526 resultados para Process management,


Relevância:

30.00% 30.00%

Publicador:

Resumo:

A novel intelligent online demand side management system is proposed for peak load management. The method also regulates the network voltage, balances the power in three phases and coordinates the battery storage discharge within the network. This method uses low cost controllers with low bandwidth two-way communication installed in costumers' premises and at distribution transformers to manage the peak load while maximizing customer satisfaction. A multi-objective decision making process is proposed to select the load(s) to be delayed or controlled. The efficacy of the proposed control system is verified through an event-based developed simulation in Matlab.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A novel intelligent online demand management system is discussed in this chapter for peak load management in low voltage residential distribution networks based on the smart grid concept. The discussed system also regulates the network voltage, balances the power in three phases and coordinates the energy storage within the network. This method uses low cost controllers, with two-way communication interfaces, installed in costumers’ premises and at distribution transformers to manage the peak load while maximizing customer satisfaction. A multi-objective decision making process is proposed to select the load(s) to be delayed or controlled. The efficacy of the proposed control system is verified by a MATLAB-based simulation which includes detailed modeling of residential loads and the network.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The measures by which major developments are officially approved for construction are - by common agreement - complex, time-consuming, and of questionable merit in terms of maintaining ecological viability.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As the biggest expo site in history, construction of the Shanghai Expo site faced a lot of challenges, including involvement of lots of investors, megaconstruction scale, concurrent construction mode, involvement of more than 40,000 migrant workers, and extremely tight completion deadlines, among others. Consequently, these challenges imposed great obstacles on accomplishing the safety, quality, and environmental goals. Through a case study of the Shanghai Expo construction, this paper paper presents the design and implementation of multicriteria incentives in megaprojects to accomplish the safety, quality, and environmental goals. Both quantitative and qualitative findings were triangulated to demonstrate the outcome of the incentives. Six critical success factors (CSFs) for the incentives, rule design, process orientation, top management support, training and promotion, communication in process, and process learning and improvement are identified and validated through case study data and content analysis. It is believed that the findings of this paper can enhance understanding of multicriteria incentive schemes in general and provide insights in implementing these incentive schemes in future megaprojects, particularly in the People’s Republic of China (PRC).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

