603 resultados para Construction projects
Resumo:
Levels of waste within the construction industry need to be reduced for environmental and economic reasons. Changing people's wasteful behaviour can make a significant contribution. This paper describes a research project that used Ajzen's 'theory of planned behaviour' to investigate the attitudinal forces that shape behaviour at the operative level. It concludes that operatives see waste as an inevitable by-product of construction activity. Attitudes towards waste management are not negative, although they are pragmatic and impeded by perceptions of a lack of managerial commitment. Waste management is perceived as a low project priority, and there is an absence of appropriate resources and incentives to support it. A theory of waste behaviour is proposed for the construction industry, and recommendations are made to help managers improve operatives' attitudes towards waste.
Resumo:
This paper draws on a major study the authors conducted for the Australian Government in 2009. It focuses on the diffusion issues surrounding the uptake of sustainable building and construction products in Australia. Innovative sustainable products can minimise the environmental impact during construction, while maximising asset performance, durability and re-use. However, there are significant challenges faced by designers and clients in the selection of appropriate sustainable products in consideration of the integrated design solution, including overall energy efficiency, water conservation, maintenance and durability, low-impact use and consumption. The paper is a review of the current state of sustainable energy and material product innovations in Australia. It examines the system dynamics surrounding these innovations as well as the drivers and obstacles to their diffusion throughout the Australian construction industry. The case product types reviewed comprise: solar energy technology, small wind turbines, advanced concrete technology, and warm-mixed asphalt. The conclusions highlight the important role played by Australian governments in facilitating improved adoption rates. This applies to governments in their various roles, but particularly as clients/owners, regulators, and investors in education, training, research and development. In their role as clients/owners, the paper suggests that government can better facilitate innovation within the construction industry by adjusting specification policies to encourage the uptake of sustainable products. In the role as regulators, findings suggest governments should be encouraging the application of innovative finance options and positive end-user incentives to promote sustainable product uptake. Also, further education for project-based firms and the client/end users about the long-term financial and environmental benefits of innovative sustainable products is required. As more of the economy’s resources are diverted away from business-as-usual and into the use of sustainable products, some project-based firms may face short-term financial pain in re-shaping their businesses. Government policy initiatives can encourage firms make the necessary adjustments to improve innovative sustainable product diffusion throughout the industry.
Resumo:
Major construction sites in Australia have an above average presence of ethnic minorities. These groups and the interfaces between them require effective management in order to meet the social imperatives of sustainable design and construction. A survey of 1155 workers and 204 managers on Sydney construction sites respectively, found a significant level of normalisation of negative forms of cross cultural interaction. Yet it was also found that anti-racism programs are not currently a management priority and that they generally lack sophisticated community relations aspects. This paper presents the results of a desk-top study of leading global companies within and outside the construction sector which have won international awards and recognition for their cultural diversity strategies. A key insight is that the companies profiled see diversity as a key resource and as an opportunity rather than a risk which is best harnessed through long-term and on-going commitment of senior management. These leading companies also recognise that cultural diversity strategies operate at three levels - in terms of its relationship with its own workforce; its relationship with its clients and; its relationships with the communities in which it operates - and if properly managed it can be a source of competitive advantage.
Resumo:
Project selection is a decision-making process that is not merely influenced by technical aspects but also by the people who involved in the process. Organisational culture is described as a set of values and norms that are shared by people within the organisation that affects the way they interact with each other and with stakeholders from outside the organisation. The aim of this paper is to emphasize the importance of organisational culture on improving the quality of decisions in the project selection process, in addition to the influence of technical aspects of a project. The discussion is based on an extensive literature review and, as such, represents the first part of a research agenda investigating the impact of organisational culture on the project selection process applicable specifically to road infrastructure contracts. Four existing models of organisational culture (Denison 1990; Cameron and Quinn 2006; Hofstede 2001; Glaser et al 1987) are discussed and reviewed in view of their use in the larger research project to investigate the impact of culture on identified critical elements of decision-making. An understating of the way organisational culture impacts on project selection will increase the likelihood in future of relevant government departments selecting projects that achieve their stated organisational goals.
Resumo:
Project-based learning (PBL) is widely used in engineering courses. The closer to real-life the project, the greater the relevance and depth of learning experienced by students. Formula Society of Automotive Engineering (FSAE) is a fine example of a team-based project modelled on real-life problems whereby each student team designs and builds a small race car for competitive evaluation. Queensland University of Technology (QUT) has participated in FSAE-Australia since 2004. Based on the success of the project, QUT has gone the additional step of introducing a motor-racing specialization (second major) to complement its mechanical engineering degree. In this paper, the benefits of teaching motor-racing engineering through real-life projects are presented together with a discussion of the challenges faced and how they have been addressed. In order to validate the authors' observations on the teaching approaches used, student feedback was solicited through QUT's online learning experience survey (LEX), as well as a customized paper-based survey. The results of the surveys are analysed and discussed in this paper.
