35 resultados para Social Development
Resumo:
This chapter analyses the copyright law framework needed to ensure open access to outputs of the Australian academic and research sector such as journal articles and theses. It overviews the new knowledge landscape, the principles of copyright law, the concept of open access to knowledge, the recently developed open content models of copyright licensing and the challenges faced in providing greater access to knowledge and research outputs.
Resumo:
Corruption has been identified as the greatest obstacle to economic and social development. Public construction projects, in particular, face high corruption risk as public construction sector has been consecutively deemed as the most corrupt one. Despite considerable efforts have been undertaken to measure corruption at a nation level, few focus on the measurement of corruption in construction projects. This paper develops a fuzzy measurement model for the potential corruption in public construction projects in China. Through semi-structured interviews with 14 experts, followed by a questionnaire survey with 188 respondents, 24 measurement items of corruption were identified and further categorized into five constructs. The fuzzy set theory was then adopted to quantify each measurement item, construct and the overall corruption level. This model can facilitate in evaluating, revealing and monitoring corruption in public construction projects. Although this study focuses on measuring corruption in public construction projects in China, similar research methods can be applied in other countries around the world and thus contribute to the global body of knowledge of corruption.
Resumo:
Pakistan is widely known and appreciated in the world for its history, Islamic culture and norms. Since the creation of Pakistan, it inherited poverty in its roots. There are many reasons for poverty but one lies on the shoulder of women who are 50% of the total population of Pakistan. On the apex of it, women do not take part in the development of Pakistan because when they step out of their homes, they suffer a lot of problems. These problems are a hurdle in their active participation in development .Government has tried to create an environment for those women, who suffer different problems. Harassment of women at work place is one of those problems which discourage women in taking active part in economic and social development of society. Women Activists, from the last decade, were working for the protection of woman’s right at workplace and they succeeded in formulation of Harassment Act 2010. Since law is ineffective without its proper mechanism of implementation, steps should be taken for its proper implementation mechanism. This article aims to provide information about the provisions of law, related to the harassment of women at workplace with an attempt to explore the effectiveness of its implementation. The study was conducted in twin cities of Pakistan, Islamabad and Rawalpindi. Interviews were conducted with the employees and employers of organizations, educational institutions, women activists, NGOs workers, lawyers, judges and some law enforcement officers. Group discussions were also held with teachers, students of Human rights and religious personalities. This report focuses on the implementation mechanism of new legislation in Pakistan. It also highlights some important facts related to its enforcement.
Resumo:
One hundred and seven children with faecal incontinence were evaluated and managed over a 3 year period by a multidisciplinary team. After initial clinical assessment, evaluation of defaecatory mechanisms (using a balloon model) and assessment of personal-social development and self-concept were undertaken. Management was based on initial bowel evacuation, short-term laxatives, and habit training involving systematic use of positive reinforcement; 69 children received biofeedback conditioning. Idiopathic megacolon with constipation and soiling was the most common finding (98 cases). Other diagnoses included previously undiagnosed neurogenic bowel (three cases), post-surgical anal anomalies (four cases), and psychogenic encopresis (two cases). Idiopathic megacolon was characterized by decreased rectal sensation, increased threshold for external sphincter relaxation and an inability to evacuate. Faecal incontinence was associated with an undesirably low social self-concept (70% of the 40 evaluated), but was not related to a delay in development (mean general developmental quotient = 105 ± 8, for the 35 tested). Family psychopathology warranting referral for family therapy was found in 14 children (13%). The management programme yielded a short-term (3 months) cure rate of 68% and a long-term (12 months) cure rate of 90%, with 10% having continued soiling which varied from occasional to several incidents/week. No significant improvement in self-concept was observed overall, although marked improvements were observed in some children. We conclude that disordered defaecatory dynamics are a major determinant of faecal incontinence in children. Undesirably low social self-concepts but normal developmental ability accompany this condition. Management is facilitated by a multidisciplinary approach, acknowledging the role of both behavioural and physiological components of the problem. This approach is effective in eradicating soiling in the majority of cases, comparing favourably with other published data.
Resumo:
The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.