169 resultados para Redistricting problems


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In an age where financial transactions are conducted worldwide and mobility of citizens throughout the world is common, lawyers seeking to serve Bankruptcy Notices and Creditor’s Petitions encounter many problems. To assist lawyers in overcoming some of the service problems that are arising as a result of this changing world, a number of recent cases are considered that highlight a number of issues, including American Express Australia Limited v Michaels [2010] FMCA 103, Deputy Commissioner of Taxation v Barnes (2008) 70 ATR 776; [2008] FMCA 7, Battenberg v Restom & Ors (2005) 223 ALR 692; upheld by the Full Federal Court in Battenberg v Restrom and Ors (2006) 149 FCR 128 at 133; [2006] FCAFC 20 and Envee Energy Pty Ltd (In Liquidation) v Stockford [2007] FMCA 1426. While the fact situation of every bankruptcy case will differ, recent decisions may assist lawyers in dealing effectively with bankruptcy matters in these times of transition. Lawyers can facilitate completion of the litigious process within the relevant legislative framework in order to satisfy their responsibility to clients and to the Court by considering this case law.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A point interpolation method with locally smoothed strain field (PIM-LS2) is developed for mechanics problems using a triangular background mesh. In the PIM-LS2, the strain within each sub-cell of a nodal domain is assumed to be the average strain over the adjacent sub-cells of the neighboring element sharing the same field node. We prove theoretically that the energy norm of the smoothed strain field in PIM-LS2 is equivalent to that of the compatible strain field, and then prove that the solution of the PIM- LS2 converges to the exact solution of the original strong form. Furthermore, the softening effects of PIM-LS2 to system and the effects of the number of sub-cells that participated in the smoothing operation on the convergence of PIM-LS2 are investigated. Intensive numerical studies verify the convergence, softening effects and bound properties of the PIM-LS2, and show that the very ‘‘tight’’ lower and upper bound solutions can be obtained using PIM-LS2.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Presentation about internet based interventions for depression, substance and alcohol abuse.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Relatively little information has been reported about foot and ankle problems experienced by nurses, despite anecdotal evidence which suggests they are common ailments. The purpose of this study was to improve knowledge about the prevalence of foot and ankle musculoskeletal disorders (MSDs) and to explore relationships between these MSDs and proposed risk factors. A review of the literature relating to work-related MSDs, MSDs in nursing, foot and lower-limb MSDs, screening for work-related MSDs, foot discomfort, footwear and the prevalence of foot problems in the community was undertaken. Based on the review, theoretical risk factors were proposed that pertained to the individual characteristics of the nurses, their work activity or their work environment. Three studies were then undertaken. A cross-sectional survey of 304 nurses, working in a large tertiary paediatric hospital, established the prevalence of foot and ankle MSDs. The survey collected information about self-reported risk factors of interest. The second study involved the clinical examination of a subgroup of 40 nurses, to examine changes in body discomfort, foot discomfort and postural sway over the course of a single work shift. Objective measurements of additional risk factors, such as individual foot posture (arch index) and the hardness of shoe midsoles, were performed. A final study was used to confirm the test-retest reliability of important aspects of the survey and key clinical measurements. Foot and ankle problems were the most common MSDs experienced by nurses in the preceding seven days (42.7% of nurses). They were the second most common MSDs to cause disability in the last 12 months (17.4% of nurses), and the third most common MSDs experienced by nurses in the last 12 months (54% of nurses). Substantial foot discomfort (Visual Analogue Scale (VAS) score of 50mm or more) was experienced by 48.5% of nurses at sometime in the last 12 months. Individual risk factors, such as obesity and the number of self-reported foot conditions (e.g., callouses, curled toes, flat feet) were strongly associated with the likelihood of experiencing foot problems in the last seven days or during the last 12 months. These risk factors showed consistent associations with disabling foot conditions and substantial foot discomfort. Some of these associations were dependent upon work-related risk factors, such as the location within the hospital and the average hours worked per week. Working in the intensive care unit was associated with higher odds of experiencing foot problems within the last seven days, foot problems in the last 12 months and foot problems that impaired activity in the last 12 months. Changes in foot discomfort experienced within a day, showed large individual variability. Fifteen of the forty nurses experienced moderate/substantial foot discomfort at the end of their shift (VAS 25+mm). Analysis of the association between risk factors and moderate/substantial foot discomfort revealed that foot discomfort was less likely for nurses who were older, had greater BMI or had lower foot arches, as indicated by higher arch index scores. The nurses’ postural sway decreased over the course of the work shift, suggesting improved body balance by the end of the day. These findings were unexpected. Further clinical studies examining individual nurses on several work shifts are needed to confirm these results, particularly due to the small sample size and the single measurement occasion. There are more than 280,000 nurses registered to practice in Australia. The nursing workforce is ageing and the prevalence of foot problems will increase. If the prevalence estimates from this study are extrapolated to the profession generally, more than 70,000 hospital nurses have experienced substantial foot discomfort and 25-30,000 hospital nurses have been limited in their activity due to foot problems during the last 12 months. Nurses with underlying foot conditions were more likely to report having foot problems at work. Strategies to prevent or manage foot conditions exist and they should be disseminated to nurses. Obesity is a significant risk factor for foot and ankle MSDs and these nurses may need particular assistance to manage foot problems. The risk of foot problems for particular groups of nurses, e.g. obese nurses, may vary depending upon the location within the hospital. Further research is needed to confirm the findings of this study. Similar studies should be conducted in other occupational groups that require workers to stand for prolonged periods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.