446 resultados para Office management.
Resumo:
The concept of asset management is not a new but an evolving idea that has been attracting attention of many organisations operating and/or owning some kind of infrastructure assets. The term asset management have been used widely with fundamental differences in interpretation and usage. Regardless of the context of the usage of the term, asset management implies the process of optimising return by scrutinising performance and making key strategic decisions throughout all phases of an assets lifecycle (Sarfi and Tao, 2004). Hence, asset management is a philosophy and discipline through which organisations are enabled to more effectively deploy their resources to provide higher levels of customer service and reliability while balancing financial objectives. In Australia, asset management made its way into the public works in 1993 when the Australian Accounting Standard Board issued the Australian Accounting Standard 27 – AAS27. Standard AAS27 required government agencies to capitalise and depreciate assets rather than expense them against earnings. This development has indirectly forced organisations managing infrastructure assets to consider the useful life and cost effectiveness of asset investments. The Australian State Treasuries and the Australian National Audit Office was the first organisation to formalise the concepts and principles of asset management in Australia in which they defined asset management as “ a systematic, structured process covering the whole life of an asset”(Australian National Audit Office, 1996). This initiative led other Government bodies and industry sectors to develop, refine and apply the concept of asset management in the management of their respective infrastructure assets. Hence, it can be argued that the concept of asset management has emerged as a separate and recognised field of management during the late 1990s. In comparison to other disciplines such as construction, facilities, maintenance, project management, economics, finance, to name a few, asset management is a relatively new discipline and is clearly a contemporary topic. The primary contributors to the literature in asset management are largely government organisations and industry practitioners. These contributions take the form of guidelines and reports on the best practice of asset management. More recently, some of these best practices have been made to become a standard such as the PAS 55 (IAM, 2004, IAM, 2008b) in UK. As such, current literature in this field tends to lack well-grounded theories. To-date, while receiving relatively more interest and attention from empirical researchers, the advancement of this field, particularly in terms of the volume of academic and theoretical development is at best moderate. A plausible reason for the lack of advancement is that many researchers and practitioners are still unaware of, or unimpressed by, the contribution that asset management can make to the performance of infrastructure asset. This paper seeks to explore the practices of organisations that manage infrastructure assets to develop a framework of strategic infrastructure asset management processes. It will begin by examining the development of asset management. This is followed by the discussion on the method to be adopted for this paper. Next, is the discussion of the result form case studies. It first describes the goals of infrastructure asset management and how they can support the broader business goals. Following this, a set of core processes that can support the achievement of business goals are provided. These core processes are synthesised based on the practices of asset managers in the case study organisations.
Resumo:
While raised floors as a building component has been around since the 70's, its application in terms of a holistic system in the fit-out of commercial office buildings has not been fully embraced due to some inherent problems and negative perceptions of the stakeholders involved. Today, the new generation of raised floor systems(RFS) offers a suite of innovative and integrated products and solutions, and as such are not only suitable for the changing office space requirements, but also capable of meeting tbe smart and sustainable challenges, which are becoming the prerequisite in the refurbishment of existing buildings. As there has been a prediction for continued growth in refurbishment projects in major cities around the globe, RFS as an alternative methodology warrants new examination and highlight. This paper introduces research recently completed in Australia that provided a holistic approach to the application of RFS enabled by intelligent building technologies, and examined key issues of project development when refurbishing commercial office buildings. It focuses on the constructability of RFS, and how it will respond to smart feature requirements in buildings while extending service life, meeting new organisational change and workplace health needs for applications in today's office environment. It also introduces key project procurement issues and the integrated decision support when dealing with the refurbishment of office buildings. The paper recommends procurement strategies as well as the justification of adopting the RFS technology in the Australian office building sector. Given the current economic downturn, refitting as opposed to new build .projects will come onto the spotlight. This paper will provide valuable information for building owners and developers alike when contemplating the retrofit of office buildings.
