584 resultados para Construction contests
Resumo:
This study examines the process by which newly recruited nuclear engineering and technical staff came to understand, define, think, feel and behave within a distinct group that has a direct contribution to the organization's overall emphasis on a culture of reliability and system safety. In the field of organizational behavior the interactive model of social identity formation has been recently proposed to explain the process by which the internalization of shared norms and values occurs, an element critical in identity formation. Using this rich model of organizational behavior we analyzed multiple sources of data from nine new hires over a period of three years. This was done from the time they were employed to investigate the construction of social identity by new entrants entering into a complex organizational setting reflected in the context of a nuclear facility. Informed by our data analyses, we found support for the interactive model of social identity development and report the unexpected finding that a newly appointed member's age and level of experience appears to influence the manner in which they adapt, and assimilate into their surroundings. This study represents an important contribution to the safety and reliability literature as it provides a rich insight into the way newly recruited employees enact the process by which their identities are formed and hence act, particularly under conditions of duress or significant organizational disruption in complex organizational settings.
Resumo:
This thesis is an empirical study of the factors impacting on the client involvement in Saudi Arabian construction government projects. The study investigated the impact of some factors that limited the client involvement and developed a framework called "client involvement interactive" to improve the client involvement practices in Saudi Arabian construction projects through the implementation of an implementable strategy elaborated.
Resumo:
The decision of Wilson J in Calvert v Nickless Ltd [2004] QSC 449 involves significant questions of interpretation of sections 315 and 317 of the Workcover Queensland Act 1996 (Qld) relating to claims for damages for future economic loss and for gratuitous services.
Resumo:
If there is a silver lining to the adversarial, dispute-prone nature of the building and construction industry, it can be found in the concomitant rise of innovative dispute resolution mechanisms. Time, cost and relationship concerns have meant that the formal adversarial system holds little appeal for disputing parties. As these alternative forms of dispute avoidance/resolution have matured in Australia over the last 20 years, attention has turned to the key characteristics of each process and their suitability to the building and construction industry. This article considers the role of dispute review boards (DRBs) and mediation as two alternative methods for avoiding/resolving disputes in the construction industry. Criteria are established for evaluating the efficacy of these procedures and their sensitivity to the needs of construction industry disputants. The ultimate conclusion reached is that DRBs represent a powerful, yet underutilised dispute resolution tool in Australia, and possess many industry-specific advantages that more traditional forms of alternative dispute resolution (particularly mediation) do not provide.
Resumo:
In Smit v Chan [2001] QSC 493 (Supreme Court of Queensland, S1233 of 1995, Mullins J, 21.12.2001) the sixth defendant successfully obtained an order that a complex medical negligence action be tried without a jury. This was the first application to be decided under r474 of UCPR 1999, and the decision is a significant precedent for defendants in similar cases who want to avoid the unpredictability of outcome and the inflated damages awards sometimes associated with jury trials.
Resumo:
Background Early feeding practices lay the foundation for children’s eating habits and weight gain. Questionnaires are available to assess parental feeding but overlapping and inconsistent items, subscales and terminology limit conceptual clarity and between study comparisons. Our aim was to consolidate a range of existing items into a parsimonious and conceptually robust questionnaire for assessing feeding practices with very young children (<3 years). Methods Data were from 462 mothers and children (age 21–27 months) from the NOURISH trial. Items from five questionnaires and two study-specific items were submitted to a priori item selection, allocation and verification, before theoretically-derived factors were tested using Confirmatory Factor Analysis. Construct validity of the new factors was examined by correlating these with child eating behaviours and weight. Results Following expert review 10 factors were specified. Of these, 9 factors (40 items) showed acceptable model fit and internal reliability (Cronbach’s α: 0.61-0.89). Four factors reflected non-responsive feeding practices: ‘Distrust in Appetite’, ‘Reward for Behaviour’, ‘Reward for Eating’, and ‘Persuasive Feeding’. Five factors reflected structure of the meal environment and limits: ‘Structured Meal Setting’, ‘Structured Meal Timing’, ‘Family Meal Setting’, ‘Overt Restriction’ and ‘Covert Restriction’. Feeding practices generally showed the expected pattern of associations with child eating behaviours but none with weight. Conclusion The Feeding Practices and Structure Questionnaire (FPSQ) provides a new reliable and valid measure of parental feeding practices, specifically maternal responsiveness to children’s hunger/satiety signals facilitated by routine and structure in feeding. Further validation in more diverse samples is required.
