238 resultados para Design Support


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Experience plays an important role in building management. “How often will this asset need repair?” or “How much time is this repair going to take?” are types of questions that project and facility managers face daily in planning activities. Failure or success in developing good schedules, budgets and other project management tasks depend on the project manager's ability to obtain reliable information to be able to answer these types of questions. Young practitioners tend to rely on information that is based on regional averages and provided by publishing companies. This is in contrast to experienced project managers who tend to rely heavily on personal experience. Another aspect of building management is that many practitioners are seeking to improve available scheduling algorithms, estimating spreadsheets and other project management tools. Such “micro-scale” levels of research are important in providing the required tools for the project manager's tasks. However, even with such tools, low quality input information will produce inaccurate schedules and budgets as output. Thus, it is also important to have a broad approach to research at a more “macro-scale.” Recent trends show that the Architectural, Engineering, Construction (AEC) industry is experiencing explosive growth in its capabilities to generate and collect data. There is a great deal of valuable knowledge that can be obtained from the appropriate use of this data and therefore the need has arisen to analyse this increasing amount of available data. Data Mining can be applied as a powerful tool to extract relevant and useful information from this sea of data. Knowledge Discovery in Databases (KDD) and Data Mining (DM) are tools that allow identification of valid, useful, and previously unknown patterns so large amounts of project data may be analysed. These technologies combine techniques from machine learning, artificial intelligence, pattern recognition, statistics, databases, and visualization to automatically extract concepts, interrelationships, and patterns of interest from large databases. The project involves the development of a prototype tool to support facility managers, building owners and designers. This Industry focused report presents the AIMMTM prototype system and documents how and what data mining techniques can be applied, the results of their application and the benefits gained from the system. The AIMMTM system is capable of searching for useful patterns of knowledge and correlations within the existing building maintenance data to support decision making about future maintenance operations. The application of the AIMMTM prototype system on building models and their maintenance data (supplied by industry partners) utilises various data mining algorithms and the maintenance data is analysed using interactive visual tools. The application of the AIMMTM prototype system to help in improving maintenance management and building life cycle includes: (i) data preparation and cleaning, (ii) integrating meaningful domain attributes, (iii) performing extensive data mining experiments in which visual analysis (using stacked histograms), classification and clustering techniques, associative rule mining algorithm such as “Apriori” and (iv) filtering and refining data mining results, including the potential implications of these results for improving maintenance management. Maintenance data of a variety of asset types were selected for demonstration with the aim of discovering meaningful patterns to assist facility managers in strategic planning and provide a knowledge base to help shape future requirements and design briefing. Utilising the prototype system developed here, positive and interesting results regarding patterns and structures of data have been obtained.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An important aspect of designing any product is validation. Virtual design process (VDP) is an alternative to hardware prototyping in which analysis of designs can be done without manufacturing physical samples. In recent years, VDP have been generated either for animation or filming applications. This paper proposes a virtual reality design process model on one of the applications when used as a validation tool. This technique is used to generate a complete design guideline and validation tool of product design. To support the design process of a product, a virtual environment and VDP method were developed that supports validation and an initial design cycle performed by a designer. The product model car carrier is used as illustration for which virtual design was generated. The loading and unloading sequence of the model for the prototype was generated using automated reasoning techniques and was completed by interactively animating the product in the virtual environment before complete design was built. By using the VDP process critical issues like loading, unloading, Australian Design rules (ADR) and clearance analysis were done. The process would save time, money in physical sampling and to large extent in complete math generation. Since only schematic models are required, it saves time in math modelling and handling of bigger size assemblies due to complexity of the models. This extension of VDP process for design evaluation is unique and was developed, implemented successfully. In this paper a Toll logistics and J Smith and Sons car carrier which is developed under author’s responsibility has been used to illustrate our approach of generating design validation via VDP.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report presents a summary of the research conducted by the research team of the CRC project 2002-005-C, “Decision support tools for concrete infrastructure rehabilitation”. The project scope, objectives, significance and innovation and the research methodology is outlined in the introduction, which is followed by five chapters covering different aspects of the research completed. Major findings of a review of literature conducted covering both use of fibre reinforced polymer composites in rehabilitation of concrete bridge structures and decision support frameworks in civil infrastructure asset management is presented in chapter two. Case study of development of a strengthening scheme for the “Tenthill Creek bridge” is covered in the third chapter, which summarises the capacity assessment, traditional strengthening solution and the innovative solution using FRP composites. The fourth chapter presents the methodology for development of a user guide covering selection of materials, design and application of FRP in strengthening of concrete structures, which were demonstrated using design examples. Fifth chapter presents the methodology developed for evaluating whole of life cycle costing of treatment options for concrete bridge structures. The decision support software tool developed to compare different treatment options based on reliability based whole of life cycle costing will be briefly described in this chapter as well. The report concludes with a summary of findings and recommendations for future research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The early stages of the building design process are when the most far reaching decisions are made regarding the configuration of the proposed project. This paper examines methods