33 resultados para Revolutionary period
Resumo:
The spectral energy associated with the carrier and sidebands of naturally sampled carrier based PWM can be spread by randomising the carrier (switch) half-period Tc = 1/2fc. So long as the switch duty cycle each period still correctly reflects the value of the modulating fundamental waveform as sampled during that switch period, then the fundamental component will remain undistorted. Natural sampling will ensure this occurs. Carrier based PWM can be extended to (m+1) level multilevel converter waveform generation by creating m triangular carriers, each with an equal 2*pi/m phase displacement. Alternatively the carrier disposition strategy calls for m amplitude displaced triangular carriers, each of amplitude 1/m and frequency mfc. Randomising these carrier sub-periods T0> = 1/2mfc is shown to generate (m+ 1) level PWM waveforms where the first (m-1) carrier groups are cancelled, while the remaining carrier and sidebands at multiples of mfc are spectrally spread. Numerous five level simulation and experimentally gathered randomised PWM waveforms are presented, showing the effects of the variation of the degree of randomisation, modulation depth and pulse number.
Resumo:
The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.
Resumo:
The postpartum period is typically a time of increased sleepiness, however little research has investigated mothers' sleepiness whilst driving during this period. The research presented in this thesis details three studies systematically designed to assess postpartum mothers' sleepiness and driving, followed by the utilisation of this information in the development of an information-based program designed to convey pertinent evidence-based information about postpartum sleepiness, sleep, and sleepy driving.