556 resultados para grassroots project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Innovation enables organisations to endure by responding to emergence and to improve efficiency. Innovation in a complex organisation can be difficult due to complexities contributing to slow decision-making. Complex projects fail due to an inability to respond to emergence which consumes finances and impacts on resources and organisational success. Therefore, for complex organisations to improve on performance and resilience, it would be advantageous to understand how to improve the management of innovation and thus, the ability to respond to emergence. The benefits to managers are an increase in the number of successful projects and improved productivity. This study will explore innovation management in a complex project based organisation. The contribution to the academic literature will be an in-depth, qualitative exploration of innovation in a complex project based organisation using a comparative case study approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background In 2000, the Mater Child and Youth Mental Health Service Indigenous consultant saw that Indigenous families were isolated from kinship networks following the assimilation policy and clinicians were largely unaware of these socio-cultural histories. Experiences of marginalisation by mainstream society and services were exacerbated by assumptions clinicians made about this population. To enhance Mater’s care the consultant undertook research with Indigenous Elders. The project, “Bringing up Children Gran’s Way”, on which the presenter is the research advisor, was funded by AIATSIS. Aims Increase service quality Improve staff confidence, skills and satisfaction working with this population Promote the wellbeing of Indigenous families Acknowledge the significance of Elders and extended family networks. Methods Over 2006/07 the team used narrative and Indigenous methodologies, (e.g. yarning circles and the use of Indigenous research staff) to arrange and audio-record structured interviews with 19 Aboriginal Elders, on growing up and parenting. The participants were recruited by the Indigenous consultant and gave written consent, following ethical approval and information giving. The team immersed themselves in the material by repeated reading of the transcripts to note recurring themes in Elders’ narratives. Findings The recurring themes included the importance of cultural protocols and extended family; impacts of being ‘under the Act and stories of surviving change; culture, spiritualty and religion; trans-generational impacts; childrearing and the need to reconcile with Elders. Discussion The narratives show Elders resilience in the face of enduring impact of policies of genocide and assimilation. Clinicians need to approach their work with a deeper understanding of the diversity of clients’ social experience and cultural identity. Clinicians need to examine their own cultural assumptions about this population. Conclusion The dissemination of the knowledge and experience of Elders is a matter of social justice and crucial for the well-being of future generations and for improved service access.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project evaluation is a process of measuring costs, benefits, risks and uncertainties for the purpose of decision-making by estimating and assessing impacts of the project to the community. The effects of impacts of toll roads are similar but different from the general non-tolled roads. Project evaluation methodologies are extensively studied and applied to various transport infrastructure projects. However, there is no definitive methodology to evaluate toll roads. This review discusses the impacts of toll roads then reviews the limitations of existing project evaluation methodologies when evaluating toll road impacts. The review identified gaps of knowledge of toll evaluations. First, the treatment of toll in project evaluation, particularly in Cost-Benefit Analysis requires further study to explore the appropriate methodology. Secondly, the project evaluation methodology needs to place strong emphasis on empirically based risk and uncertainty assessment. Addressing the limitations of the existing project evaluation methodologies leads to improvements of the methodology in practical level as well as fills the gap of knowledge of project evaluation for toll roads with respect to net impacts to the community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project evaluation is a process of measuring costs, benefits, risks and uncertainties for the purpose of decision-making by estimating and assessing impacts of the project to the community. The effects of impacts of toll roads are similar but different from the general non-tolled roads. Project evaluation methodologies are extensively studied and applied to various transport infrastructure projects. However, there is no definitive methodology to evaluate toll roads. This review discusses the impacts of toll roads then reviews the limitations of existing project evaluation methodologies when evaluating toll road impacts. The review identified gaps of knowledge of toll evaluations. First, the treatment of toll in project evaluation, particularly in Cost-Benefit Analysis requires further study to explore the appropriate methodology. Secondly, the project evaluation methodology needs to place strong emphasis on empirically based risk and uncertainty assessment. Addressing the limitations of the existing project evaluation methodologies leads to improvements of the methodology in practical level as well as fills the gap of knowledge of project evaluation for toll roads with respect to net impacts to the community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As business environments become even more competitive, project teams are required to make an effort to operate external linkages from within an organization or across organizational boundaries. Nevertheless, some members boundary-span less extensively, isolating themselves and their project teams from external environments. Our study examines why some members boundary-span more or less through the framework of group attachment theory. Data from 521 project-team members in construction and engineering industries revealed that the more individuals worry about their project team’s acceptance (group attachment anxiety), the more likely they are to perceive intergroup competition, and thus put more efforts into operating external linkages and resources to help their own teams outperform competitors. In contrast, a tendency to distrust their project teams (group attachment avoidance) generates members’ negative construal of their team’s external image, and thus fewer efforts are made at operating external linkages. Thus, project leaders and members with high group-attachment-anxiety may be best qualified for external tasks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The