479 resultados para Illinois Building Commission


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study examined the potential for apartment living to become more socially and environmentally acceptable in Australian society generally, and in subtropical cities particularly. Resolution of incongruities between residents' preferred attributes and other stakeholders' main interests has important implications for reshaping lifestyle expectations and design practice as society moves toward a post-carbon future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The benefits of peer leader experiences in building graduate skills and capabilities, is well documented and recognised in the higher education sector (Ender & Kay, 2001; Lindsey, Weiler, Zarich, Haddock, Krafchick, & Zimmerman, 2014; Shook & Keup, J., 2012). While benefits are acknowledged, responsibility for identifying, structuring and recording the learning experiences and learning outcomes is charged to the student. This poster describes a framework ‘The Peer Leader Capacity Building Model’ that purposefully structures the peer-leader’s learning journey providing: timely training, moments of critical reflection and goal setting. The model articulates the fundamental interplay of learning and peer leader service which forms the peer ‘learnership’. The journey begins with the ‘aspiration’ phase where students come to understand their leadership opportunities, progressing through ‘enabling’ and ‘mastering’ phases where students shape their learner-leader experience, and finally, to the ‘contributing graduate’ phase where students emerge as competent graduates able to confidently participate in their communities and workplaces. In shifting from a program centric approach that priorities the needs of the mentees, the Peer Leader Capacity Building Model focuses on the individual as a peer leader encouraging the student to shape their individual ‘learnscape’ through consciously navigating both their curricula and co-curricular learning experiences.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project examined the role that written specifications play in the building procurement process and the relationship that specifications should have with respect to the use of BIM within the construction industry. A three-part approach was developed to integrate specifications, product libraries and BIM. Typically handled by different disciplines within project teams, these provide the basis for a holistic approach to the development of building descriptions through the design process and into construction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public buildings and large infrastructure are typically monitored by tens or hundreds of cameras, all capturing different physical spaces and observing different types of interactions and behaviours. However to date, in large part due to limited data availability, crowd monitoring and operational surveillance research has focused on single camera scenarios which are not representative of real-world applications. In this paper we present a new, publicly available database for large scale crowd surveillance. Footage from 12 cameras for a full work day covering the main floor of a busy university campus building, including an internal and external foyer, elevator foyers, and the main external approach are provided; alongside annotation for crowd counting (single or multi-camera) and pedestrian flow analysis for 10 and 6 sites respectively. We describe how this large dataset can be used to perform distributed monitoring of building utilisation, and demonstrate the potential of this dataset to understand and learn the relationship between different areas of a building.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

‘Complexity’ is a term that is increasingly prevalent in conversations about building capacity for 21st Century professional engineers. Society is grappling with the urgent and challenging reality of accommodating seven billion people, meeting needs and innovating lifestyle improvements in ways that do not destroy atmospheric, biological and oceanic systems critical to life. Over the last two decades in particular, engineering educators have been active in attempting to build capacity amongst professionals to deliver ‘sustainable development’ in this rapidly changing global context. However curriculum literature clearly points to a lack of significant progress, with efforts best described as ad hoc and highly varied. Given the limited timeframes for action to curb environmental degradation proposed by scientists and intergovernmental agencies, the authors of this paper propose it is imperative that curriculum renewal towards education for sustainable development proceeds rapidly, systemically, and in a transformational manner. Within this context, the paper discusses the need to consider a multiple track approach to building capacity for 21st Century engineering, including priorities and timeframes for undergraduate and postgraduate curriculum renewal. The paper begins with a contextual discussion of the term complexity and how it relates to life in the 21st Century. The authors then present a whole of system approach for planning and implementing rapid curriculum renewal that addresses the critical roles of several generations of engineering professionals over the next three decades. The paper concludes with observations regarding engaging with this approach in the context of emerging accreditation requirements and existing curriculum renewal frameworks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although road construction and use provides significant economic and social benefits its environmental impact is of growing concern. Roads are one of the greatest greenhouse gas contributors both directly through fossil energy consumed in mining, transporting, earthworks, and paving work, along with in-direct emissions from road use by vehicles. This discussion paper will outline opportunities within the Australian context for reducing environmental pressure in road building and consider the future environmental impacts of road projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Before tissue plasminogen activator (tPA) was licensed for use in Canada, in February 1999, the Calgary Regional Stroke Program spearheaded the development and organization of local resources to use thrombolytic therapy in patients who had experienced acute ischemic stroke. In 1996 special permission was obtained from the Calgary Regional Health Authority to use intravenously administered tPA for acute ischemic stroke, and ethical and scientific review boards approved the protocols. After 3 years our efforts have resulted in improved patient outcomes, shorter times from symptom onset to treatment and acceptable adverse event rates. Areas for continued improvement include the door-to-needle time and broader education of the public about the symptoms of acute ischemic stroke.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study is to examine the current level of stakeholder involvement during the project's planning process. Stakeholders often provide the needed resources and have the ability to control the interaction and resource flows in the network. They also ultimately have strong impact on an organisation's survival, and therefore appropriate management and involvement of key stakeholders should be an important part of any project management plan. A series of literature reviews was conducted to identify and categorise significant phases involved in the planning. For data collection, a questionnaire survey was designed and distributed amongst nearly 200 companies who were involved in the residential building sector in Australia. Results of the analysis demonstrate the engagement levels of the four stakeholder groups involved in the planning process and establish a basis for further stakeholder involvement improvement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

