631 resultados para Composite Building
Resumo:
This project examined the role that written specifications play in the building procurement process and the relationship that specifications should have with respect to the use of BIM within the construction industry. A three-part approach was developed to integrate specifications, product libraries and BIM. Typically handled by different disciplines within project teams, these provide the basis for a holistic approach to the development of building descriptions through the design process and into construction.
Resumo:
This study proposes an optimized approach of designing in which a model specially shaped composite tank for spacecrafts is built by applying finite element analysis. The composite layers are preliminarily designed by combining quasi-network design method with numerical simulation, which determines the ratio between the angle and the thickness of layers as the initial value of the optimized design. By adopting an adaptive simulated annealing algorithm, the angles and the numbers of layers at each angle are optimized to minimize the weight of structure. Based on this, the stacking sequence of composite layers is formulated according to the number of layers in the optimized structure by applying the enumeration method and combining the general design parameters. Numerical simulation is finally adopted to calculate the buckling limit of tanks in different designing methods. This study takes a composite tank with a cone-shaped cylinder body as example, in which ellipsoid head section and outer wall plate are selected as the object to validate this method. The result shows that the quasi-network design method can improve the design quality of composite material layer in tanks with complex preliminarily loading conditions. The adaptive simulated annealing algorithm can reduce the initial design weight by 30%, which effectively probes the global optimal solution and optimizes the weight of structure. It can be therefore proved that, this optimization method is capable of designing and optimizing specially shaped composite tanks with complex loading conditions.
Resumo:
Public buildings and large infrastructure are typically monitored by tens or hundreds of cameras, all capturing different physical spaces and observing different types of interactions and behaviours. However to date, in large part due to limited data availability, crowd monitoring and operational surveillance research has focused on single camera scenarios which are not representative of real-world applications. In this paper we present a new, publicly available database for large scale crowd surveillance. Footage from 12 cameras for a full work day covering the main floor of a busy university campus building, including an internal and external foyer, elevator foyers, and the main external approach are provided; alongside annotation for crowd counting (single or multi-camera) and pedestrian flow analysis for 10 and 6 sites respectively. We describe how this large dataset can be used to perform distributed monitoring of building utilisation, and demonstrate the potential of this dataset to understand and learn the relationship between different areas of a building.
Resumo:
‘Complexity’ is a term that is increasingly prevalent in conversations about building capacity for 21st Century professional engineers. Society is grappling with the urgent and challenging reality of accommodating seven billion people, meeting needs and innovating lifestyle improvements in ways that do not destroy atmospheric, biological and oceanic systems critical to life. Over the last two decades in particular, engineering educators have been active in attempting to build capacity amongst professionals to deliver ‘sustainable development’ in this rapidly changing global context. However curriculum literature clearly points to a lack of significant progress, with efforts best described as ad hoc and highly varied. Given the limited timeframes for action to curb environmental degradation proposed by scientists and intergovernmental agencies, the authors of this paper propose it is imperative that curriculum renewal towards education for sustainable development proceeds rapidly, systemically, and in a transformational manner. Within this context, the paper discusses the need to consider a multiple track approach to building capacity for 21st Century engineering, including priorities and timeframes for undergraduate and postgraduate curriculum renewal. The paper begins with a contextual discussion of the term complexity and how it relates to life in the 21st Century. The authors then present a whole of system approach for planning and implementing rapid curriculum renewal that addresses the critical roles of several generations of engineering professionals over the next three decades. The paper concludes with observations regarding engaging with this approach in the context of emerging accreditation requirements and existing curriculum renewal frameworks.
Resumo:
Although road construction and use provides significant economic and social benefits its environmental impact is of growing concern. Roads are one of the greatest greenhouse gas contributors both directly through fossil energy consumed in mining, transporting, earthworks, and paving work, along with in-direct emissions from road use by vehicles. This discussion paper will outline opportunities within the Australian context for reducing environmental pressure in road building and consider the future environmental impacts of road projects.
