592 resultados para prefabrication construction
Resumo:
Agile Project Management (APM) is a human-centred method for increasing customer-perceived value in a reliable manner. It has been proven to be particularly suited to creative projects such as Information Systems (IS) development and new product development in the automotive industry (this is in contrast to ‘lean production’ which has proved so useful to automotive production waste elimination). Construction is similarly largely a creative industry and might usefully adopt APM to improve its own reliable value delivery, rather than solely following the industrial trend of lean production. This paper describes APM, comparing it with two prominent lean construction initiatives, and then assesses by phase the potential for any impact of APM in construction. In conclusion: APM would have benefits for all phases of construction, particularly in planning and design, but its adoption for actual construction would generally be disrupted because of the lack of a coherent, well trained and trusted workforce.
Resumo:
This research has developed a framework to improve the effectiveness and efficiency of stakeholder involvement during the early planning stages of residential construction projects, in order to improve many of the quality issues that occur during the construction phases of such projects. A mixed methods approach (survey, interviews and case studies) was employed to collect the required data. It is expected that with development, this framework can bring some significant benefits to future construction projects in terms of reducing rework and wastage, improving timely delivery and avoiding disputes. The research is also anticipated to produce three high impact journal articles.
Resumo:
Construction projects are a high risk business activity. When undertaking projects in an international context, it is further complicated by the risk of fluctuations in the foreign exchange rates (FOREX). Construction business performance is affected by these fluctuations. They affect progress and cause delays, which in turn create problems for subcontractors, namely cost overruns, disputes, arbitration, total abandonment and litigation. FOREX fluctuations also cause the price of raw materials to increase, leading the cost overruns. Managing FOREX risk is critical and past research have focused on the need for adequate insurance, careful planning and management, and foreign exchange futures hedging to overcome issues that have been caused by the FOREX risk. Analysis of FOREX risk in international construction business usually focused only on issues at the project level. There is currently lack of understanding of Organisational Capabilities (OC) to manage the impacts of FOREX risk, which when examined, are seen in isolation. This paper attempts to bridge the gap by discussing the impacts of FOREX fluctuations on the international construction business. The focus is on the OC perspective and the need to develop OC framework to mitigate the risk in sustaining construction business performance.
Resumo:
This study examines the process by which newly recruited nuclear engineering and technical staff came to understand, define, think, feel and behave within a distinct group that has a direct contribution to the organization's overall emphasis on a culture of reliability and system safety. In the field of organizational behavior the interactive model of social identity formation has been recently proposed to explain the process by which the internalization of shared norms and values occurs, an element critical in identity formation. Using this rich model of organizational behavior we analyzed multiple sources of data from nine new hires over a period of three years. This was done from the time they were employed to investigate the construction of social identity by new entrants entering into a complex organizational setting reflected in the context of a nuclear facility. Informed by our data analyses, we found support for the interactive model of social identity development and report the unexpected finding that a newly appointed member's age and level of experience appears to influence the manner in which they adapt, and assimilate into their surroundings. This study represents an important contribution to the safety and reliability literature as it provides a rich insight into the way newly recruited employees enact the process by which their identities are formed and hence act, particularly under conditions of duress or significant organizational disruption in complex organizational settings.
Resumo:
This thesis is an empirical study of the factors impacting on the client involvement in Saudi Arabian construction government projects. The study investigated the impact of some factors that limited the client involvement and developed a framework called "client involvement interactive" to improve the client involvement practices in Saudi Arabian construction projects through the implementation of an implementable strategy elaborated.
Resumo:
The decision of Wilson J in Calvert v Nickless Ltd [2004] QSC 449 involves significant questions of interpretation of sections 315 and 317 of the Workcover Queensland Act 1996 (Qld) relating to claims for damages for future economic loss and for gratuitous services.
Resumo:
If there is a silver lining to the adversarial, dispute-prone nature of the building and construction industry, it can be found in the concomitant rise of innovative dispute resolution mechanisms. Time, cost and relationship concerns have meant that the formal adversarial system holds little appeal for disputing parties. As these alternative forms of dispute avoidance/resolution have matured in Australia over the last 20 years, attention has turned to the key characteristics of each process and their suitability to the building and construction industry. This article considers the role of dispute review boards (DRBs) and mediation as two alternative methods for avoiding/resolving disputes in the construction industry. Criteria are established for evaluating the efficacy of these procedures and their sensitivity to the needs of construction industry disputants. The ultimate conclusion reached is that DRBs represent a powerful, yet underutilised dispute resolution tool in Australia, and possess many industry-specific advantages that more traditional forms of alternative dispute resolution (particularly mediation) do not provide.