Resumo:
Purpose - This paper seeks to examine the complex relationships between urban planning, infrastructure management, sustainable urban development, and to illustrate why there is an urgent need for local governments to develop a robust planning support system which integrates with advance urban computer modelling tools to facilitate better infrastructure management and improve knowledge sharing between the community, urban planners, engineers and decision makers. Design/methodology/approach - The methods used in this paper includes literature review and practical project case observations. Originality/value - This paper provides an insight of how the Brisbane's planning support system established by Brisbane City Council has significantly improved the effectiveness of urban planning, infrastructure management and community engagement through better knowledge management processes. Practical implications - This paper presents a practical framework for setting up a functional planning support system within local government. The integration of the Brisbane Urban Growth model, Virtual Brisbane and the Brisbane Economic Activity Monitoring (BEAM) database have proven initially successful to provide a dynamic platform to assist elected officials, planners and engineers to understand the limitations of the local environment, its urban systems and the planning implications on a city. With the Brisbane's planning support system, planners and decision makers are able to provide better planning outcomes, policy and infrastructure that adequately address the local needs and achieve sustainable spatial forms.
Resumo:
Introduction Buildings, which account for approximately half of all annual energy and greenhouse gas emissions, are an important target area for any strategy addressing climate change. Whilst new commercial buildings increasingly address sustainability considerations, incorporating green technology in the refurbishment process of older buildings is technically, financially and socially challenging. This research explores the expectations and experiences of commercial office building tenants, whose building was under-going green refurbishment. Methodology Semi-structured in-depth interviews with seven residents and neighbours of a large case-study building under-going green refurbishment in Melbourne, Australia. Built in 1979, the 7,008m² ‘B’ grade building consists of 11 upper levels of office accommodation, ground floor retail, and a basement area leased as a licensed restaurant. After refurbishment, which included the installation of chilled water pumps, solar water heating, waterless urinals, insulation, disabled toilets, and automatic dimming lights, it was expected that the environmental performance of the building would move from a non-existent zero ABGR (Australian Building Greenhouse Rating) star rating to 3.5 stars, with a 40% reduction in water consumption and 20% reduction in energy consumption. Interviews were transcribed, with responses analysed using a thematic approach, identifying categories, themes and patterns. Results Commercial property tenants are on a journey to sustainability - they are interested and willing to engage in discussions about sustainability initiatives, but the process, costs and benefits need to be clear. Critically, whilst sustainability was an essential and non-negotiable criterion in building selection for government and larger corporate tenants, sustainability was not yet a core business value for smaller organisations – whilst they could see it as an emerging issue, they wanted detailed cost-benefit analyses, pay-back calculations of proposed technologies and, ideally, wished they could trial the technology first-hand in some way. Although extremely interested in learning more, most participants reported relatively minimal knowledge of specific sustainability features, designs or products. In discussions about different sustainable technologies (e.g., waterless urinals, green-rated carpets), participants frequently commented that they knew little about the technology, had not heard of it or were not sure exactly how it worked. Whilst participants viewed sustainable commercial buildings as the future, they had varied expectations about the fate of existing older buildings – most felt that they would have to be retrofitted at some point to meet market expectations and predicted the emergence of a ‘non-sustainability discount’ for residing in a building without sustainable features. Discussion This research offers a beginning point for understanding the difficulty of integrating green technology in older commercial buildings. Tenants currently have limited understandings of technology and potential building performance outcomes, which ultimately could impede the implementation of sustainable initiatives in older buildings. Whilst the commercial property market is interested in learning about sustainability in the built environment, the findings highlight the importance of developing a strong business case, communication and transition plan for implementing sustainability retrofits in existing commercial buildings.
Resumo:
This paper is concerned with investigating existing and potential scope of Dublin Core metadata in Knowledge Management contexts. Modelling knowledge is identified as a conceptual prerequisite in this investigation, principally for the purpose of clarifying scope prior to identifying the range of tasks associated with organising knowledge. A variety of models is presented and relationships between data, information, and knowledge discussed. It is argued that the two most common modes of organisation, hierarchies and networks, influence the effectiveness and flow of knowledge. Practical perspective is provided by reference to implementations and projects providing evidence of how DC metadata is applied in such contexts. A sense-making model is introduced that can be used as a shorthand reference for identifying useful facets of knowledge that might be described using metadata. Discussion is aimed at presenting this model in a way that both validates current applications and points to potential novel applications.
