiDAR had a RMSE of 0.4m and 0.9m respectively, while Stereo Matching achieved 1.5m and 2.9m. Overall a small number of poles were missed with detection rates of 98% and 95% for LiDAR and Stereo Matching.
Resumo:
The objective of this paper is to take a first step in developing a theoretical framework describing the role of HRM in successful CI, based on the current literature from both fields. To this end, elements from the CI Maturity Model and a framework depicting the role of HRM in innovation serve as a foundation for examining how specific bundles of HRM practices utilised during different phases of the CI implementation process may contribute to sustained organisational and enhanced operational performance. The primary contribution of this paper is theoretical; however, the framework has practical value in that it suggests important relationships between HRM practices and behaviours necessary for successful CI. A preliminary test of the framework in an empirical setting is summarised at the conclusion of this paper, where a number of possible research avenues are also suggested.
Resumo:
Management of acute heart failure is an important consideration in critical care. Mechanical support of the failing heart is crucial for improving health outcomes. The most common Australasian application of intraaortic balloon counterpulsation (IABP) is in the setting of cardiogenic shock. High end users of IABP (>37/annum) demonstrate significantly lower mortality for cardiogenic shock managed with IABP (p <0.001) in contrast to hospitals which employ limited IABP (<4/annum). This underscores the importance of proficiency in managing patient receiving IABP support. Nurses play a crucial role in carding for patients with acute heart failure. This paper summarises care considerations for management of the IABP.
Resumo:
This article assesses the 'Managing Diversity' (MD) approach in Australia, examining its drivers, discussing its relationship to legislation designed to promote equity, and examining it as a set of management practices. It has been plausibly argued, on efficiency grounds, that responsibility for achieving equality objectives must be shifted to organisations as this links contextual conditions to organisational processes. However, even where there is some prescription and guidance such as that provided by Australian Equal Employment Opportunity (EEO) legislation targeted specifically to women employees, both practice and outcomes are variable. This is even more the case with MD where there are no guiding principles or legislative support. The article examines the best practice EEO and MD programs of Australian organisations to demonstrate the approaches and programs that are being developed at the workplace and to highlight the limitations of the 'business case' approach underlying such programs.
Resumo:
This paper has two main sections, the first of which presents a summarized review of the literature concerning previous studies on the implementation of ISO 9000 quality management systems (QMSs) both in global construction companies as well as in Indonesian construction firms, and the perceived correlation between organisational culture and QMS practices in the construction sector. The first section of the paper contributes to the development of the second section, which presents details of the research project being undertaken. Based on the fundamental questions that led to the development of the main research objectives, suitable research methods have been developed in order to meet these objectives. Primary data will be collected by use of a mixed methods approach, i.e., questionnaire surveys and focus group discussions/interviews in order to obtain opinions from respondents drawn from targeted ISO construction firms. Most of the data expected to be obtained will be in future be analyzed using statistical software then the findings will be discussed in order to ultimately develop a culture-based QMS framework.
Resumo:
The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development.
Resumo:
It is the purpose of this article to examine the means curently available to judges to achieve a workable balance between providing appropriate consumer protection to signatories of standard form contractors while still retaining adequate respect for the sanctity of contract, and, based on this analysis, to determine whether a significantly greater scope of contract (re)construction is likely to become the norm in most common law jurisdictions in the coming decades.
Resumo:
Over the past decade there have been a large number of significant innovations in manufacturing which have resulted in more flexible and cost efficient methods and higher quality products, as manufacturers have set about upgrading their processes, systems and performance. This study compares the use of technologies and improvement programs between OECD and Non-OECD countries, and also between small and large firms, and examines differences in the use and outcomes across the economies and different sized firms. The empirical analysis provides an opportunity to test whether the ‘capabilities’ or strengths of a firm can be linked to these activities and examines if developing economies are using technology or management programs such as quality management and business process re-engineering to catch up to manufacturers in developed economies. The analysis utilises data from the second International Manufacturing Strategy Survey (IMSS), which encompasses 703 firms in 23 countries.
Resumo:
Section 35 of the Insurance Contracts Act 1984 requires insurers offering insurance policies in six prescribed areas "to clearly inform" prospective insureds of any departure their policies may constitute from the standard covers established by the Act and its accompanying Regulations. This prescribed insurance contracts regime was designed to remedy comprehension problems generated by the length and complexity of insurance documents and to alleviate misunderstanding over the terms and conditions of individual policies. This article examines the rationale underpinning s 35 and the prescribed insurance contracts regime and looks at the operation of the legislation with particular reference to home contents insurance in Australia. It is argued that the means whereby disclosure of derogation from standard cover may be effected largely negates the thrust of the prescribed insurance contract reform. Recommendations to address these operational deficiencies are made.
Resumo:
The requirements that an insured disclose all facts material to a transaction as well as not misrepresent material facts in the formation of an insurance contract are universal requirements of insurance law. The nature and extent of these obligations varies from one jurisdiction to the next. Disclosure in the insurance context is distinct from the general approach in commercial contracts, and in others between persons dealing at arm's length. It is the purpose of this article therefore to examine, on a comparative basis, the approaches adopted in the Anglo-Commonwealth context of England, Australia New Zealand and Singapore to the resolution of disclose issues in the formation of insurance contracts. Particular attention is focused on the Insurance Contracts Act 1984 (Australia) as this statue effects the most significant overhaul of the common law and the National Consumer Council in the United Kingdom has advocated that similar reforms be adopted.
Resumo:
Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.