IT resources are indispensable in the management of Public Sector Organizations (PSOs) around the world. We investigate the factors that could leverage the IT resources in PSOs in developing economies. While research on ways to leverage IT resources in private sector organizations of developed countries is substantial, our understanding on ways to leverage the IT resources in the public sector in developing countries is limited. The current study aspires to address this gap in the literature by seeking to determine the key factors required to create process value from public sector IT investments in developing countries. We draw on the resource-centric theories to imply the nature of factors that could leverage the IT resources in the public sector. Employing an interpretive design, we identified three factors necessary for IT process value generation in the public sector. We discuss these factors and state their implications to theory and practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The ineffectiveness of current design processes has been well studied and has resulted in widespread calls for the evolution and development of new management processes. Even following the advent of BIM, we continue to move from one stage to another without necessarily having resolved all the issues. CAD design technology, if well handled, could have significantly raised the level of quality and efficiency of current processes, but in practice this was not fully realized. Therefore, technology alone can´t solve all the problems and the advent of BIM could result in a similar bottleneck. For a precise definition of the problem to be solved we should start by understanding what are the main current bottlenecks that have yet to be overcome by either new technologies or management processes, and the impact of human behaviour-related issues which impact the adoption and utilization of new technologies. The fragmented and dispersed nature of the AEC sector, and the huge number of small organizations that comprise it, are a major limiting factor. Several authors have addressed this issue and more recently IDDS has been defined as the highest level of achievement. However, what is written on IDDS shows an extremely ideal situation on a state to be achieved; it shows a holistic utopian proposition with the intent to create the research agenda to move towards that state. Key to IDDS is the framing of a new management model which should address the problems associated with key aspects: technology, processes, policies and people. One of the primary areas to be further studied is the process of collaborative work and understanding, together with the development of proposals to overcome the many cultural barriers that currently exist and impede the advance of new management methods. The purpose of this paper is to define and delimit problems to be solved so that it is possible to implement a new management model for a collaborative design process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent information systems development using agile project management has yielded a 50% reduction in effort, together with significant improvements in organisational skills, productivity, quality and business satisfaction.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research has developed a framework to improve the effectiveness and efficiency of stakeholder involvement during the early planning stages of residential construction projects, in order to improve many of the quality issues that occur during the construction phases of such projects. A mixed methods approach (survey, interviews and case studies) was employed to collect the required data. It is expected that with development, this framework can bring some significant benefits to future construction projects in terms of reducing rework and wastage, improving timely delivery and avoiding disputes. The research is also anticipated to produce three high impact journal articles.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Brisbane City Hall (BCH) is arguably one of Brisbane’s most notable and iconic buildings. Serving as the public’s central civic and municipal building since 1930, the importance of this heritage listed building to cultural significance and identity is unquestionable. This attribute is reflected within the local government, with a simplified image of the halls main portico entrance supplying Brisbane City Council with its insignia and trademark signifier. Regardless of these qualities, this building has been neglected in a number of ways, primarily in the physical sense with built materials, but also, and just as importantly, through inaccurate and undocumented works. Numerous restoration and renovation works have been undertaken throughout BCH’s lifetime, however the records of these amendments are far and few between. Between 2010 and 2013, BCH underwent major restoration works, the largest production project undertaken on the building since its initial construction. Just prior to this conservation process, the full extent of the buildings deterioration was identified, much of which there was little to no original documentation of. This has led to a number of issues pertaining to what investigators expected to find within the building, versus what was uncovered (the unexpected), which have resulted directly from this lack of data. This absence of record keeping is the key factor that has contributed to the decay and unknown deficiencies that had amassed within BCH. Accordingly, this raises a debate about the methods of record keeping, and the need for a more advanced process that is able to be integrated within architectural and engineering programs, whilst still maintaining the ability to act as a standalone database. The immediate objective of this research is to investigate the restoration process of BCH, with focus on the auditorium, to evaluate possible strategies to record and manage data connected to building pathology so that a framework can be developed for a digital heritage management system. The framework produced for this digital tool will enable dynamic uses of a centralised database and aims to reduce the significant data loss. Following an in-depth analysis of this framework, it can be concluded that the implementation of the suggested digital tool would directly benefit BCH, and could ultimately be incorporated into a number of heritage related built form.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Service processes such as financial advice, booking a business trip or conducting a consulting project have emerged as units of analysis of high interest for the business process and service management communities in practice and academia. While the transactional nature of production processes is relatively well understood and deployed, the less predictable and highly interactive nature of service processes still lacks in many areas appropriate methodological grounding. This paper proposes a framework of a process laboratory as a new IT artefact in order to facilitate the holistic analysis and simulation of such service processes. Using financial services as an example, it will be shown how such a process laboratory can be used to reduce the complexity of service process analysis and facilitate operational service process control.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this editorial letter, we provide the readers of Information Systems Management with a background on process design before we discuss the content of the special issue proper. By introducing and describing a so-called process design compass we aim to clarify what developments in the field are taking place and how the papers in this special issue expand on our current knowledge in this domain.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study explored how the social context influences the stress-buffering effects of social support on employee adjustment. It was anticipated that the positive relationship between support from colleagues and employee adjustment would be more marked for those strongly identifying with their work team. Furthermore, as part of a three-way interactive effect, it was predicted that high identification would increase the efficacy of coworker support as a buffer of two role stressors (role overload and role ambiguity). One hundred and 55 employees recruited from first-year psychology courses enrolled at two Australian universities were surveyed. Hierarchical multiple regression analyses revealed that the negative main effect of role ambiguity on job satisfaction was significant for those employees with low levels of team identification, whereas high team identifiers were buffered from the deleterious effect of role ambiguity on job satisfaction. There also was a significant interaction between coworker support and team identification. The positive effect of coworker support on job satisfaction was significant for high team identifiers, whereas coworker support was not a source of satisfaction for those employees with low levels of team identification. A three-way interaction emerged among the focal variables in the prediction of psychological well-being, suggesting that the combined benefits of coworker support and team identification under conditions of high demand may be limited and are more likely to be observed when demands are low.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Although integrated marketing communication (IMC) has progressed towards midrange maturity level, its full-scale adoption has been impeded by a lack of consensus on its defining constructs. The purpose of this study is to move from abstraction to define the construct of strategic integration (SI) and develop this into a management tool, thus making an important contribution to both the theory and practice of IMC. Drawing from both IMC and strategic management literature, the construct of SI is operationalised into a number of key factors and a well-cited management model, Fuchs’ ‘integration valuator’ is explored as the starting point of a measurement tool for IMC. To do this, a Delphi study invites the scrutiny of an expert panel of world-leading IMC researchers and practitioners. The panel validated the model construction process,redefined overarching constructs and key factors with a high degree of consensus, supported a process measure, suggested a weighted evaluation measure and recognised the importance of developing such a measure. They delivered clear and consistent imperatives guiding model development. The result is a measure of SI that evaluates organisational proficiency and diagnoses the integration of IMC campaigns. It also advances theory by providing a better understanding of the construct of SI.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper sets out to contribute to the literature on the design and the implementation of management control systems. To this end, we question what is discussed when a management control system is to be chosen and on what decision-making eventually rests. This study rests upon an ethnomethodology of the Salvation Army’s French branch. Operating in the dual capacity of a researcher and a counsellor to management, between 2000 and 2007, we have unrestricted access to internal data revealing the backstage of management control: discussions and interactions surrounding the choosing of control devices. We contribute to understanding the arising of a need for control, the steps and process followed to decide upon a management control system, and controls in nonprofits. [Cet article vise à contribuer à la littérature sur la mise en place des systèmes de contrôle de gestion. À cette fin, nous questionnons ce qui est discuté lors du choix d’un système de contrôle et sur quoi repose in fine la décision. Cet article est fondé sur une approche ethnométhodologique de l’Armée du Salut en France permise par notre double qualité de chercheurs mais également de conseiller auprès de la direction de l’organisation entre 2000 et 2007. Un accès illimité à des données internes nous permet ainsi de mettre en lumière les aspects méconnus et invisibles du contrôle de gestion : les discussions et interactions entourant le choix d’outils. Nous contribuons à la compréhension de l’émergence du besoin de contrôle, des étapes et du processus de choix d’outils et enfin du contrôle de gestion dans une organisation à but non lucratif.]

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Periprosthetic joint infection (PJI) after THA is a major complication with an incidence of 1-3%. We report our experiences with a technique using a custom-made articulating spacer (CUMARS) at the first of two-stage treatment for PJI. This technique uses widely available all-polyethylene acetabular components and the Exeter Universal stem, fixed using antibiotic loaded acrylic cement. Seventy-six hips were treated for PJI using this technique. Performed as the first of a two-stage procedure, good functional results were commonly seen, leading to postponing second stage indefinitely with retention of the CUMARS prosthesis in 34 patients. The CUMARS technique presents an alternative to conventional spacers, using readily available components that are well tolerated, allowing weight bearing and mobility, and achieving comparable eradication rates.