568 resultados para Engineering problems


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Depleting fossil fuel resources and increased accumulation of greenhouse gas emissions are increasingly making electrical vehicles (EV) attractive option for the transportation sector. However uncontrolled random charging and discharging of EVs may aggravate the problems of an already stressed system during the peak demand and cause voltage problems during low demand. This paper develops a demand side response scheme for properly integrating EVs in the Electrical Network. The scheme enacted upon information on electricity market conditions regularly released by the Australian Energy Market Operator (AEMO) on the internet. The scheme adopts Internet relays and solid state switches to cycle charging and discharging of EVs. Due to the pending time-of-use and real-price programs, financial benefits will represent driving incentives to consumers to implement the scheme. A wide-scale dissemination of the scheme is expected to mitigate excessive peaks on the electrical network with all associated technical, economic and social benefits.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper investigates train scheduling problems when prioritised trains and non-prioritised trains are simultaneously traversed in a single-line rail network. In this case, no-wait conditions arise because the prioritised trains such as express passenger trains should traverse continuously without any interruption. In comparison, non-prioritised trains such as freight trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available, which is thought of as a relaxation of no-wait conditions. With thorough analysis of the structural properties of the No-Wait Blocking Parallel-Machine Job-Shop-Scheduling (NWBPMJSS) problem that is originated in this research, an innovative generic constructive algorithm (called NWBPMJSS_Liu-Kozan) is proposed to construct the feasible train timetable in terms of a given order of trains. In particular, the proposed NWBPMJSS_Liu-Kozan constructive algorithm comprises several recursively-used sub-algorithms (i.e. Best-Starting-Time-Determination Procedure, Blocking-Time-Determination Procedure, Conflict-Checking Procedure, Conflict-Eliminating Procedure, Tune-up Procedure and Fine-tune Procedure) to guarantee feasibility by satisfying the blocking, no-wait, deadlock-free and conflict-free constraints. A two-stage hybrid heuristic algorithm (NWBPMJSS_Liu-Kozan-BIH) is developed by combining the NWBPMJSS_Liu-Kozan constructive algorithm and the Best-Insertion-Heuristic (BIH) algorithm to find the preferable train schedule in an efficient and economical way. Extensive computational experiments show that the proposed methodology is promising because it can be applied as a standard and fundamental toolbox for identifying, analysing, modelling and solving real-world scheduling problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In practice, parallel-machine job-shop scheduling (PMJSS) is very useful in the development of standard modelling approaches and generic solution techniques for many real-world scheduling problems. In this paper, based on the analysis of structural properties in an extended disjunctive graph model, a hybrid shifting bottleneck procedure (HSBP) algorithm combined with Tabu Search metaheuristic algorithm is developed to deal with the PMJSS problem. The original-version SBP algorithm for the job-shop scheduling (JSS) has been significantly improved to solve the PMJSS problem with four novelties: i) a topological-sequence algorithm is proposed to decompose the PMJSS problem into a set of single-machine scheduling (SMS) and/or parallel-machine scheduling (PMS) subproblems; ii) a modified Carlier algorithm based on the proposed lemmas and the proofs is developed to solve the SMS subproblem; iii) the Jackson rule is extended to solve the PMS subproblem; iv) a Tabu Search metaheuristic algorithm is embedded under the framework of SBP to optimise the JSS and PMJSS cases. The computational experiments show that the proposed HSBP is very efficient in solving the JSS and PMJSS problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research deals with an innovative methodology for optimising the coal train scheduling problem. Based on our previously published work, generic solution techniques are developed by utilising a “toolbox” of standard well-solved standard scheduling problems. According to our analysis, the coal train scheduling problem can be basically modelled a Blocking Parallel-Machine Job-Shop Scheduling (BPMJSS) problem with some minor constraints. To construct the feasible train schedules, an innovative constructive algorithm called the SLEK algorithm is proposed. To optimise the train schedule, a three-stage hybrid algorithm called the SLEK-BIH-TS algorithm is developed based on the definition of a sophisticated neighbourhood structure under the mechanism of the Best-Insertion-Heuristic (BIH) algorithm and Tabu Search (TS) metaheuristic algorithm. A case study is performed for optimising a complex real-world coal rail system in Australia. A method to calculate the lower bound of the makespan is proposed to evaluate results. The results indicate that the proposed methodology is promising to find the optimal or near-optimal feasible train timetables of a coal rail system under network and terminal capacity constraints.