National Energy Efficient Building Project (NEEBP) Phase One report, published in December 2014, investigated “process issues and systemic failures” in the administration of the energy performance requirements in the National Construction Code. It found that most stakeholders believed that under-compliance with these requirements is widespread across Australia, with similar issues being reported in all states and territories. The report found that many different factors were contributing to this outcome and, as a result, many recommendations were offered that together would be expected to remedy the systemic issues reported. To follow up on this Phase 1 report, three additional projects were commissioned as part of Phase 2 of the overall NEEBP project. This Report deals with the development and piloting of an Electronic Building Passport (EBP) tool – a project undertaken jointly by pitt&sherry and a team at the Queensland University of Technology (QUT) led by Dr Wendy Miller. The other Phase 2 projects cover audits of Class 1 buildings and issues relating to building alterations and additions. The passport concept aims to provide all stakeholders with (controlled) access to the key documentation and information that they need to verify the energy performance of buildings. This trial project deals with residential buildings but in principle could apply to any building type. Nine councils were recruited to help develop and test a pilot electronic building passport tool. The participation of these councils – across all states – enabled an assessment of the extent to which these councils are currently utilising documentation; to track the compliance of residential buildings with the energy performance requirements in the National Construction Code (NCC). Overall we found that none of the participating councils are currently compiling all of the energy performance-related documentation that would demonstrate code compliance. The key reasons for this include: a major lack of clarity on precisely what documentation should be collected; cost and budget pressures; low public/stakeholder demand for the documentation; and a pragmatic judgement that non-compliance with any regulated documentation requirements represents a relatively low risk for them. Some councils reported producing documentation, such as certificates of final completion, only on demand, for example. Only three of the nine council participants reported regularly conducting compliance assessments or audits utilising this documentation and/or inspections. Overall we formed the view that documentation and information tracking processes operating within the building standards and compliance system are not working to assure compliance with the Code’s energy performance requirements. In other words the Code, and its implementation under state and territory regulatory processes, is falling short as a ‘quality assurance’ system for consumers. As a result it is likely that the new housing stock is under-performing relative to policy expectations, consuming unnecessary amounts of energy, imposing unnecessarily high energy bills on occupants, and generating unnecessary greenhouse gas emissions. At the same time, Councils noted that the demand for documentation relating to building energy performance was low. All the participant councils in the EBP pilot agreed that documentation and information processes need to work more effectively if the potential regulatory and market drivers towards energy efficient homes are to be harnessed. These findings are fully consistent with the Phase 1 NEEBP report. It was also agreed that an EBP system could potentially play an important role in improving documentation and information processes. However, only one of the participant councils indicated that they might adopt such a system on a voluntary basis. The majority felt that such a system would only be taken up if it were: - A nationally agreed system, imposed as a mandatory requirement under state or national regulation; - Capable of being used by multiple parties including councils, private certifiers, building regulators, builders and energy assessors in particular; and - Fully integrated into their existing document management systems, or at least seamlessly compatible rather than a separate, unlinked tool. Further, we note that the value of an EBP in capturing statistical information relating to the energy performance of buildings would be much greater if an EBP were adopted on a nationally consistent basis. Councils were clear that a key impediment to the take up of an EBP system is that they are facing very considerable budget and staffing challenges. They report that they are often unable to meet all community demands from the resources available to them. Therefore they are unlikely to provide resources to support the roll out of an EBP system on a voluntary basis. Overall, we conclude from this pilot that the public good would be well served if the Australian, state and territory governments continued to develop and implement an Electronic Building Passport system in a cost-efficient and effective manner. This development should occur with detailed input from building regulators, the Australian Building Codes Board (ABCB), councils and private certifiers in the first instance. This report provides a suite of recommendations (Section 7.2) designed to advance the development and guide the implementation of a national EBP system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public rental housing (PRH) projects are the mainstream of China's new affordable housing policies, and their integrated sustainability has a far-reaching effect on medium-low income families' well-being and social stability. However, there are few quantitative researches on the integrated sustainability of PRH projects. Our study tries to fill this gap through proposing an assessment model of the integrated sustainability for PRH projects. First, this paper defines what the sustainability of a PRH project is. Second, after constructing the sustainable system of a PRH project from the perspective of complex eco-system, the paper explores the internal operation mechanism and the coupling mechanism among the ecological, economic and social subsystems. Third, it identifies fourteen indices to represent the sustainability system of a PRH project, including six indices of ecological subsystem, five of economic subsystem and three of social subsystem. Fourth, it qualifies the weights of three subsystems and their internal representative indices. In addition, an assessment model is established through expert surveys and analytic network process (ANP). Finally, the paper carries out an empirical research on a PRH project in Nanjing city of China, followed by suggestions to enhance the integrated sustainability. The sustainability system and its evaluation model proposed in this paper are concise and easy to understand and can provide a theoretical foundation and a scientific basis for the