Resumo:
The increasing stock of aging office buildings will see a significant growth in retrofitting projects in Australian capital cities. Stakeholders of refitting works will also need to take on the sustainability challenge and realize tangible outcomes through project delivery. Traditionally, decision making for aged buildings, when facing the alternatives, is typically economically driven and on ad hoc basis. This leads to the tendency to either delay refitting for as long as possible thus causing building conditions to deteriorate, or simply demolish and rebuild with unjust financial burden. The technologies involved are often limited to typical strip-clean and repartition with dry walls and office cubicles. Changing business operational patterns, the efficiency of office space, and the demand on improved workplace environment, will need more innovative and intelligent approaches to refurbishing office buildings. For example, such projects may need to respond to political, social, environmental and financial implications. There is a need for the total consideration of buildings structural assessment, modeling of operating and maintenance costs, new architectural and engineering designs that maximise the utility of the existing structure and resulting productivity improvement, specific construction management procedures including procurement methods, work flow and scheduling and occupational health and safety. Recycling potential and conformance to codes may be other major issues. This paper introduces examples of Australian research projects which provided a more holistic approach to the decision making of refurbishing office space, using appropriate building technologies and products, assessment of residual service life, floor space optimisation and project procurement in order to bring about sustainable outcomes. The paper also discusses a specific case study on critical factors that influence key building components for these projects and issues for integrated decision support when dealing with the refurbishment, and indeed the “re-life”, of office buildings.
Resumo:
The purpose of this paper is to explore the trend of Purpose Built Office (PBO) supply and occupancy in Malaysia. In achieving this, the number of PBO supply by the private sector in the market is compared with the government sector to gain an understanding of the current emerging market for the PBO. There have been limited studies in Malaysia comparing the trend supply and occupancy of PBOs by both sectors. This paper outcome will illustrate the needs for public sector asset management in Malaysia, particularly for PBOs. An analytical framework is developed using time series to measure the level of supply and occupancy of PBO by both sectors, indicating the percentage of government’s PBO compared to the total numbers of PBOs in the market from 2004 to 2010
Resumo:
As global warming entails new conditions for the built environment, the thermal behavior of existing buildings, which were designed based on current weather data, may become unclear and remain a great concern. Through building computer simulation, this paper investigates the sensitivity of different office building zoning to the potential global warming. From the sample office building examined, it is found that compared with the middle and top floors, the ground floor for most cities appears to be most sensitive to the effect of global warming and has the highest tendency to having the overheating problem. From the analysis of the responses of different zone orientations to the outdoor air temperature increase, it is also found that there are widely different responses between different zone orientations, with South or Core zone being most sensitive. With an increased external air temperature, the difference between different floors or different zone orientations will become more significant.
Resumo:
Australia’s domestic income tax legislation and double tax agreements contain transfer pricing rules which are designed to counter the underpayment of tax by businesses engaged in international dealings between related parties. The current legislation and agreements require that related party transactions take place at a value which reflects an arm’s length price, that is, a price which would be charged between unrelated parties. For a host of reasons, it is increasingly difficult for multinational entities to demonstrate that they are transferring goods and services at a price which is reflective of the behaviour of independent parties, thereby making it difficult to demonstrate compliance with the relevant legislation. Further, where an Australian business undertakes cross-border related party transactions there is the risk of an audit by the Australian Tax Office (ATO). If a business wishes to avoid the risk of an audit, and any ensuing penalties, there is one option: an advance pricing arrangement (APA). An APA is an agreement whereby the future transfer pricing methodology to be used to determine the arm’s length price is agreed to by the taxpayer and the relevant tax authority or authorities. The ATO views the APA process as an important part of its international tax strategy and believes that there are complementary benefits provided to both the taxpayer and the ATO. The ATO promotes the APA process on the basis of creating greater certainty for all parties while reducing compliance costs and the risk of audit and penalty. While the ATO regards the APA system as a success, it may be argued that the implementation of such a system is simply a practical solution to an ongoing problem of an inherent failure in both the legislation and ATO interpretation and application of this legislation to provide certainty to the taxpayer. This paper investigates the use of APAs as a solution to the problem of transfer pricing and considers whether they are the success the ATO claims. It is argued that there is no doubt that APAs provide a valuable practical tool for multinational entities facing the challenges of the taxation of global trading under the current transfer pricing regime. It does not, however, provide a long term solution. Rather, the long term solution may be in the form of legislative amendment.