Resumo:
Sustainability concerns every citizen. Housing affordability and sustainable solutions are being highlighted in research and practice in many parts of the world. This paper discusses the development of a Commuter Energy and Building Utilities System (CEBUS) in sustainable housing projects as a means of bridging the gap between current median house pricing and target affordable house pricing for low income earners. Similar scales of sustainable housing development cannot be achieved through independent application of current best practice methods in ecologically sustainable development strategies or transit oriented development master plans. This paper presents the initial stage of research on first capital and ongoing utilities and transport cost savings available from these sustainable design methods. It also outlines further research and development of a CEBUS Dynamic Simulation Model and Conceptual Framework for the Australian property development and construction industry.
Resumo:
In response to the need to leverage private finance and the lack of competition in some parts of the Australian public sector major infrastructure market, especially in very large economic infrastructure procured using Pubic Private Partnerships, the Australian Federal government has demonstrated its desire to attract new sources of in-bound foreign direct investment (FDI) into the Australian construction market. This paper aims to report on progress towards an investigation into the determinants of multinational contractors’ willingness to bid for Australian public sector major infrastructure projects and which is designed to give an improved understanding of matters surrounding FDI into the Australian construction sector. This research deploys Dunning’s eclectic theory for the first time in terms of in-bound FDI by multinational contractors and as head contractors bidding for Australian major infrastructure public sector projects. Elsewhere, the authors have developed Dunning’s principal hypothesis associated with his eclectic framework in order to suit the context of this research and to address a weakness arising in Dunning’s principal hypothesis that is based on a nominal approach to the factors in the eclectic framework and which fail to speak to the relative explanatory power of these factors. In this paper, an approach to reviewing and analysing secondary data, as part of the first stage investigation in this research, is developed and some illustrations given, vis-à-vis the selected sector (roads, bridges and tunnels) in Australia (as the host location) and using one of the selected home countries (Spain). In conclusion, some tentative thoughts are offered in anticipation of the completion of the first stage investigation - in terms of the extent to which this first stage based on secondary data only might suggest the relative importance of the factors in the eclectic framework. It is noted that more robust conclusions are expected following the future planned stages of the research and these stages including primary data are briefly outlined. Finally, and beyond theoretical contributions expected from the overall approach taken to developing and testing Dunning’s framework, other expected contributions concerning research method and practical implications are mentioned.
Resumo:
The uncertain and dynamic nature of International Construction Joint Venture (ICJV) performance is evolved with many critical factors which lead to make partner relationships more complex in respect of making decisions to maintain a cohesive environment. Addressing to the fact, a generic system dynamics performance model for ICJV is developed by integrating a number variables as to get an overall impact on performance of ICJV and to make effective decisions based on that. In order to formulate and validate the model both structurally and behaviourally, both qualitative and quantitative data are gathered by conducting intensive interviews from two ICJVs in Thailand. After conducting intensive simulations of model, three major problems are identified related to negative value gap, low productivity in construction and high rate of ineffective information sharing of both ICJVs. Several policies are suggested and integrated application of these policies provides a maximum improvement to performance of the ICJV.
Resumo:
This paper describes the vulnerability of masonry under shear; first the mechanisms of in-plane and out-of-plane shear performance of masonry are reviewed; both the unreinforced and lightly reinforced masonry wall systems are considered. Factors affecting the response of unreinforced and reinforced masonry to shear are described and the effect of the variability of those factors to the failure mode of masonry shear walls is also discussed. Some critique is provided on the existing design provisions in various masonry standards.
Resumo:
In Australia, it has been increasingly accepted that sustainability needs to be at the top of the agenda when contemplating infrastructure development. In practice however, many companies struggle to find effective ways to embrace sustainable ideas and implement them in real projects beyond minimum compliance. One of the reasons is the lack of underpinning knowledge and evidence to demonstrate and measure the linkage between sustainability implementations and the relevant outcomes. This is compounded by the fact that very often there are no common understandings between the stakeholders on sustainability and there is a big divide between research advancement and real-life applications. Therefore it is both feasible and timely to develop and expand the body of sustainability knowledge on infrastructure development and investigate better ways of communicating with and managing it within the infrastructure sector. Although knowledge management (KM) is a relatively new and emerging discipline, it has shown its value and promise in existing applications in the construction industry. Considering the existing KM mechanisms and tools employed in practice, this research is aimed at establishing a specific KM approach to facilitate sustainability knowledge identification, acquisition, sharing, maintenance and application within the infrastructure sector, and promote integrated decision-making for sustainable infrastructure development. A triangulation of questionnaire survey, semi-structured interviews and case studies was employed in this research to collect required qualitative and quantitative data. The research studied the unique characteristics of the infrastructure sector, the nature of sustainability knowledge, and evaluated and validated the critical elements, key processes, and priority issues of KM for the Australian infrastructure sector. A holistic KM framework was developed to set the overall context for managing sustainability knowledge in the infrastructure sector by outlining (1) the main aims and outcomes of managing sustainability knowledge, (2) the key knowledge activities, (3) effective KM strategies and instruments, and (4) KM enablers. Because of the highly project-oriented nature of the infrastructure sector, knowledge can only add value when it is being used in real projects. Implementation guidelines were developed to help the industry practitioners and project teams to apply sustainability knowledge and implement KM in infrastructure project scenarios. This research provides the Australian infrastructure sector with tools to better understand KM, helps the industry practitioners to prioritize attention on relevant sustainability issues, and recommends effective practices to manage sustainability knowledge, especially in real life implementation of infrastructure projects.
