512 resultados para Single stage converters
Resumo:
Introduction Malorientation of the socket contributes to instability after hip arthroplasty but the optimal orientation of the cup in relation to the pelvis has not been unequivocally described. Large radiological studies are few and problems occur with film standardisation, measurement methodology used and alternative definitions of describing acetabular orientation. Methods A cohort of 1,578 patients from a single institution is studied where all patient data was collected prospectively. Risk factors for patients undergoing surgery are analysed. Radiological data was compared between a series of non-dislocating hips and dislocating cases matched 2:1 by operation type, age and diagnosis. Results The overall dislocation rate for all 1,578 cases was 3.23% but the rate varied according to the type of surgery performed. The rate in uncomplicated primary cases was 2.4% which increased to 9.3% for second stage implantation for a two stage procedure for infection. There was no significant difference in the variability of the dislocating and non-dislocating groups for either inclination (p = 0.393) or anteversion (p = 0.661). Conclusions A “safe zone” for socket orientation to avoid dislocation could not be defined. The cause of dislocation is multifactorial, re-establishing the anatomic centre of rotation, balancing soft tissues and avoidance of impingement around the hip are important considerations.
Resumo:
This paper proposes a new multi-stage mine production timetabling (MMPT) model to optimise open-pit mine production operations including drilling, blasting and excavating under real-time mining constraints. The MMPT problem is formulated as a mixed integer programming model and can be optimally solved for small-size MMPT instances by IBM ILOG-CPLEX. Due to NP-hardness, an improved shifting-bottleneck-procedure algorithm based on the extended disjunctive graph is developed to solve large-size MMPT instances in an effective and efficient way. Extensive computational experiments are presented to validate the proposed algorithm that is able to efficiently obtain the near-optimal operational timetable of mining equipment units. The advantages are indicated by sensitivity analysis under various real-life scenarios. The proposed MMPT methodology is promising to be implemented as a tool for mining industry because it is straightforwardly modelled as a standard scheduling model, efficiently solved by the heuristic algorithm, and flexibly expanded by adopting additional industrial constraints.