504 resultados para instrumented RC building


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis examined the long-term impact of the community arts education project Yonder, a collaboration between Education Queensland and Queensland Performing Arts Centre. The findings from the data reveal that the project was still having impact twelve months after its completion and that in some instances the project served as a 'circuit-breaker', especially for special needs students and struggling students. The intervention of a rich arts project proved to be an opportunity for these students to learn in a different way and to perceive themselves in a new and reinvented light. This confidence was found to transfer into other aspects of their learning.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Global shifts in design practice, design education and in higher education in general have radically changed teaching practices over the past decade. In a time of tightening budgets and other factors, various paradigm shifts and challenges are continually evolving and rapidly changing the higher education landscape. Rising to these challenges and responding to them is a complex task, requiring creative approaches applied to traditional methods and tools in interior architecture and interior design courses. The focus of this paper is a discussion of the adaptation of an ‘old school’ traditional tutorial approach within the context of online interior design education, which was applied in an endeavour to increase student engagement with current relevant literature pertinent to interior design theory and practice. The adaptation and application of this tutorial approach, the O-tutorial, creates a necessary link to critical thinking and meta-cognition connecting theoretical concepts to interior design process and practice. Initial data reveals that the O-tutorial allows students to engage and critically analyse issues surrounding theory and practice, thus equipping them with the skills as future design professionals. The paper concludes with reflections and recommendations for interior design education and future potential use and application of the O-tutorial.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building information modelling (BIM) radically changes the practices in architecture, engineering and construction (AEC) and creates new job opportunities. Many governments, such as the United Kingdom, have made BIM a mandatory requirement. This substantially drives the demand for a BIM-literate workforce. Universities are facing the challenge to incorporate BIM into their curricula and produce “BIM ready” graduates to meet the needs of the industry. Like other universities, Queensland University of Technology (QUT) is at the heart of this change and aspires to develop collaborative BIM education across AEC. Previous BIM education studies identify that inadequate BIM awareness of AEC academics is one of the challenges for developing a BIM curriculum and there is a dearth in the learning and teaching support for academics on BIM education. Equipping the AEC academics for a more BIM focused curriculum is all the while more important. This paper aims to leverage knowledge drawn from a Learning & Teaching project currently undertaken at QUT. Its specific objectives are to: 1) review the existing learning and teaching initiatives on BIM education; and 2) briefly describe the learning and teaching activities on collaborative BIM education at QUT. Significance of the paper lies on revealing the importance of building up the capacity of AEC academics for collaborative BIM education. The paper contributes to sparking the interests in better equipping AEC academics to understand what curriculum changes would assist in BIM uptake within the relevant courses to provide context for changes in units; and how the use of BIM can improve the understanding by students of the large amounts of professional knowledge they need to function effectively as graduates.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1966, a British planner called Maurice Broady came up with a new term for the architectural lexicon: architectural determinism. This was to describe the practice of groundlessly asserting that design solutions would change behaviour in a predictable and positive way. It was a new phrase but the belief system behind it – that buildings shape behaviour – had allowed the heroes of architecture to make all kinds of outlandish claims.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Traditionally, it is not easy to carry out tests to identify modal parameters from existing railway bridges because of the testing conditions and complicated nature of civil structures. A six year (2007-2012) research program was conducted to monitor a group of 25 railway bridges. One of the tasks was to devise guidelines for identifying their modal parameters. This paper presents the experience acquired from such identification. The modal analysis of four representative bridges of this group is reported, which include B5, B15, B20 and B58A, crossing the Carajás railway in northern Brazil using three different excitations sources: drop weight, free vibration after train passage, and ambient conditions. To extract the dynamic parameters from the recorded data, Stochastic Subspace Identification and Frequency Domain Decomposition methods were used. Finite-element models were constructed to facilitate the dynamic measurements. The results show good agreement between the measured and computed natural frequencies and mode shapes. The findings provide some guidelines on methods of excitation, record length of time, methods of modal analysis including the use of projected channel and harmonic detection, helping researchers and maintenance teams obtain good dynamic characteristics from measurement data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study examined the potential for apartment living to become more socially and environmentally acceptable in Australian society generally, and in subtropical cities particularly. Resolution of incongruities between residents' preferred attributes and other stakeholders' main interests has important implications for reshaping lifestyle expectations and design practice as society moves toward a post-carbon future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The benefits of peer leader experiences in building graduate skills and capabilities, is well documented and recognised in the higher education sector (Ender & Kay, 2001; Lindsey, Weiler, Zarich, Haddock, Krafchick, & Zimmerman, 2014; Shook & Keup, J., 2012). While benefits are acknowledged, responsibility for identifying, structuring and recording the learning experiences and learning outcomes is charged to the student. This poster describes a framework ‘The Peer Leader Capacity Building Model’ that purposefully structures the peer-leader’s learning journey providing: timely training, moments of critical reflection and goal setting. The model articulates the fundamental interplay of learning and peer leader service which forms the peer ‘learnership’. The journey begins with the ‘aspiration’ phase where students come to understand their leadership opportunities, progressing through ‘enabling’ and ‘mastering’ phases where students shape their learner-leader experience, and finally, to the ‘contributing graduate’ phase where students emerge as competent graduates able to confidently participate in their communities and workplaces. In shifting from a program centric approach that priorities the needs of the mentees, the Peer Leader Capacity Building Model focuses on the individual as a peer leader encouraging the student to shape their individual ‘learnscape’ through consciously navigating both their curricula and co-curricular learning experiences.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project examined the role that written specifications play in the building procurement process and the relationship that specifications should have with respect to the use of BIM within the construction industry. A three-part approach was developed to integrate specifications, product libraries and BIM. Typically handled by different disciplines within project teams, these provide the basis for a holistic approach to the development of building descriptions through the design process and into construction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public buildings and large infrastructure are typically monitored by tens or hundreds of cameras, all capturing different physical spaces and observing different types of interactions and behaviours. However to date, in large part due to limited data availability, crowd monitoring and operational surveillance research has focused on single camera scenarios which are not representative of real-world applications. In this paper we present a new, publicly available database for large scale crowd surveillance. Footage from 12 cameras for a full work day covering the main floor of a busy university campus building, including an internal and external foyer, elevator foyers, and the main external approach are provided; alongside annotation for crowd counting (single or multi-camera) and pedestrian flow analysis for 10 and 6 sites respectively. We describe how this large dataset can be used to perform distributed monitoring of building utilisation, and demonstrate the potential of this dataset to understand and learn the relationship between different areas of a building.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