Resumo:
Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.
Resumo:
This important research is published at a critical time in the history of PRINCE2. The world’s project managers are under incredible scrutiny and pressure to ensure their projects deliver quality on time and on budget – and even more so during a world recession. The research shows that PRINCE2 goes a long way to helping them achieve these goals. Although its origins began in the UK, PRINCE2 now has a truly international reach. We are delighted that the Queensland University of Technology (QUT) has undertaken this global, thorough and informative research project. While it highlights the strengths of the methodology itself, the report also looks at the challenges organisations face when using a project management method such as PRINCE2. We’re sure the challenges will resonate with project managers around the world. Securing executive support to champion the adoption of PRINCE2, creating a robust business case and prioritising project governance are key issues that all project managers will grapple with during their career. The research also shows that to be thoroughly effective, organisations need to properly embed PRINCE2 and tailor it to suit their particular circumstances. Many successful organisations have sought the effective help of accredited consulting organisations to assist them in developing a programme to tailor and inculcate this method into their organisational culture. The latest version incorporates a whole chapter on tailoring PRINCE2. We believe that the publication of PRINCE2 Directing Successful Projects using PRINCE2 and the development of further support in the form of materials, mentoring and training for senior executives will be of significant benefit to contemporary project based organisations. The APM Group has already developed a qualification for sponsors in conjunction with the UK’s Home Office to help with this.
Resumo:
In 2003, the Green Building Council of Australia (GBCA) launched their Green Star rating tools for various types of buildings in order to promote green building practice in Australia. Of these, the Green Star-Office Interior rating tool is designed for building owners, tenants and interior designers to assess the environmental impact of an interior fitout. It covers a number of categories, including Management, Indoor Environment Quality, Energy, Transport, Water, Materials, Land Use and Ecology, Emissions, and Innovation. This paper reviews the usage of the Green Star system in Australian office tenancy fitouts and the potential challenges associated with Green Star-Office Interior implementation. This involves the analysis of score sheets of 66 office interior projects across Australia that achieved Green Star certification. The percentage of green star points obtained within each category and sub-categories (credits) for each project are investigated to illustrate the achievement of credits. The results show that Emission-related credits and Innovation related credits are the easiest and most difficult respectively to obtain. It is also found that 6 Green Star office interior projects perform especially better in the categories of Energy and Ecology than 4 and 5 Star projects. The investigation of point frequency in each category provides prospective Green Star applicants with insights into credit achievement for future projects.
Resumo:
Business Process Management (BPM) is accepted globally as an organizational approach to enhance productivity and drive cost efficiencies. Studies confirm a shortage of BPM skilled professionals with limited opportunities to develop the required BPM expertise. This study investigates this gap starting from a critical analysis of BPM courses offered by Australian universities and training institutions. These courses were analyzed and mapped against a leading BPM capability framework to determine how well current BPM education and training offerings in Australia address the core capabilities required by BPM professionals globally. To determine the BPM skill-sets sought by industry, online recruitment advertisements were collated, analyzed, and mapped against this BPM capability framework. The outcomes provide a detailed overview on the alignment of available BPM education/training and industry demand. These insights are useful for BPM professionals and their employers to build awareness of the BPM capabilities required for a BPM mature organization. Universities and other training institutions will benefit from these results by understanding where demand is, where the gaps are, and what other BPM education providers are supplying. This structured comparison method could continue to provide a common ground for future discussion across university-industry boundaries and continuous alignment of their respective practices.
Resumo:
The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.