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, No-Wait, No-Buffer, Limited-Buffer, and Infinite-Buffer conditions for the flow-shop problem (FSP) have been investigated. These four different buffer conditions have been combined to generate a new class of scheduling problem, which is significant for modelling many real-world scheduling problems. A new heuristic algorithm is developed to solve this strongly NP-hard problem. Detailed numerical implementations have been analysed and promising results have been achieved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For the shop scheduling problems such as flow-shop, job-shop, open-shop, mixed-shop, and group-shop, most research focuses on optimizing the makespan under static conditions and does not take into consideration dynamic disturbances such as machine breakdown and new job arrivals. We regard the shop scheduling problem under static conditions as the static shop scheduling problem, while the shop scheduling problem with dynamic disturbances as the dynamic shop scheduling problem. In this paper, we analyze the characteristics of the dynamic shop scheduling problem when machine breakdown and new job arrivals occur, and present a framework to model the dynamic shop scheduling problem as a static group-shop-type scheduling problem. Using the proposed framework, we apply a metaheuristic proposed for solving the static shop scheduling problem to a number of dynamic shop scheduling benchmark problems. The results show that the metaheuristic methodology which has been successfully applied to the static shop scheduling problems can also be applied to solve the dynamic shop scheduling problem efficiently.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Three types of shop scheduling problems, the flow shop, the job shop and the open shop scheduling problems, have been widely studied in the literature. However, very few articles address the group shop scheduling problem introduced in 1997, which is a general formulation that covers the three above mentioned shop scheduling problems and the mixed shop scheduling problem. In this paper, we apply tabu search to the group shop scheduling problem and evaluate the performance of the algorithm on a set of benchmark problems. The computational results show that our tabu search algorithm is typically more efficient and faster than the other methods proposed in the literature. Furthermore, the proposed tabu search method has found some new best solutions of the benchmark instances.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, three metaheuristics are proposed for solving a class of job shop, open shop, and mixed shop scheduling problems. We evaluate the performance of the proposed algorithms by means of a set of Lawrence’s benchmark instances for the job shop problem, a set of randomly generated instances for the open shop problem, and a combined job shop and open shop test data for the mixed shop problem. The computational results show that the proposed algorithms perform extremely well on all these three types of shop scheduling problems. The results also reveal that the mixed shop problem is relatively easier to solve than the job shop problem due to the fact that the scheduling procedure becomes more flexible by the inclusion of more open shop jobs in the mixed shop.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we propose three meta-heuristic algorithms for the permutation flowshop (PFS) and the general flowshop (GFS) problems. Two different neighborhood structures are used for these two types of flowshop problem. For the PFS problem, an insertion neighborhood structure is used, while for the GFS problem, a critical-path neighborhood structure is adopted. To evaluate the performance of the proposed algorithms, two sets of problem instances are tested against the algorithms for both types of flowshop problems. The computational results show that the proposed meta-heuristic algorithms with insertion neighborhood for the PFS problem perform slightly better than the corresponding algorithms with critical-path neighborhood for the GFS problem. But in terms of computation time, the GFS algorithms are faster than the corresponding PFS algorithms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

1. Overview of hotspot identification (HSID)methods 2. Challenges with HSID 3. Bringing crash severity into the ‘mix’ 4. Case Study: Truck Involved Crashes in Arizona 5. Conclusions • Heavy duty trucks have different performance envelopes than passenger cars and have more difficulty weaving, accelerating, and braking • Passenger vehicles have extremely limited sight distance around trucks • Lane and shoulder widths affect truck crash risk more than passenger cars • Using PDOEs to model truck crashes results in a different set of locations to examine for possible engineering and behavioral problems • PDOE models point to higher societal cost locations, whereas frequency models point to higher crash frequency locations • PDOE models are less sensitive to unreported crashes • PDOE models are a great complement to existing practice

