185 resultados para cost analysis


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Reliable budget/cost estimates for road maintenance and rehabilitation are subjected to uncertainties and variability in road asset condition and characteristics of road users. The CRC CI research project 2003-029-C ‘Maintenance Cost Prediction for Road’ developed a method for assessing variation and reliability in budget/cost estimates for road maintenance and rehabilitation. The method is based on probability-based reliable theory and statistical method. The next stage of the current project is to apply the developed method to predict maintenance/rehabilitation budgets/costs of large networks for strategic investment. The first task is to assess the variability of road data. This report presents initial results of the analysis in assessing the variability of road data. A case study of the analysis for dry non reactive soil is presented to demonstrate the concept in analysing the variability of road data for large road networks. In assessing the variability of road data, large road networks were categorised into categories with common characteristics according to soil and climatic conditions, pavement conditions, pavement types, surface types and annual average daily traffic. The probability distributions, statistical means, and standard deviation values of asset conditions and annual average daily traffic for each type were quantified. The probability distributions and the statistical information obtained in this analysis will be used to asset the variation and reliability in budget/cost estimates in later stage. Generally, we usually used mean values of asset data of each category as input values for investment analysis. The variability of asset data in each category is not taken into account. This analysis method demonstrated that it can be used for practical application taking into account the variability of road data in analysing large road networks for maintenance/rehabilitation investment analysis.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Choi et al. recently proposed an efficient RFID authentication protocol for a ubiquitous computing environment, OHLCAP(One-Way Hash based Low-Cost Authentication Protocol). However, this paper reveals that the protocol has several security weaknesses : 1) traceability based on the leakage of counter information, 2) vulnerability to an impersonation attack by maliciously updating a random number, and 3) traceability based on a physically-attacked tag. Finally, a security enhanced group-based authentication protocol is presented.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In 1999 Richards compared the accuracy of commercially available motion capture systems commonly used in biomechanics. Richards identified that in static tests the optical motion capture systems generally produced RMS errors of less than 1.0 mm. During dynamic tests, the RMS error increased to up to 4.2 mm in some systems. In the last 12 years motion capture systems have continued to evolve and now include high-resolution CCD or CMOS image sensors, wireless communication, and high full frame sampling frequencies. In addition to hardware advances, there have also been a number of advances in software, which includes improved calibration and tracking algorithms, real time data streaming, and the introduction of the c3d standard. These advances have allowed the system manufactures to maintain a high retail price in the name of advancement. In areas such as gait analysis and ergonomics many of the advanced features such as high resolution image sensors and high sampling frequencies are not required due to the nature of the task often investigated. Recently Natural Point introduced low cost cameras, which on face value appear to be suitable as at very least a high quality teaching tool in biomechanics and possibly even a research tool when coupled with the correct calibration and tracking software. The aim of the study was therefore to compare both the linear accuracy and quality of angular kinematics from a typical high end motion capture system and a low cost system during a simple task.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The position of housing demand and supply is not consistent. The Australian situation counters the experience demonstrated in many other parts of the world in the aftermath of the Global Financial Crisis, with residential housing prices proving particularly resilient. A seemingly inexorable housing demand remains a critical issue affecting the socio-economic landscape. Underpinned by high levels of population growth fuelled by immigration, and further buoyed by sustained historically low interest rates, increasing income levels, and increased government assistance for first home buyers, this strong housing demand level ensures problems related to housing affordability continue almost unabated. A significant, but less visible factor impacting housing affordability relates to holding costs. Although only one contributor in the housing affordability matrix, the nature and extent of holding cost impact requires elucidation: for example, the computation and methodology behind the calculation of holding costs varies widely - and in some instances completely ignored. In addition, ambiguity exists in terms of the inclusion of various elements that comprise holding costs, thereby affecting the assessment of their relative contribution. Such anomalies may be explained by considering that assessment is conducted over time in an ever-changing environment. A strong relationship with opportunity cost - in turn dependant inter alia upon prevailing inflation and / or interest rates - adds further complexity. By extending research in the general area of housing affordability, this thesis seeks to provide a detailed investigation of those elements related to holding costs specifically in the context of midsized (i.e. between 15-200 lots) greenfield residential property developments in South East Queensland. With the dimensions of holding costs and their influence over housing affordability determined, the null hypothesis H0 that holding costs are not passed on can be addressed. Arriving at these conclusions involves the development of robust economic and econometric models which seek to clarify the componentry impacts of holding cost elements. An explanatory sequential design research methodology has been adopted, whereby the compilation and analysis of quantitative data and the development of an economic model is informed by the subsequent collection and analysis of primarily qualitative data derived from surveying development related organisations. Ultimately, there are significant policy implications in relation to the framework used in Australian jurisdictions that promote, retain, or otherwise maximise, the opportunities for affordable housing.