446 resultados para Construction industry - Evaluation - Australia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is a crucial component of the Hong Kong economy, and the safety and efficiency of workers are two of its main concerns. The current approach to training workers relies primarily on instilling practice and experience in conventional teacher-apprentice settings on and off site. Both have their limitations however, on-site training is very inefficient and interferes with progress on site, while off-site training provides little opportunity to develop the practical skills and awareness needed through hands-on experience. A more effective way is to train workers in safety awareness and efficient working by current novel information technologies. This paper describes a new and innovative prototype system – the Proactive Construction Management System (PCMS) – to train precast installation workers to be highly productive while being fully aware of the hazards involved. PCMS uses Chirp-Spread-Spectrum-based (CSS) real-time location technology and Unity3D-based data visualisation technology to track construction resources (people, equipment, materials, etc.) and provide real-time feedback and post-event visualisation analysis in a training environment. A trial of a precast facade installation on a real site demonstrates the benefits gained by PCMS in comparison with equivalent training using conventional methods. It is concluded that, although the study is based on specific industrial conditions found in Hong Kong construction projects, PCMS may well attract wider interest and use in future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Due to the increasing recognition of global climate change, the building and construction industry is under pressure to reduce carbon emissions. A central issue in striving towards reduced carbon emissions is the need for a practicable and meaningful yardstick for assessing and communicating greenhouse gas (GHG) results. ISO 14067 was published by the International Organization for Standardization in May 2013. By providing specific requirements in the life cycle assessment (LCA) approach, the standard clarifies the GHG assessment in the aspects of choosing system boundaries and simulating use and end-of-life phases when quantifying carbon footprint of products (CFPs). More importantly, the standard, for the first time, provides step-to-step guidance and standardized template for communicating CFPs in the form of CFP external communication report, CFP performance tracking report, CFP declaration and CFP label. ISO 14067 therefore makes a valuable contribution to GHG quantification and transparent communication and comparison of CFPs. In addition, as cradle-to-grave should be used as the system boundary if use and end-of-life phases can be simulated, ISO 14067 will hopefully promote the development and implementation of simulation technologies, with Building Information Modelling (BIM) in particular, in the building and construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Australia’s governance arrangements for NRM have evolved considerably over the last thirty years. The impact of changes in governance on NRM planning and delivery requires assessment. We undertake a multi-method program evaluation using adaptive governance principles as an analytical frame and apply this to Queensland to assess the impacts of governance change on NRM planning and governance outcomes. Data to inform our analysis includes: 1) a systematic review of sixteen audits/evaluations of Australian NRM over a fifteen-year period; 2) a review of Queensland’s first generation NRM Plans; and 3) outputs from a Queensland workshop on NRM planning. NRM has progressed from a bottom-up grassroots movement into a collaborative regional NRM model that has been centralised by the Australian Government. We found that while some adaptive governance challenges have been addressed, others remained unresolved. Results show that collaboration and elements of multi-level governance under the regional model were positive moves, but also that NRM arrangements contained structural deficiencies across multiple governance levels in relation to public involvement in decision-making and knowledge production for problem responsiveness. These problems for adaptive governance have been exacerbated since 2008. We conclude that the adaptive governance framework for NRM needs urgent attention so that important environmental management problems can be addressed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Having a clear project definition is crucial for successful construction projects. It affects design quality, project communication between stakeholders and final project performance in terms of cost, schedule and quality. This study examines the relationship between project definition and final project performance through a structural equation model comprising 4 latent constructs and 6 path hypotheses using data from a questionnaire survey of 120 general contractors in the Malaysian construction industry. The results show that in the study population, all three items impact the project performance, but the link between design quality and project performance is indirect. Instead, the clarity of project definition affects project performance indirectly through design quality and project communication and design quality affects project performance indirectly through project communication. The primary contribution is to provide quantitative confirmation of the more general statements made in the literature from around the world and therefore adds to and consolidates existing knowledge. Practical implications derived from the finding are also proposed for various project stakeholders. Furthermore, as lack of the clarity of project definition is a very common occurrence in construction projects globally, these findings have important ramifications for all construction projects in expanding and clarifying existing