evaluation and optimization of PRH projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background Project archives are becoming increasingly large and complex. On construction projects in particular, the increasing amount of information and the increasing complexity of its structure make searching and exploring information in the project archive challenging and time-consuming. Methods This research investigates a query-driven approach that represents new forms of contextual information to help users understand the set of documents resulting from queries of construction project archives. Specifically, this research extends query-driven interface research by representing three types of contextual information: (1) the temporal context is represented in the form of a timeline to show when each document was created; (2) the search-relevance context shows exactly which of the entered keywords matched each document; and (3) the usage context shows which project participants have accessed or modified a file. Results We implemented and tested these ideas within a prototype query-driven interface we call VisArchive. VisArchive employs a combination of multi-scale and multi-dimensional timelines, color-coded stacked bar charts, additional supporting visual cues and filters to support searching and exploring historical project archives. The timeline-based interface integrates three interactive timelines as focus + context visualizations. Conclusions The feasibility of using these visual design principles is tested in two types of project archives: searching construction project archives of an educational building project and tracking of software defects in the Mozilla Thunderbird project. These case studies demonstrate the applicability, usefulness and generality of the design principles implemented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As technology continues to become more accessible, miniaturised and diffused into the environment, the potential of wearable technology to impact our lives in significant ways becomes increasingly viable. Wearables afford unique interaction, communication and functional capabilities between users, their environment as well as access to information and digital data. Wearables also demand an inter-disciplinary approach and, depending on the purpose, can be fashioned to transcend cultural, national and spatial boundaries. This paper presents the Cloud Workshop project based on the theme of ‘Wearables and Wellbeing; Enriching connections between citizens in the Asia-Pacific region’, initiated through a cooperative partnership between Queensland University of Technology (QUT), Hong Kong Baptist University (HKBU) and Griffith University (GU). The project was unique due to its inter-disciplinary, inter-cultural and inter-national scope that occurred simultaneously between Australia and Hong Kong.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Sport Development Project (SDP) was a comprehensive youth strategy for sport in the Northern Territory aimed at diversion from ‘at-risk’ behaviours, improvement of life choices and outcomes, and strengthening youth service infrastructure through engagement in positive (sport) activities. There were five Remote Service Delivery sites that were involved in the trial of this ‘best practice’ model for delivering sport-focused diversion activities. These include: Gapuwiyak, Wadeye, Yuendumu, Gunbalunya and Nguiu.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objectives This efficacy study assessed the added impact real time computer prompts had on a participatory approach to reduce occupational sedentary exposure and increase physical activity. Design Quasi-experimental. Methods 57 Australian office workers (mean [SD]; age = 47 [11] years; BMI = 28 [5] kg/m2; 46 men) generated a menu of 20 occupational ‘sit less and move more’ strategies through participatory workshops, and were then tasked with implementing strategies for five months (July–November 2014). During implementation, a sub-sample of workers (n = 24) used a chair sensor/software package (Sitting Pad) that gave real time prompts to interrupt desk sitting. Baseline and intervention sedentary behaviour and physical activity (GENEActiv accelerometer; mean work time percentages), and minutes spent sitting at desks (Sitting Pad; mean total time and longest bout) were compared between non-prompt and prompt workers using a two-way ANOVA. Results Workers spent close to three quarters of their work time sedentary, mostly sitting at desks (mean [SD]; total desk sitting time = 371 [71] min/day; longest bout spent desk sitting = 104 [43] min/day). Intervention effects were four times greater in workers who used real time computer prompts (8% decrease in work time sedentary behaviour and increase in light intensity physical activity; p < 0.01). Respective mean differences between baseline and intervention total time spent sitting at desks, and the longest bout spent desk sitting, were 23 and 32 min/day lower in prompt than in non-prompt workers (p < 0.01). Conclusions In this sample of office workers, real time computer prompts facilitated the impact of a participatory approach on reductions in occupational sedentary exposure, and increases in physical activity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Localised prostate cancer is a heterogenous disease and a multi-modal approach is required to accurately diagnose and stage the disease. Whilst the use of magnetic resonance imaging (MRI) has become more common, small volume and multi-focal disease are oft en diffi cult to characterise. Prostate specifi c membrane antigen is a cell surface protein, which is expressed in nearly all prostate cancer cells. Its expression is signifi cantly higher in high grade prostate cancer cells. In this study, we compare multi-parametric magnetic resonance imaging and 68-Gallinium-PSMA PET with whole-mount pathology of the prostate to evaluate the applicability of multiparameteric (MP) MRI and 68Ga-PSMA PET in detecting and locating tumour foci in patients with localised prostate cancer.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this study, we investigate the qualitative and quantitative effects of an R&D subsidy for a clean technology and a Pigouvian tax on a dirty technology on environmental R&D when it is uncertain how long the research takes to complete. The model is formulated as an optimal stopping problem, in which the number of successes required to complete the R&D project is finite and learning about the probability of success is incorporated. We show that the optimal R&D subsidy with the consideration of learning is higher than that without it. We also find that an R&D subsidy performs better than a Pigouvian tax unless suppliers have sufficient incentives to continue cost-reduction efforts after the new technology success-fully replaces the old one. Moreover, by using a two-project model, we show that a uniform subsidy is better than a selective subsidy.