Resumo:
This paper discusses the level of effectiveness of quality principles and quality management system implementation and the relationship with performance of ISO9000 certified Indonesian contractors. It also discusses the statistical relationship between quality management systems (QMSs) and key performance indicators (KPIs) amongst a large sample of Indonesian construction companies. Data collected is from questionnaire surveys involving Quality Managers, Managers, and Project and Site Engineers representing 77 different companies. Results indicate that even though some contractors have not yet effectively implemented an effective QMS, most of the KPIs of respondent companies are still at the level of high performance. The statistical results show that the relationship between variables of ISO9000 QMS principles and contractors’ KPIs is significant. These results suggest that an increment in the implementation level of QMS principles can increase KPIs, however that much effort is still required for Indonesian contractors to fully effectively implement QMS principles and thus substantially improve performance against KPIs.
Resumo:
campaign to oppose projects proposed in their local community. The social constructionist perspective advocates that these motivations are driven by activists’ interpretation of reality, such that activists will assign multiple meanings to and frame environmental issues in a way that reflects their view of reality. Past research suggest that these are also influenced by patterns of shared meaning and interpretation that develop over time in protest movements that shape activists’ perceptions of the environmental risks and impacts associated with construction activity. This paper explores the role of gender distinctions in shaping perceptions of environmental risk and how this affects their framing of the environmental, social, cultural/ historical impacts associated with a construction project. Using Snow and Benford’s (1988) 3-prong analytical tool for framing: diagnostic framing, prognostic framing and motivational framing, this paper presents findings from the content analysis of in-depth interviews of 24 activists protesting against a highly controversial housing project in the greater Sydney metropolitan area. The research adopts a single case study approach, and is particularly significant as it investigates an extensive and on-going community-based protest campaign (dating back almost 20 years) that has generated the longest standing 24-hour community picket in Australia.
Resumo:
Value Management (VM) initially started in early 1940s in the US manufacturing industry has increasingly becoming popular within the construction industry community internationally. It has been widely accepted as an important tool in the management of projects. The structured, systematic and multi-disciplinary approach in decision making process is a niche for VM in delivering better value for money project to the client investment. It would appear to be gaining some momentum as an essential management tool in the Malaysian construction sector especially in the quantity surveying practice. Quantity surveyors increasing involvement in VM provides an opportunity for the profession to re-model some of its traditional services in a more positive light and develop leading-edge skills and promote the profession. International practice has associated VM to be part of services offered in the quantity surveying practice; especially in UK has proven to be a natural progression of QS profession. The introduction of VM as early 1980’s in Malaysia combined with increasing demand for construction project to facilitate nation progress is shedding a positive light for quantity surveying profession to take lead in developing VM as one of their niche area. Therefore, the quantity surveying profession having the opportunity to take lead of this service which reflect their traditional attributes for providing the best value-for-money advise to the client. This paper shall discuss on the development of VM in Malaysia and the challenges VM face services in QS firm to remain ahead of their competitors.
Resumo:
Emerging from the challenge to reduce energy consumption in buildings is a need for research and development into the more effective use of simulation as a decision-support tool. Despite significant research, persistent limitations in process and software inhibit the integration of energy simulation in early architectural design. This paper presents a green star case study to highlight the obstacles commonly encountered with current integration strategies. It then examines simulation-based design in the aerospace industry, which has overcome similar limitations. Finally, it proposes a design system based on this contrasting approach, coupling parametric modelling and energy simulation software for rapid and iterative performance assessment of early design options.
Resumo:
In recent years, the problems resulting from unsustainable subdivision development have become significant problems in the Bangkok Metropolitan Region (BMR), Thailand. Numbers of government departments and agencies have tried to eliminate the problems by introducing the rating tools to encourage the higher sustainability levels of subdivision development in BMR, such as the Environmental Impact Assessment Monitoring Award (EIA-MA) and the Thai’s Rating for Energy and Environmental Sustainability of New construction and major renovation (TREES-NC). However, the EIA-MA has included the neighbourhood designs in the assessment criteria, but this requirement applies to large projects only. Meanwhile, TREES-NC has focused only on large scale buildings such as condominiums, office buildings, and is not specific for subdivision neighbourhood designs. Recently, the new rating tool named “Rating for Subdivision Neighbourhood Sustainability Design (RSNSD)” has been developed. Therefore, the validation process of RSNSD is still required. This paper aims to validate the new rating tool for subdivision neighbourhood design in BMR. The RSNSD has been validated by applying the rating tool to eight case study subdivisions. The result of RSNSD by data generated through surveying subdivisions will be compared to the existing results from the EIA-MA. The selected cases include of one “Excellent Award”, two “Very Good Award”, and five non-rated subdivision developments. This paper expects to prove the credibility of RSNSD before introducing to the real subdivision development practises. The RSNSD could be useful to encourage higher sustainability subdivision design level, and then protect the problems from further subdivision development in BMR.