knowledge on what is needed for the successful delivery of construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As the social environment begins to create more awareness in the area of conserving the natural environment, a new generation of building has emerged. A trend of constructing buildings that minimise impacts on the environment has been established in the construction industry. Therefore, suitable project management practices have been adopted to efficiently manage the construction of these green buildings. This study aims at investigating practices of project management in traditional and accredited green construction projects, with the purpose of discovering if Green Project Management (GPM) practices can be applied to traditional projects to achieve more successful outcomes. The process of GPM contains what applied to traditional projects, could possibly result in benefits in terms of budget control and constructability. Currently the construction industry has been known to suffer difficulties within these areas; therefore GPM practices could possibly hold a solution to these common problems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article examines the legal responses to protect traditional knowledge of biodiversity in the wake of the Rio Convention on Biological Diversity. It considers the relative merits of the inter-locking regimes of contract law, environmental law, intellectual property law, and native title law. Part 1 considers the natural drug discovery industry in Australia. In particular, it looks at the operations of Amrad, Astra Zeneca R & D, and the Australian Institute of Marine Science. This section examines the key features of the draft regulations proposed under the Environment Protection and Biodiversity Conservation Act 1999 (Cth) - model contracts, informed consent, benefit-sharing, and ministerial discretion. The use of Indigenous Land Use Agreements in the context of access to genetic resources is also explored. Part 2 considers the role played by native title law in dealing with tangible and intangible property interests. The High Court decision in Western Australia v Ward considers the relationship between native title rights and cultural knowledge. The Federal Court case of Neowarra v Western Australia provides an intriguing gloss on this High Court decision. Part 3 looks at whether traditional knowledge of biodiversity can be protected under intellectual property law. It focuses upon reforms such as Senator Aden Ridgeway's proposed amendments to the Plant Breeder's Rights Act 1994 (Cth), and the push to make disclosure of origin a requirement of patent law.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: Internationally, there is a growing concern for developing STEM education to prepare students for a scientifically and technologically advanced society. Despite educational bodies lobbying for an increased focus on STEM, there is limited research on how engineering might be incorporated especially in the elementary school curriculum. A framework of five comprehensive core engineering design processes (problem scoping, idea generation, design and construction, design evaluation, redesign), adapted from the literature on design thinking in young children, served as a basis for the study. We report on a qualitative study of fourth-grade students’ developments in working an aerospace problem, which took place during the first year of a 3-year longitudinal study. Students applied design processes together with their mathematics and science knowledge to the design and redesign of a 3-D model plane. Results: The study shows that through an aerospace engineering problem, students could complete initial designs and redesigns of a model plane at varying levels of sophistication. Three levels of increasing sophistication in students’ sketches were identified in their designs and redesigns. The second level was the most prevalent involving drawings or templates of planes together with an indication of how to fold the materials as well as measurements linked to the plane’s construction. The third level incorporated written instructions and calculations. Students’ engagement with each of the framework’s design processes revealed problem scoping components in their initial designs and redesigns. Furthermore, students’ recommendations for improving their launching techniques revealed an ability to apply their mathematics knowledge in conjunction with their science learning on the forces of flight. Students’ addition of context was evident together with an awareness of constraints and a consideration of what was feasible in their design creation. Interestingly, students’ application of disciplinary knowledge occurred more frequently in the last two phases of the engineering framework (i.e., design evaluation and redesign), highlighting the need for students to reach these final phases to enable the science and mathematics ideas to emerge. Conclusions: The study supports research indicating young learners’ potential for early engineering. Students can engage in design and redesign processes, applying their STEM disciplinary knowledge in doing so. An appropriate balance is needed between teacher input of new concepts and students’ application of this learning in ways they choose. For example, scaffolding by the teacher about how to improve designs for increased detail could be included in subsequent experiences. Such input could enhance students’ application of STEM disciplinary knowledge in the redesign process. We offer our framework of design processes for younger learners as one way to approach early engineering education with respect to both the creation of rich problem experiences and the analysis of their learning.