518 resultados para Building failures.
Resumo:
Building information modelling (BIM) radically changes the practices in architecture, engineering and construction (AEC) and creates new job opportunities. Many governments, such as the United Kingdom, have made BIM a mandatory requirement. This substantially drives the demand for a BIM-literate workforce. Universities are facing the challenge to incorporate BIM into their curricula and produce “BIM ready” graduates to meet the needs of the industry. Like other universities, Queensland University of Technology (QUT) is at the heart of this change and aspires to develop collaborative BIM education across AEC. Previous BIM education studies identify that inadequate BIM awareness of AEC academics is one of the challenges for developing a BIM curriculum and there is a dearth in the learning and teaching support for academics on BIM education. Equipping the AEC academics for a more BIM focused curriculum is all the while more important. This paper aims to leverage knowledge drawn from a Learning & Teaching project currently undertaken at QUT. Its specific objectives are to: 1) review the existing learning and teaching initiatives on BIM education; and 2) briefly describe the learning and teaching activities on collaborative BIM education at QUT. Significance of the paper lies on revealing the importance of building up the capacity of AEC academics for collaborative BIM education. The paper contributes to sparking the interests in better equipping AEC academics to understand what curriculum changes would assist in BIM uptake within the relevant courses to provide context for changes in units; and how the use of BIM can improve the understanding by students of the large amounts of professional knowledge they need to function effectively as graduates.
Resumo:
Extreme wind events such as tropical cyclones, tornadoes and storms are more likely to impact the Australian coastal regions due to possible climate changes. Such events can be extremely destructive to building structures, in particular, low-rise buildings with lightweight roofing systems that are commonly made of thin steel roofing sheets and battens. Large wind uplift loads that act on the roofs during high wind events often cause premature roof connection failures. Recent wind damage investigations have shown that roof failures have mostly occurred at the batten to rafter or truss screw connections. In most of these cases, the screw fastener heads pulled through the bottom flanges of thin steel roof battens. This roof connection failure is very critical as both roofing sheets and battens will be lost during the high wind events. Hence, a research study was conducted to investigate this critical pull-through failure using both experimental and numerical methods. This paper presents the details of numerical modeling and the results.
Resumo:
In 1966, a British planner called Maurice Broady came up with a new term for the architectural lexicon: architectural determinism. This was to describe the practice of groundlessly asserting that design solutions would change behaviour in a predictable and positive way. It was a new phrase but the belief system behind it – that buildings shape behaviour – had allowed the heroes of architecture to make all kinds of outlandish claims.
Resumo:
This study examined the potential for apartment living to become more socially and environmentally acceptable in Australian society generally, and in subtropical cities particularly. Resolution of incongruities between residents' preferred attributes and other stakeholders' main interests has important implications for reshaping lifestyle expectations and design practice as society moves toward a post-carbon future.
Resumo:
The benefits of peer leader experiences in building graduate skills and capabilities, is well documented and recognised in the higher education sector (Ender & Kay, 2001; Lindsey, Weiler, Zarich, Haddock, Krafchick, & Zimmerman, 2014; Shook & Keup, J., 2012). While benefits are acknowledged, responsibility for identifying, structuring and recording the learning experiences and learning outcomes is charged to the student. This poster describes a framework ‘The Peer Leader Capacity Building Model’ that purposefully structures the peer-leader’s learning journey providing: timely training, moments of critical reflection and goal setting. The model articulates the fundamental interplay of learning and peer leader service which forms the peer ‘learnership’. The journey begins with the ‘aspiration’ phase where students come to understand their leadership opportunities, progressing through ‘enabling’ and ‘mastering’ phases where students shape their learner-leader experience, and finally, to the ‘contributing graduate’ phase where students emerge as competent graduates able to confidently participate in their communities and workplaces. In shifting from a program centric approach that priorities the needs of the mentees, the Peer Leader Capacity Building Model focuses on the individual as a peer leader encouraging the student to shape their individual ‘learnscape’ through consciously navigating both their curricula and co-curricular learning experiences.
Resumo:
This project examined the role that written specifications play in the building procurement process and the relationship that specifications should have with respect to the use of BIM within the construction industry. A three-part approach was developed to integrate specifications, product libraries and BIM. Typically handled by different disciplines within project teams, these provide the basis for a holistic approach to the development of building descriptions through the design process and into construction.
Resumo:
Public buildings and large infrastructure are typically monitored by tens or hundreds of cameras, all capturing different physical spaces and observing different types of interactions and behaviours. However to date, in large part due to limited data availability, crowd monitoring and operational surveillance research has focused on single camera scenarios which are not representative of real-world applications. In this paper we present a new, publicly available database for large scale crowd surveillance. Footage from 12 cameras for a full work day covering the main floor of a busy university campus building, including an internal and external foyer, elevator foyers, and the main external approach are provided; alongside annotation for crowd counting (single or multi-camera) and pedestrian flow analysis for 10 and 6 sites respectively. We describe how this large dataset can be used to perform distributed monitoring of building utilisation, and demonstrate the potential of this dataset to understand and learn the relationship between different areas of a building.