Resumo:
Before tissue plasminogen activator (tPA) was licensed for use in Canada, in February 1999, the Calgary Regional Stroke Program spearheaded the development and organization of local resources to use thrombolytic therapy in patients who had experienced acute ischemic stroke. In 1996 special permission was obtained from the Calgary Regional Health Authority to use intravenously administered tPA for acute ischemic stroke, and ethical and scientific review boards approved the protocols. After 3 years our efforts have resulted in improved patient outcomes, shorter times from symptom onset to treatment and acceptable adverse event rates. Areas for continued improvement include the door-to-needle time and broader education of the public about the symptoms of acute ischemic stroke.
Resumo:
The purpose of this study is to examine the current level of stakeholder involvement during the project's planning process. Stakeholders often provide the needed resources and have the ability to control the interaction and resource flows in the network. They also ultimately have strong impact on an organisation's survival, and therefore appropriate management and involvement of key stakeholders should be an important part of any project management plan. A series of literature reviews was conducted to identify and categorise significant phases involved in the planning. For data collection, a questionnaire survey was designed and distributed amongst nearly 200 companies who were involved in the residential building sector in Australia. Results of the analysis demonstrate the engagement levels of the four stakeholder groups involved in the planning process and establish a basis for further stakeholder involvement improvement.
Resumo:
While numerous full scale experimental programs have been conducted around the world over the past 50 years to investigate the behaviour of steel portal frame buildings, none have comprehensively investigated the behaviour of such buildings under wind uplift. Wind uplift loads often govern designs in the Australian environment and this became the subject of a recent research project at Queensland University of Technology (OUT). This paper describes the full scale experiments on a steel portal frame building subject to wind uplift, racking and gravity loads. The portal rafter and column members utilised hollow flange beam (HFB) sections [5-8] though the paper's findings on the theoretical and experimental building responses relate to conventional types of steel portal frame buildings.
Resumo:
The co-curing process for advanced grid-stiffened (AGS) composite structure is a promising manufacturing process, which could reduce the manufacturing cost, augment the advantages and improve the performance of AGS composite structure. An improved method named soft-mold aided co-curing process which replaces the expansion molds by a whole rubber mold is adopted in this paper. This co-curing process is capable to co-cure a typical AGS composite structure with the manufacturer’s recommended cure cycle (MRCC). Numerical models are developed to evaluate the variation of temperature and the degree of cure in AGS composite structure during the soft-mold aided co-curing process. The simulation results were validated by experimental results obtained from embedded temperature sensors. Based on the validated modeling framework, the cycle of cure can be optimized by reducing more than half the time of MRCC while obtaining a reliable degree of cure. The shape and size effects of AGS composite structure on the distribution of temperature and degree of cure are also investigated to provide insights for the optimization of soft-mold aided co-curing process.
Resumo:
How can obstacles to innovation be overcome in road construction? Using a focus group methodology, and based on two prior rounds of empirical work, the analysis in this chapter generates a set of four key solutions to two main construction innovation obstacles: (1) restrictive tender assessment and (2) disagreement over who carries the risk of new product failure. The four key solutions uncovered were: 1) pre-project product certification; 2) past innovation performance assessment; 3) earlier involvement of product suppliers and road asset operators; and 4) performance-based specifications. Additional research is suggested in order to illicit deeper insights into possible solutions to construction innovation obstacles, and should emphasise furthering the theoretical interpretation of empirical phenomena.
Resumo:
In this work, we have developed a new efficient hole transport material (HTM) composite based on poly(3- hexylthiophene) (P3HT) and bamboo-structured carbon nanotubes (BCNs) for CH3NH3PbI3 (MAPbI3) based perovskite solar cells. Compared to pristine P3HT, it is found that the crystallinity of P3HT was significantly improved by addition of BCNs, which led to over one order of magnitude higher conductivity for the composite containing 1–2 wt% BCNs in P3HT. In the meantime, the interfacial charge transfer between the MAPbI3 light absorbing layer and the HTM composite layer based on P3HT/BCNs was two-fold faster than pristine P3HT. More importantly, the HTM film with a superior morphological structure consisting of closely compact large grains was achieved with the composite containing 1 wt% BCNs in P3HT. The study by electrochemical impedance spectroscopy has confirmed that the electron recombination in the solar cells was reduced nearly ten-fold with the addition of 1 wt% carbon nanotubes in the HTM composite. Owing to the superior HTM film morphology and the significantly reduced charge recombination, the energy conversion efficiency of the perovskite solar cells increased from 3.6% for pristine P3HT to 8.3% for P3HT/(1 wt% BCNs) with a significantly enhanced open circuit voltage (Voc) and fill factor (FF). The findings of this work are important for development of new HTM for high performance perovskite solar cells.