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR) and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., ‘best value with discussion’ and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show ‘best value with discussion’ to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is a knowledge-based industry where various actors with diverse expertise create unique information within different phases of a project. The industry has been criticized by researchers and practitioners as being unable to apply newly created knowledge effectively to innovate. The fragmented nature of the construction industry reduces the opportunity of project participants to learn from each other and absorb knowledge. Building Information Modelling (BIM), referring to digital representations of constructed facilities, is a promising technological advance that has been proposed to assist in the sharing of knowledge and creation of linkages between firms. Previous studies have mainly focused on the technical attributes of BIM and there is little evidence on its capability to enhance learning in construction firms. This conceptual paper identifies six ‘functional attributes’ of BIM that act as triggers to stimulate learning: (1) comprehensibility; (2) predictability; (3) accuracy; (4) transparency; (5) mutual understanding and; (6) integration.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cost estimating is a key task within Quantity Surveyors’ (QS) offices. Provision of an accurate estimate is vital to ensure that the objectives of the client are met by staying within the client’s budget. Building Information Modelling (BIM) is an evolving technology that has gained attention in the construction industries all over the world. Benefits from the use of BIM include cost and time savings if the processes used by the procurement team are adapted to maximise the benefits of BIM. BIM can be used by QSs to automate aspects of quantity take-off and the preparation of estimates, decreasing turnaround time and assist in controlling errors and inaccuracies. The Malaysian government has decided to require the use of BIM for its projects beginning from 2016. However, slow uptake is reported in the use of BIM both within companies and to support collaboration within the Malaysian industry. It has been recommended that QSs to start evaluating the impact of BIM on their practices. This paper reviews the perspectives of QSs in Malaysia towards the use of BIM to achieve more dependable results in their cost estimating practice. The objectives of this paper include identifying strategies in improving practice and potential adoption drivers that lead QSs to BIM usage in their construction projects. From the expert interviews, it was found out that, despite still using traditional methods and not practising BIM, the interviewees still acquire limited knowledge related to BIM. There are some drivers that potentially motivate them to employ BIM in their practices. These include client demands, innovation in traditional methods, speed in estimating costs, reduced time and costs, improvement in practices and self-awareness, efficiency in projects, and competition from other companies. The findings of this paper identify the potential drivers in encouraging Malaysian Quantity Surveyors to exploit BIM in their construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

- Problem Climate change is affecting the world in numerous ways such as increased temperatures, sea level rise, and increased droughts and floods. Governments worldwide, especially in the most vulnerable countries, are urged to seek better solutions for sustainable development. The construction industry and buildings have enormous impacts on humans and the environment, meaning green building must be one of the solutions. Government involvement is widely considered as one of the essential and most effective ways to promote green building and drive the construction market towards sustainability. This paper will review green building policy of the Pacific-Rim countries that are most vulnerable to climate change according to the recent Standard and Poor’s ranking, including: Cambodia, Vietnam, Fiji, Philippines, Papua New Guinea and Indonesia. Methodology: This paper will review policy related publications including journal and conference papers, portal websites of governments, legislation documents and reports of international organisations. It will focus on the policies and governmental instruments that support the adoption of green building practices. - Findings All six governments have launched climate change adaptation policies, showing a great concern regarding the damages caused by the phenomenon. All countries except Papua New Guinea have promulgated energy efficiency policy and programs which indirectly promote the adoption of green building practices. The comparison study shows that Philippines and Indonesia motivate the adoption of renewable energy generation, energy efficiency and green building through either financial or advocacy instruments, while other four countries tend to implement regulatory tools to mandate energy conservation. Through comparison, Cambodia and Vietnam – the two countries providing vision to develop green building - can learn from Philippines and Indonesia’s policy and instruments. - Research limitations Language differences between the countries and limit of formal sources may pose difficulties in searching for information. While much English language literature exists, sources from Cambodia, Philippines and Indonesia are less accessible. - Takeaway for practice As the paper provides more understanding about the supportive policy of those countries, it will introduce more opportunities for green property developers to invest in construction markets of those Pacific-Rim countries. - Originality There is little research reviewing green building supportive policies of developing and less-wealthy countries that are forecasted to be most vulnerable and most impacted by climate change. The originality of this paper lies in its investigation on how those countries intend to respond to this phenomenon and whether and to what extent they support the green building market by using policy tools.