Resumo:
‘Complexity’ is a term that is increasingly prevalent in conversations about building capacity for 21st Century professional engineers. Society is grappling with the urgent and challenging reality of accommodating seven billion people, meeting needs and innovating lifestyle improvements in ways that do not destroy atmospheric, biological and oceanic systems critical to life. Over the last two decades in particular, engineering educators have been active in attempting to build capacity amongst professionals to deliver ‘sustainable development’ in this rapidly changing global context. However curriculum literature clearly points to a lack of significant progress, with efforts best described as ad hoc and highly varied. Given the limited timeframes for action to curb environmental degradation proposed by scientists and intergovernmental agencies, the authors of this paper propose it is imperative that curriculum renewal towards education for sustainable development proceeds rapidly, systemically, and in a transformational manner. Within this context, the paper discusses the need to consider a multiple track approach to building capacity for 21st Century engineering, including priorities and timeframes for undergraduate and postgraduate curriculum renewal. The paper begins with a contextual discussion of the term complexity and how it relates to life in the 21st Century. The authors then present a whole of system approach for planning and implementing rapid curriculum renewal that addresses the critical roles of several generations of engineering professionals over the next three decades. The paper concludes with observations regarding engaging with this approach in the context of emerging accreditation requirements and existing curriculum renewal frameworks.
Resumo:
Although road construction and use provides significant economic and social benefits its environmental impact is of growing concern. Roads are one of the greatest greenhouse gas contributors both directly through fossil energy consumed in mining, transporting, earthworks, and paving work, along with in-direct emissions from road use by vehicles. This discussion paper will outline opportunities within the Australian context for reducing environmental pressure in road building and consider the future environmental impacts of road projects.
Resumo:
Before tissue plasminogen activator (tPA) was licensed for use in Canada, in February 1999, the Calgary Regional Stroke Program spearheaded the development and organization of local resources to use thrombolytic therapy in patients who had experienced acute ischemic stroke. In 1996 special permission was obtained from the Calgary Regional Health Authority to use intravenously administered tPA for acute ischemic stroke, and ethical and scientific review boards approved the protocols. After 3 years our efforts have resulted in improved patient outcomes, shorter times from symptom onset to treatment and acceptable adverse event rates. Areas for continued improvement include the door-to-needle time and broader education of the public about the symptoms of acute ischemic stroke.
Resumo:
The purpose of this study is to examine the current level of stakeholder involvement during the project's planning process. Stakeholders often provide the needed resources and have the ability to control the interaction and resource flows in the network. They also ultimately have strong impact on an organisation's survival, and therefore appropriate management and involvement of key stakeholders should be an important part of any project management plan. A series of literature reviews was conducted to identify and categorise significant phases involved in the planning. For data collection, a questionnaire survey was designed and distributed amongst nearly 200 companies who were involved in the residential building sector in Australia. Results of the analysis demonstrate the engagement levels of the four stakeholder groups involved in the planning process and establish a basis for further stakeholder involvement improvement.
Resumo:
When thin steel roof and wall cladding systems are subjected to wind uplift/suction forces, local pull-through or pull-out failures occur prematurely at their screwed connections. During high wind events such as stom1s and cyclones, these localized failures then lead to severe damage to buildings and their contents. In recent times, the use of thin steel battens, purlins and girts has increased considerably, which has made the pull-out failures more critical in the design of steel cladding systems. An experimental investigation was therefore carried out to study the pull-out failure using both static and cyclic tests for a range of commonly used screw fasteners and steel battens, purlins and girts. This paper presents the details ofthis experimental investigation and its results.
Resumo:
While numerous full scale experimental programs have been conducted around the world over the past 50 years to investigate the behaviour of steel portal frame buildings, none have comprehensively investigated the behaviour of such buildings under wind uplift. Wind uplift loads often govern designs in the Australian environment and this became the subject of a recent research project at Queensland University of Technology (OUT). This paper describes the full scale experiments on a steel portal frame building subject to wind uplift, racking and gravity loads. The portal rafter and column members utilised hollow flange beam (HFB) sections [5-8] though the paper's findings on the theoretical and experimental building responses relate to conventional types of steel portal frame buildings.
Resumo:
How can obstacles to innovation be overcome in road construction? Using a focus group methodology, and based on two prior rounds of empirical work, the analysis in this chapter generates a set of four key solutions to two main construction innovation obstacles: (1) restrictive tender assessment and (2) disagreement over who carries the risk of new product failure. The four key solutions uncovered were: 1) pre-project product certification; 2) past innovation performance assessment; 3) earlier involvement of product suppliers and road asset operators; and 4) performance-based specifications. Additional research is suggested in order to illicit deeper insights into possible solutions to construction innovation obstacles, and should emphasise furthering the theoretical interpretation of empirical phenomena.
Resumo:
During post-disaster recovery, an infrastructure system may be subject to a number of disturbances originating from several other interdependent infrastructures. These disturbances might result in a series of system failures, thereby having immediate impact on societal living conditions. The inability to detect signs of disturbance from one infrastructure during recovery might cause significant disruptive effects on other infrastructure via the interconnection that exist among them. In such circumstances, it clearly appears that critical infrastructures' interdependencies affect the recovery of each individual infrastructure, as well as those of other interdependent infrastructure systems. This is why infrastructure resilience needs to be improved in function of those interdependencies, particularly during the recovery period to avoid the occurrence of a ‘disaster of disaster’ scenario. Viewed from this perspective, resilience is achieved through an inter-organisational collaboration between the different organisations involved in the reconstruction of interdependent infrastructure systems. This paper suggests that to some extent, the existing degree of interconnectedness between these infrastructure systems can also be found in their resilience ability during post-disaster recovery. For instance, without a resilient energy system, a large-scale power outage could affect simultaneously all the interdependent infrastructures after a disaster. Thus, breaking down the silos of resilience would be the first step in minimizing the risks of disaster failures from one infrastructure to cascade or escalate to other interconnected systems.