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper studies the missing covariate problem which is often encountered in survival analysis. Three covariate imputation methods are employed in the study, and the effectiveness of each method is evaluated within the hazard prediction framework. Data from a typical engineering asset is used in the case study. Covariate values in some time steps are deliberately discarded to generate an incomplete covariate set. It is found that although the mean imputation method is simpler than others for solving missing covariate problems, the results calculated by it can differ largely from the real values of the missing covariates. This study also shows that in general, results obtained from the regression method are more accurate than those of the mean imputation method but at the cost of a higher computational expensive. Gaussian Mixture Model (GMM) method is found to be the most effective method within these three in terms of both computation efficiency and predication accuracy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports on a Professional Learning Program conducted in China with 140 general technology teachers. It aimed to integrate robotics technology across and within the disciplines of science, technology, engineering and mathematics. With the help of university facilitators teachers developed General Technology lessons that seamlessly integrated with rich learning content across disciplines. Teachers engaged in seminars and workshops, which provided the opportunities for them to actively couch sound principles of learning in their daily work. They gained first-hand experience in applying an aligned system of assessments, standards and quality learning experiences geared to the needs of each student. Teachers worked collaboratively in teams to create inquiry, design and collaborative learning activities that aligned with their curriculum and which dealt with real world problems, issues and challenges. They continually discussed and reflected deeply on the activities and shared the newly developed resources online with teachers across the entire country. It is evident from the preliminary analysis of data that teachers are beginning to apply rich pedagogical practices and are becoming ‘adaptive’ in their approach when using LEGO® robotic tools to design, redesign, create and re-create learning activities for their students.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the university education arena, it is becoming apparent that traditional methods of conducting classes are not the most effective ways to achieve desired learning outcomes. The traditional class/method involves the instructor verbalizing information for passive, note-taking students who are assumed to be empty receptacles waiting to be filled with knowledge. This method is limited in its effectiveness, as the flow of information is usually only in one direction. Furthermore, “It has been demonstrated that students in many cases can recite and apply formulas in numerical problems, but the actual meaning and understanding of the concept behind the formula is not acquired (Crouch & Mazur)”. It is apparent that memorization is the main technique present in this approach. A more effective method of teaching involves increasing the students’ level of activity during, and hence their involvement in the learning process. This technique stimulates self- learning and assists in keeping these students’ levels of concentration more uniform. In this work, I am therefore interested in studying the influence of a particular TLA on students’ learning-outcomes. I want to foster high-level understanding and critical thinking skills using active learning (Silberman, 1996) techniques. The TLA in question aims to promote self-study by students and to expose them to a situation where their learning-outcomes can be tested. The motivation behind this activity is based on studies which suggest that some sensory modalities are more effective than others. Using various instruments for data collection and by means of a thorough analysis I present evidence of the effectiveness of this action research project which aims to improve my own teaching practices, with the ultimate goal of enhancing student’s learning.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As global warming entails new conditions for the built environment, the thermal behavior of existing air conditioned office buildings, which are typically designed based on current weather data, may also change. Through building computer simulations, this paper evaluates the impact of global warming on the design and performance of air-conditioned office buildings in Australia, including the increased cooling loads imposed by potential global warming and probable indoor temperature increases due to possible undersized air-conditioning system, as well as the possible change in energy use and CO2 emission of Australian office buildings. It is found that the existing office buildings would generally be able to adapt to the increasing warmth of 2030 year Low and High scenarios projections and 2070 year Low scenario projection. However, for the 2070 year High scenario, the study indicates that the existing office buildings, in all capital cities except for Hobart, will suffer from overheating problems. If the energy source is assumed to be the electricity, it is found that in comparison with current weather scenario, the increased energy uses would translate into the increase of CO2 emissions by 0 to 34.6 kg CO2 equivalent/m2, varying with different future weather scenarios and with different locations.