While numerous full scale experimental programs have been conducted around the world over the past 50 years to investigate the behaviour of steel portal frame buildings, none have comprehensively investigated the behaviour of such buildings under wind uplift. Wind uplift loads often govern designs in the Australian environment and this became the subject of a recent research project at Queensland University of Technology (OUT). This paper describes the full scale experiments on a steel portal frame building subject to wind uplift, racking and gravity loads. The portal rafter and column members utilised hollow flange beam (HFB) sections [5-8] though the paper's findings on the theoretical and experimental building responses relate to conventional types of steel portal frame buildings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Commission has been asked to identify appropriate options for reducing entry and exit barriers including advice on the potential impacts of the personal/corporate insolvency regimes on business exits...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Commission has released a Draft Report on Business Set-Up, Transfer and Closure for public consultation and input. It is pleasing to note that three chapters of the Draft Report address aspects of personal and corporate insolvency. Nevertheless, we continue to make the submission to national policy inquiries and discussions that a comprehensive review should be undertaken of the regulation of insolvency and restructuring in Australia. The last comprehensive review of the insolvency system was by the Australian Law Reform Commission (the Harmer Report) and was handed down in 1988. Whilst there have been aspects of our insolvency laws that have been reviewed since that time, none has been able to provide the clear and comprehensive analysis that is able to come from a more considered review. Such a review ought to be conducted by the Australian Law Reform Commission or similar independent panel set up for the task. We also suggest that there is a lack of data available to assist with addressing questions raised by the Draft Report. There is a need to invest in finding out, in a rigorous and informed way, how the current law operates. Until there is a willingness to make a public investment in such research with less reliance upon the anecdotal (often from well-meaning but ultimately inadequately informed participants and others) the government cannot be sure that the insolvency regime we have provides the most effective regime to underpin Australia’s commercial and financial dealings, nor that any change is justified. We also make the submission that there are benefits in a serious investigation into a merged regulatory architecture of personal and corporate insolvency and a combined personal and corporate insolvency regulator.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

How can obstacles to innovation be overcome in road construction? Using a focus group methodology, and based on two prior rounds of empirical work, the analysis in this chapter generates a set of four key solutions to two main construction innovation obstacles: (1) restrictive tender assessment and (2) disagreement over who carries the risk of new product failure. The four key solutions uncovered were: 1) pre-project product certification; 2) past innovation performance assessment; 3) earlier involvement of product suppliers and road asset operators; and 4) performance-based specifications. Additional research is suggested in order to illicit deeper insights into possible solutions to construction innovation obstacles, and should emphasise furthering the theoretical interpretation of empirical phenomena.