33 resultados para PIT VIPER


Relevância:

10.00% 10.00%

Publicador:

Resumo:

In open-cut strip mining, waste material is placed in-pit to minimise operational mine costs. Slope failures in these spoil piles pose a significant safety risk to personnel, along with a financial risk from loss of equipment and scheduling delays. It has been observed that most spoil pile failures occur when the pit has been previously filled with water and then subsequently dewatered. The failures are often initiated at the base of spoil piles where the material can undergo significant slaking (disintegration) over time due to overburden pressure and water saturation. It is important to understand how the mechanical properties of base spoil material are affected by slaking when designing safe spoil pile slope angles, heights, and dewatering rates. In this study, fresh spoil material collected from a coal mine in Brown Basin Coalfield of Queensland, Australia was subjected to high overburden pressure (0 – 900 kPa) under saturated condition and maintained over a period of time (0 – 6 months) allowing the material to slake. To create the above conditions, laboratory designed pressure chambers were used. Once a spoil sample was slaked under certain overburden pressure over a period of time, it was tested for classification, permeability, and strength properties. Results of this testing program suggested that the slaking of saturated coal mine spoil increase with overburden pressure and the time duration over which the overburden pressure was maintained. Further, it was observed that shear strength and permeability of spoil decreased with increase in spoil slaking.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper proposes a new multi-stage mine production timetabling (MMPT) model to optimise open-pit mine production operations including drilling, blasting and excavating under real-time mining constraints. The MMPT problem is formulated as a mixed integer programming model and can be optimally solved for small-size MMPT instances by IBM ILOG-CPLEX. Due to NP-hardness, an improved shifting-bottleneck-procedure algorithm based on the extended disjunctive graph is developed to solve large-size MMPT instances in an effective and efficient way. Extensive computational experiments are presented to validate the proposed algorithm that is able to efficiently obtain the near-optimal operational timetable of mining equipment units. The advantages are indicated by sensitivity analysis under various real-life scenarios. The proposed MMPT methodology is promising to be implemented as a tool for mining industry because it is straightforwardly modelled as a standard scheduling model, efficiently solved by the heuristic algorithm, and flexibly expanded by adopting additional industrial constraints.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Objective: To nationally trial the Primary Care Practice Improvement Tool (PC-PIT), an organisational performance improvement tool previously co-created with Australian primary care practices to increase their focus on relevant quality improvement (QI) activities. Design: The study was conducted from March to December 2015 with volunteer general practices from a range of Australian primary care settings. We used a mixed-methods approach in two parts. Part 1 involved staff in Australian primary care practices assessing how they perceived their practice met (or did not meet) each of the 13 PC-PIT elements of high-performing practices, using a 1–5 Likert scale. In Part 2, two external raters conducted an independent practice visit to independently and objectively assess the subjective practice assessment from Part 1 against objective indicators for the 13 elements, using the same 1–5 Likert scale. Concordance between the raters was determined by comparing their ratings. In-depth interviews conducted during the independent practice visits explored practice managers’ experiences and perceived support and resource needs to undertake organisational improvement in practice. Results: Data were available for 34 general practices participating in Part 1. For Part 2, independent practice visits and the inter-rater comparison were conducted for a purposeful sample of 19 of the 34 practices. Overall concordance between the two raters for each of the assessed elements was excellent. Three practice types across a continuum of higher- to lower-scoring practices were identified, with each using the PC-PIT in a unique way. During the in-depth interviews, practice managers identified benefits of having additional QI tools that relate to the PC-PIT elements. Conclusions: The PC-PIT is an organisational performance tool that is acceptable, valid and relevant to our range of partners and the end users (general practices). Work is continuing with our partners and end users to embed the PC-PIT in existing organisational improvement programs.