Resumo:
In Smit v Chan [2001] QSC 493 (Supreme Court of Queensland, S1233 of 1995, Mullins J, 21.12.2001) the sixth defendant successfully obtained an order that a complex medical negligence action be tried without a jury. This was the first application to be decided under r474 of UCPR 1999, and the decision is a significant precedent for defendants in similar cases who want to avoid the unpredictability of outcome and the inflated damages awards sometimes associated with jury trials.
Resumo:
Background Early feeding practices lay the foundation for children’s eating habits and weight gain. Questionnaires are available to assess parental feeding but overlapping and inconsistent items, subscales and terminology limit conceptual clarity and between study comparisons. Our aim was to consolidate a range of existing items into a parsimonious and conceptually robust questionnaire for assessing feeding practices with very young children (<3 years). Methods Data were from 462 mothers and children (age 21–27 months) from the NOURISH trial. Items from five questionnaires and two study-specific items were submitted to a priori item selection, allocation and verification, before theoretically-derived factors were tested using Confirmatory Factor Analysis. Construct validity of the new factors was examined by correlating these with child eating behaviours and weight. Results Following expert review 10 factors were specified. Of these, 9 factors (40 items) showed acceptable model fit and internal reliability (Cronbach’s α: 0.61-0.89). Four factors reflected non-responsive feeding practices: ‘Distrust in Appetite’, ‘Reward for Behaviour’, ‘Reward for Eating’, and ‘Persuasive Feeding’. Five factors reflected structure of the meal environment and limits: ‘Structured Meal Setting’, ‘Structured Meal Timing’, ‘Family Meal Setting’, ‘Overt Restriction’ and ‘Covert Restriction’. Feeding practices generally showed the expected pattern of associations with child eating behaviours but none with weight. Conclusion The Feeding Practices and Structure Questionnaire (FPSQ) provides a new reliable and valid measure of parental feeding practices, specifically maternal responsiveness to children’s hunger/satiety signals facilitated by routine and structure in feeding. Further validation in more diverse samples is required.
Resumo:
Community-based protests against major construction and engineering projects are becoming increasingly common as concerns over issues such as corporate social accountability, climate change and corruption become more prominent in the public's mind. Public perceptions of risk associated with these projects can have a contagious effect, which mismanaged can escalate into long-term and sometimes acrimonious protest stand-offs that have negative implications for the community, firms involved and the construction industry as a whole. This paper investigates the role of core group members in sustaining community-based protest against construction and engineering projects. Using a thematic story telling approach which draws on ethnographic method and social contagion theories, it presents an in-depth analysis of a single case study - one of Australia's longest standing community protests against a construction project. It concludes that core group members play a critical role, within anarchic structures which provide a high degree of spontaneity and improvisation, in sustaining movement continuity by building collective identity, mobilising resources and a moving interface which developers find hard to communicate with.
Resumo:
Highway construction projects have direct impacts on adjacent businesses. The nature and the degree of impact depend on individual business characterization and project specific factors. The type of business is also a relevant factor in predicting the impact of transportation construction projects. This paper presents the results of research focused on developing an in-depth understanding of these relationships. The study includes project case studies of three transportation construction projects in Florida. Surveys were conducted with all adjacent businesses, which were combined with analyses of the business accommodation procedures employed by State Highway Agencies (SHAs) nationwide to provide measure the efficiency of present rules. The results include an analysis of differing priorities for different classification of businesses and development of design and construction management best practices to better accommodate businesses during highway construction. A pilot project that employed business accommodation principles devised in this research, and improvements to business accommodations observed were compared to cases where no measures were taken.
Resumo:
Transportation construction is substantially different from other construction fields due to widespread use of unit price bidding and competitive contract awarding. Thus, the potential for change orders has been the main source of unbalanced bidding for contractors, which can be described as substantial increases in work quantity or reasonable changes to the initial design provided by the State Highway Agencies (SHAs). It is important to understand the causes of the change orders as cost related issues are the main reason for contract disputes. We have analyzed a large dataset from a major SHA to identify project related and environmental factors that affect the change order costs. The results of the study can be instrumental in assessing the increased costs associated with change orders and better management measures can be taken to mitigate their effects.
Resumo:
An investigation of the construction data management needs of the Florida Department of Transportation (FDOT) with regard to XML standards including development of data dictionary and data mapping. The review of existing XML schemas indicated the need for development of specific XML schemas. XML schemas were developed for all FDOT construction data management processes. Additionally, data entry, approval and data retrieval applications were developed for payroll compliance reporting and pile quantity payment development.