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The objective of the study was to assess, from a health service perspective, whether a systematic program to modify kidney and cardiovascular disease reduced the costs of treating end-stage kidney failure. The participants in the study were 1,800 aboriginal adults with hypertension, diabetes with microalbuminuria or overt albuminuria, and overt albuminuria, living on two islands in the Northern Territory of Australia during 1995 to 2000. Perindopril was the primary treatment agent, and other medications were also used to control blood pressure. Control of glucose and lipid levels were attempted, and health education was offered. Evaluation of program resource use and costs for follow-up periods was done at 3 and 4.7 years. On an intention-to-treat basis, the number of dialysis starts and dialysis-years avoided were estimated by comparing the fate of the treatment group with that of historical control subjects, matched for disease severity, who were followed in the before the treatment program began. For the first three years, an estimated 11.6 person-years of dialysis were avoided, and over 4.7 years, 27.7 person-years of dialysis were avoided. The net cost of the program was 1,210 dollars more per person per year than status quo care, and dialyses avoided gave net savings of 1.0 million dollars at 3 years and 3.4 million dollars at 4.6 years. The treatment program provided significant health benefit and impressive cost savings in dialysis avoided.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Developers and policy makers are consistently at odds over the debate as to whether impact fees increase house prices. This debate continues despite the extensive body of theoretical and empirical international literature that discusses the passing on to home buyers of impact fees, and the corresponding increase to housing prices. In attempting to quantify this impact, over a dozen empirical studies have been carried out in the US and Canada since the 1980’s. However the methodologies used vary greatly, as do the results. Despite similar infrastructure funding policies in numerous developed countries, no such empirical works exist outside of the US/Canada. The purpose of this research is to analyse the existing econometric models in order to identify, compare and contrast the theoretical bases, methodologies, key assumptions and findings of each. This research will assist in identifying if further model development is required and/or whether any of these models have external validity and are readily transferable outside of the US. The findings conclude that there is very little explicit rationale behind the various model selections and that significant model deficiencies appear still to exist.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Background: Surgical site infection (SSI) is associated with substantial costs for health services, reduced quality of life, and functional outcomes. The aim of this study was to evaluate the cost-effectiveness of strategies claiming to reduce the risk of SSI in hip arthroplasty in Australia. Methods: Baseline use of antibiotic prophylaxis (AP) was compared with no antibiotic prophylaxis (no AP), antibiotic-impregnated cement (AP þ ABC), and laminar air operating rooms (AP þ LOR). A Markov model was used to simulate long-term health and cost outcomes of a hypothetical cohort of 30,000 total hip arthroplasty patients from a health services perspective. Model parameters were informed by the best available evidence. Uncertainty was explored in probabilistic sensitivity and scenario analyses. Results: Stopping the routine use of AP resulted in over Australian dollars (AUD) $1.5 million extra costs and a loss of 163 quality-adjusted life years (QALYs). Using antibiotic cement in addition to AP (AP þ ABC)generated an extra 32 QALYs while saving over AUD $123,000. The use of laminar air operating rooms combined with routine AP (AP þ LOR) resulted in an AUD $4.59 million cost increase and 127 QALYs lost compared with the baseline comparator. Conclusion: Preventing deep SSI with antibiotic prophylaxis and antibiotic-impregnated cement has shown to improve health outcomes among hospitalized patients, save lives, and enhance resource allocation. Based on this evidence, the use of laminar air operating rooms is not recommended.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Action Lecture program is an innovative teaching method run in some nursery and primary schools in Paris and designed to improve pupils’ literacy. We report the results of an evaluation of this program. We describe the experimental protocol that was built to estimate the program’s impact on several types of indicators. Data were processed following a Differences-in-Differences (DID) method. Then we use the estimation of the impact on academic achievement to conduct a cost-effectiveness analysis and take a reduction of the class size program as a benchmark. The results are positive for the Action Lecture program.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Between 2001 and 2005, the US airline industry faced financial turmoil while the European airline industry entered a period of substantive deregulation. Consequently, this opened up opportunities for low-cost carriers to become more competitive in the market. To assess airline performance and identify the sources of efficiency in the immediate aftermath of these events, we employ a bootstrap data envelopment analysis truncated regression approach. The results suggest that at the time the mainstream airlines needed to significantly reorganize and rescale their operations to remain competitive. In the second-stage analysis, the results indicate that private ownership, status as a low-cost carrier, and improvements in weight load contributed to better organizational efficiency.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Temporary Traffic Control Plans (TCP’s), which provide construction phasing to maintain traffic during construction operations, are integral component of highway construction project design. Using the initial design, designers develop estimated quantities for the required TCP devices that become the basis for bids submitted by highway contractors. However, actual as-built quantities are often significantly different from the engineer’s original estimate. The total cost of TCP phasing on highway construction projects amounts to 6–10% of the total construction cost. Variations between engineer estimated quantities and final quantities contribute to reduced cost control, increased chances of cost related litigations, and bid rankings and selection. Statistical analyses of over 2000 highway construction projects were performed to determine the sources of variation, which later were used as the basis of development for an automated-hybrid prediction model that uses multiple regressions and heuristic rules to provide accurate TCP quantities and costs. The predictive accuracy of the model developed was demonstrated through several case studies.