745 resultados para Intercultural communication -- China


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This PETAA paper discusses how the cross-curriculum priority concerned with developing Asia literacy, namely ‘Asia and Australia’s engagement with Asia’, can be significantly advanced through the study of children’s literature. The discussion proceeds from a brief overview of the historical development of Asia literacy to its current place within the Australian Curriculum. It then considers the potential of literature for assisting students and teachers in realising this priority through the Asian-Australian Children’s Literature and Publishing dataset, a research project on AustLit. Finally, it discusses a small selection of texts – two picture books and a novel – with suggestions or prompts for raising students’ intercultural understanding.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For the purpose of developing collaborative support in design studio environments, we have carried out ethnographic fieldwork in professional and academic product design studios. Our intention was to understand design practices beyond the productivity point of view and take into account the experiential, inspirational and aesthetical aspects of design practices. Using examples from our fieldwork, we develop our results around three broad themes by which design professionals support communication and collaboration: (1) use of artefacts, (2) use of space and (3) designerly practices. We use the results of our fieldwork for drawing implications for designing technologies for the design studio culture.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The recent floods in south-east Queensland have focused policy, academic and community attention on the challenges associated with severe weather events (SWE), specifically pre-disaster preparation, disaster-response and post-disaster community resilience. Financially, the cost of SWE was $9 billion in the 2011 Australian Federal Budget (Swan 2011); psychologically and emotionally, the impact on individual mental health and community wellbeing is also significant but more difficult to quantify. However, recent estimates suggest that as many as one in five will subsequently experience major emotional distress (Bonanno et al. 2010). With climate change predicted to increase the frequency and intensity of a wide range of SWE in Australia (Garnaut 2011; The Climate Institute 2011), there is an urgent and critical need to ensure that the unique psychological and social needs of more vulnerable community members - such as older residents - are better understood and integrated into disaster preparedness and response policy, planning and protocols. Navigating the complex dynamics of SWE can be particularly challenging for older adults and their disaster experience is frequently magnified by a wide array of cumulative and interactive stressors, which intertwine to make them uniquely vulnerable to significant short and long-term adverse effects. This current article provides a brief introduction to the current literature in this area and highlights a gap in the research relating to communication tools during and after severe weather events.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This case study was conducted to explore the perceptions of health risk messages sent by the Japanese Government following the Fukushima nuclear power plant disaster. The content of health risk messages from the Japanese Government and the Japanese national broadcaster (NHK) were analysed and semi-structured interviews were conducted with a sample of Tokyo residents. Initially, participants trusted these messages but as the crisis unfolded they became sceptical about the messages. Participants felt the messages did not communicate health risk information effectively because the messages were; not supported by evidence, inconsistent, delayed and changed over time. Despite widespread access to the internet, social media and mobile telephones, most participants relied on television news for information about the health risks. The Japanese Government urgently needs to re-build trust by engaging the community in the planning and development phases of health risk communication strategies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The growing dominance of project planning cycles and results-based management in development over the past 20 years has significant implications for the effective evaluation of communication for development and social change and the sustainability of these processes. These approaches to development and evaluation usually give priority to the linear, logical framework (or log frame) approach promoted by many development institutions. This tends to emphasize upward accountability approaches to development and its evaluation, so that development is driven by exogenous rather than endogenous models of development and social change. Such approaches are underpinned by ideas of preplanning, and predetermination of what successful out -comes look like. In this way, outcomes of complex interventions tend to be reduced to simple, cause-effect processes and the categorization of things, including people (Chambers and Pettit 2004; Eyben 2011). This runs counter to communication for development approaches, which prioritize engagement, relationships, empowerment and dialogue as important components for positive social change.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As the biggest expo site in history, construction of the Shanghai Expo site faced a lot of challenges, including involvement of lots of investors, megaconstruction scale, concurrent construction mode, involvement of more than 40,000 migrant workers, and extremely tight completion deadlines, among others. Consequently, these challenges imposed great obstacles on accomplishing the safety, quality, and environmental goals. Through a case study of the Shanghai Expo construction, this paper paper presents the design and implementation of multicriteria incentives in megaprojects to accomplish the safety, quality, and environmental goals. Both quantitative and qualitative findings were triangulated to demonstrate the outcome of the incentives. Six critical success factors (CSFs) for the incentives, rule design, process orientation, top management support, training and promotion, communication in process, and process learning and improvement are identified and validated through case study data and content analysis. It is believed that the findings of this paper can enhance understanding of multicriteria incentive schemes in general and provide insights in implementing these incentive schemes in future megaprojects, particularly in the People’s Republic of China (PRC).

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this research was to develop a model to estimate future freeway pavement construction costs in Henan Province, China. A comprehensive set of factors contributing to the cost of freeway pavement construction were included in the model formulation. These factors comprehensively reflect the characteristics of region and topography and altitude variation, the cost of labour, material, and equipment, and time-related variables such as index numbers of labour prices, material prices and equipment prices. An Artificial Neural Network model using the Back-Propagation learning algorithm was developed to estimate the cost of freeway pavement construction. A total of 88 valid freeway cases were obtained from freeway construction projects let by the Henan Transportation Department during the period 1994−2007. Data from a random selection of 81 freeway cases were used to train the Neural Network model and the remaining data were used to test the performance of the Neural Network model. The tested model was used to predict freeway pavement construction costs in 2010 based on predictions of input values. In addition, this paper provides a suggested correction for the prediction of the value for the future freeway pavement construction costs. Since the change in future freeway pavement construction cost is affected by many factors, the predictions obtained by the proposed method, and therefore the model, will need to be tested once actual data are obtained.