Resumo:
Tight networks of interwoven carbon nanotube bundles are formed in our highly conductive composite. The composite possesses propertiessuggesting a two-dimensional percolative network rather than other reported dispersions displaying three-dimensional networks. Binding nanotubes into large but tight bundles dramatically alters the morphology and electronic transport dynamics of the composite. This enables itto carry higher levels of charge in the macroscale leading to conductivities as high as 1600 S/cm. We now discuss in further detail, the electronic and physical properties of the nanotube composites through Raman spectroscopy and transmission electron microscopy analysis. When controlled and usedappropriately, the interesting properties of these composites reveal their potential for practical device applications. For instance, we used this composite to fabricate coatings, whic improve the properties of an electromagnetic antenna/amplifier transducer. The resulting transducer possesses a broadband range up to GHz frequencies. A strain gauge transducer was also fabricated using changes in conductivity to monitor structural deformations in the composite coatings.
Resumo:
This thesis investigates the operations of non-government organisations (NGOs) engaging in microenterprise development programs in Bangladesh and Indonesia, to understand the nature and mechanisms of NGO accountability to the poor. Findings reveal both barriers and mechanisms contributing to success within these programs. A range of mechanisms enhance both accountability of NGOs and the poor, facilitating more effective programs and sustainable poverty alleviation.
Resumo:
The purpose of this study was to determine if using team building activities within a university Latin dance course enhances cohesion. Students (N=30) completed the Group Environment Questionnaire (GEQ; Carron, Widmeyer, & Brawley, 1985), which measures group integration (individuals’ perceptions of the closeness, similarity, and bonding within the group as a whole) and individual attractions to the group in terms of both task and social cohesion. Students also completed an evaluation of the team building activities and wrote reflective essays about their experiences in the course. The course consisted of twenty 90-minute classes. In the third class students were provided an information sheet describing the research. In the fourth class the students completed a demographics questionnaire and the GEQ. The students completed the GEQ again during the ninth class. In classes 10 to 14 team building activities took up roughly the first third of each class. The students completed the GEQ again in classes 15 and 20. In class 16 the students completed the evaluation. The reflective essays were submitted two weeks after the last class. There were no significant differences across time in social cohesion. Group integration task, however, was significantly higher at times 3 and 4 compared to time 1. Students agreed that the team-building activities helped to bond class members, and felt it was valuable for these activities to be included in the unit in the future. The reflective essays indicated the students felt the team building activities improved social factors, and interpersonal, dance, and personal mental skills.
Resumo:
As one of the largest sources of greenhouse gas (GHG) emissions, the building and construction sector is facing increasing pressure to reduce its life cycle GHG emissions. One central issue in striving towards reduced carbon emissions in the building and construction sector is to develop a practical and meaningful yardstick to assess and communicate GHG results through carbon labelling. The idea of carbon labelling schemes for building materials is to trigger a transition to a low carbon future by switching consumer-purchasing habits to low-carbon alternatives. As such, failing to change purchasing pattern and behaviour can be disastrous to carbon labelling schemes. One useful tool to assist customers to change their purchasing behaviour is benchmarking, which has been very commonly used in ecolabelling schemes. This paper analyses the definition and scope of benchmarking in the carbon labelling schemes for building materials. The benchmarking process has been examined within the context of carbon labelling. Four practical issues for the successful implementation of benchmarking, including the availability of benchmarks and databases, the usefulness of different types of benchmarks and the selection of labelling practices have also been clarified.