‘Complexity’ is a term that is increasingly prevalent in conversations about building capacity for 21st Century professional engineers. Society is grappling with the urgent and challenging reality of accommodating seven billion people, meeting needs and innovating lifestyle improvements in ways that do not destroy atmospheric, biological and oceanic systems critical to life. Over the last two decades in particular, engineering educators have been active in attempting to build capacity amongst professionals to deliver ‘sustainable development’ in this rapidly changing global context. However curriculum literature clearly points to a lack of significant progress, with efforts best described as ad hoc and highly varied. Given the limited timeframes for action to curb environmental degradation proposed by scientists and intergovernmental agencies, the authors of this paper propose it is imperative that curriculum renewal towards education for sustainable development proceeds rapidly, systemically, and in a transformational manner. Within this context, the paper discusses the need to consider a multiple track approach to building capacity for 21st Century engineering, including priorities and timeframes for undergraduate and postgraduate curriculum renewal. The paper begins with a contextual discussion of the term complexity and how it relates to life in the 21st Century. The authors then present a whole of system approach for planning and implementing rapid curriculum renewal that addresses the critical roles of several generations of engineering professionals over the next three decades. The paper concludes with observations regarding engaging with this approach in the context of emerging accreditation requirements and existing curriculum renewal frameworks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although road construction and use provides significant economic and social benefits its environmental impact is of growing concern. Roads are one of the greatest greenhouse gas contributors both directly through fossil energy consumed in mining, transporting, earthworks, and paving work, along with in-direct emissions from road use by vehicles. This discussion paper will outline opportunities within the Australian context for reducing environmental pressure in road building and consider the future environmental impacts of road projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Before tissue plasminogen activator (tPA) was licensed for use in Canada, in February 1999, the Calgary Regional Stroke Program spearheaded the development and organization of local resources to use thrombolytic therapy in patients who had experienced acute ischemic stroke. In 1996 special permission was obtained from the Calgary Regional Health Authority to use intravenously administered tPA for acute ischemic stroke, and ethical and scientific review boards approved the protocols. After 3 years our efforts have resulted in improved patient outcomes, shorter times from symptom onset to treatment and acceptable adverse event rates. Areas for continued improvement include the door-to-needle time and broader education of the public about the symptoms of acute ischemic stroke.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study is to examine the current level of stakeholder involvement during the project's planning process. Stakeholders often provide the needed resources and have the ability to control the interaction and resource flows in the network. They also ultimately have strong impact on an organisation's survival, and therefore appropriate management and involvement of key stakeholders should be an important part of any project management plan. A series of literature reviews was conducted to identify and categorise significant phases involved in the planning. For data collection, a questionnaire survey was designed and distributed amongst nearly 200 companies who were involved in the residential building sector in Australia. Results of the analysis demonstrate the engagement levels of the four stakeholder groups involved in the planning process and establish a basis for further stakeholder involvement improvement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

While numerous full scale experimental programs have been conducted around the world over the past 50 years to investigate the behaviour of steel portal frame buildings, none have comprehensively investigated the behaviour of such buildings under wind uplift. Wind uplift loads often govern designs in the Australian environment and this became the subject of a recent research project at Queensland University of Technology (OUT). This paper describes the full scale experiments on a steel portal frame building subject to wind uplift, racking and gravity loads. The portal rafter and column members utilised hollow flange beam (HFB) sections [5-8] though the paper's findings on the theoretical and experimental building responses relate to conventional types of steel portal frame buildings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

How can obstacles to innovation be overcome in road construction? Using a focus group methodology, and based on two prior rounds of empirical work, the analysis in this chapter generates a set of four key solutions to two main construction innovation obstacles: (1) restrictive tender assessment and (2) disagreement over who carries the risk of new product failure. The four key solutions uncovered were: 1) pre-project product certification; 2) past innovation performance assessment; 3) earlier involvement of product suppliers and road asset operators; and 4) performance-based specifications. Additional research is suggested in order to illicit deeper insights into possible solutions to construction innovation obstacles, and should emphasise furthering the theoretical interpretation of empirical phenomena.