Resumo:
Community-based protests against major construction and engineering projects are becoming increasingly common as concerns over issues such as corporate social accountability, climate change and corruption become more prominent in the public's mind. Public perceptions of risk associated with these projects can have a contagious effect, which mismanaged can escalate into long-term and sometimes acrimonious protest stand-offs that have negative implications for the community, firms involved and the construction industry as a whole. This paper investigates the role of core group members in sustaining community-based protest against construction and engineering projects. Using a thematic story telling approach which draws on ethnographic method and social contagion theories, it presents an in-depth analysis of a single case study - one of Australia's longest standing community protests against a construction project. It concludes that core group members play a critical role, within anarchic structures which provide a high degree of spontaneity and improvisation, in sustaining movement continuity by building collective identity, mobilising resources and a moving interface which developers find hard to communicate with.
Resumo:
Highway construction projects have direct impacts on adjacent businesses. The nature and the degree of impact depend on individual business characterization and project specific factors. The type of business is also a relevant factor in predicting the impact of transportation construction projects. This paper presents the results of research focused on developing an in-depth understanding of these relationships. The study includes project case studies of three transportation construction projects in Florida. Surveys were conducted with all adjacent businesses, which were combined with analyses of the business accommodation procedures employed by State Highway Agencies (SHAs) nationwide to provide measure the efficiency of present rules. The results include an analysis of differing priorities for different classification of businesses and development of design and construction management best practices to better accommodate businesses during highway construction. A pilot project that employed business accommodation principles devised in this research, and improvements to business accommodations observed were compared to cases where no measures were taken.
Resumo:
Transportation construction is substantially different from other construction fields due to widespread use of unit price bidding and competitive contract awarding. Thus, the potential for change orders has been the main source of unbalanced bidding for contractors, which can be described as substantial increases in work quantity or reasonable changes to the initial design provided by the State Highway Agencies (SHAs). It is important to understand the causes of the change orders as cost related issues are the main reason for contract disputes. We have analyzed a large dataset from a major SHA to identify project related and environmental factors that affect the change order costs. The results of the study can be instrumental in assessing the increased costs associated with change orders and better management measures can be taken to mitigate their effects.
Resumo:
An investigation of the construction data management needs of the Florida Department of Transportation (FDOT) with regard to XML standards including development of data dictionary and data mapping. The review of existing XML schemas indicated the need for development of specific XML schemas. XML schemas were developed for all FDOT construction data management processes. Additionally, data entry, approval and data retrieval applications were developed for payroll compliance reporting and pile quantity payment development.
Resumo:
Building Information Modelling (BIM) has been regarded as a one stop shop capable of addressing the ills of the construction industry. Yet, while some firms have accepted BIM as a new way to work and gone on to record success, others (which have not so done) have raised such questions as: ‘How is BIM defined? Is it a tool or a process? Which kinds and sizes of organisations stand to benefit from BIM?’ These questions form the basis of this research. Hence, having explored the relevant body of literature, this research investigates three organisations within the UK – described as the earliest adopters of BIM – and considers how they have fared in terms of project performance in the years since adopting BIM; focusing on project cost, delivery time and quality achievement. This investigation also probed two of the leading voices in BIM in the UK in search of the much needed answers. The findings of the research show that successful projects executed in the organisations that have used BIM is predicated on its adoption as a process, rather than as a tool of technology; a process that changes the way work in the construction industry is typically done. Moreover, the successes recorded in the firms researched give credence to project success consequent upon adopting BIM. Nevertheless, the findings of this research show that the cornerstone of this success is leadership-driven innovation.
Resumo:
This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.
Resumo:
Conceptually, the management of safety at roadworks can be seen in a three level framework. At the regulatory level, roadworks operate at the interface between the work environment, governed by workplace health and safety regulations, and the road environment, which is subject to road traffic regulations and practices. At the organizational level, national, state and local governments plan and purchase road construction and maintenance which are then delivered in-house or tendered out to large construction companies who often subcontract multiple smaller companies to supply services and labor. At the operational level, roadworks are difficult to isolate from the general public, hindering effective occupational health and safety controls. This study, from the State of Queensland, Australia, examines how well this tripartite framework functions. It includes reviews of organizational policy and procedures documents; interviews with 24 subject matter experts from various road construction and maintenance organizations, and on-site interviews with 66 road construction personnel. The study identified several factors influencing the translation of safety policies into practice including the cost of safety measures in the context of competitive tendering, lack of firm evidence of the effectiveness of safety measures, and pressures to minimize disruption to the travelling public.