of providing decision support to building designers across multiple disciplines during the early stage of design. The level of detail supported is at the massing study stage where the basic envelope of the project is being defined. The block outlines on the building envelope are sliced into floors. Within a floor the only spatial divisions supported are the “user” space and the building core. The building core includes vertical transportation systems, emergency egress and vertical duct runs. The current focus of the project described in the paper is multi-storey mixed use office/residential buildings with car parking. This is a common type of building in redevelopment projects within and adjacent to the central business districts of major Australian cities. The key design parameters for system selection across the major systems in multi-storey building projects - architectural, structural, HVAC, vertical transportation, electrical distribution, fire protection, hydraulics and cost – are examined. These have been identified through literature research and discussions with building designers from various disciplines. This information is being encoded in decision support tools. The decision support tools communicate through a shared database to ensure that the relevant information is shared across all of the disciplines. An internal data model has been developed to support the very early design phase and the high level system descriptions required. A mapping to IFC 2x2 has also been defined to ensure that this early information is available at later stages of the design process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper compares and reviews the recommendations and contents of the guide for the design and construction of externally bonded FRP systems for strengthening concrete structures reported by ACI committee 440 and technical report of Externally bonded FRP reinforcement for RC structures (FIB 14) in application of carbon fiber reinforced polymer (CFRP) composites in strengthening of an aging reinforced concrete headstock. The paper also discusses the background, limitations, strengthening for flexure and shear, and other related issues in use of FRP for strengthening of a typical reinforced concrete headstock structure such as durability, de-bonding, strengthening limits, fire and environmental conditions. A case study of strengthening of a bridge headstock using FRP composites is presented as a worked example in order to illustrate and compare the differences between these two design guidelines when used in conjunction with the philosophy of the Austroads (1992) bridge design code.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper compares and reviews the recommendations and contents of the guide for the design and construction of externally bonded FRP systems for strengthening concrete structures reported by ACI committee 440 and technical report of Externally bonded FRP reinforcement for RC structures (FIB 14) in application of carbon fiber reinforced polymer (CFRP) composites in strengthening of an aging reinforced concrete headstock. The paper also discusses the background, limitations, strengthening for flexure and shear, and other related issues in use of FRP for strengthening of a typical reinforced concrete headstock structure such as durability, de-bonding, strengthening limits, fire and environmental conditions. A case study of strengthening of a bridge headstock using FRP composites is presented as a worked example in order to illustrate and compare the differences between these two design guidelines when used in conjunction with the philosophy of the Austroads (1992) bridge design code.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The road and transport industry in Australia and overseas has come a long way to understanding the impact of road traffic noise on the urban environment. Most road authorities now have guidelines to help assess and manage the impact of road traffic noise on noise-sensitive areas and development. While several economic studies across Australia and overseas have tried to value the impact of noise on property prices, decision-makers investing in road traffic noise management strategies have relatively limited historic data and case studies to go on. The perceived success of a noise management strategy currently relies largely on community expectations at a given time, and is not necessarily based on the analysis of the costs and benefits, or the long-term viability and value to the community of the proposed treatment options. With changing trends in urban design, it is essential that the 'whole-of-life' costs and benefits of noise ameliorative treatment options and strategies be identified and made available for decisionmakers in future investment considerations. For this reason, CRC for Construction Innovation Australia funded a research project, Noise Management in Urban Environments to help decision-makers with future road traffic noise management investment decisions. RMIT University and the Queensland Department of Main Roads (QDMR) have conducted the research work, in collaboration with the Queensland Department of Public Works, ARUP Pty Ltd, and the Queensland University of Technology. The research has formed the basis for the development of a decision-support software tool, and helped collate technical and costing data for known noise amelioration treatment options. We intend that the decision support software tool (DST) should help an investment decision-maker to be better informed of suitable noise ameliorative treatment options on a project-by-project basis and identify likely costs and benefits associated with each of those options. This handbook has been prepared as a procedural guide for conducting a comparative assessment of noise ameliorative options. The handbook outlines the methodology and assumptions adopted in the decision-support framework for the investment decision-maker and user of the DST. The DST has been developed to provide an integrated user-friendly interface between road traffic noise modelling software, the relevant assessment criteria and the options analysis process. A user guide for the DST is incorporated in this handbook.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Simulation is widely used as a tool for analyzing business processes but is mostly focused on examining abstract steady-state situations. Such analyses are helpful for the initial design of a business process but are less suitable for operational decision making and continuous improvement. Here we describe a simulation system for operational decision support in the context of workflow management. To do this we exploit not only the workflow’s design, but also use logged data describing the system’s observed historic behavior, and incorporate information extracted about the current state of the workflow. Making use of actual data capturing the current state and historic information allows our simulations to accurately predict potential near-future behaviors for different scenarios. The approach is supported by a practical toolset which combines and extends the workflow management system YAWL and the process mining framework ProM.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The engagement behaviour of 1,524 student-enrolments (“students”) in five first year units was monitored and 608 (39.9%) were classified as “at risk” using the criterion of not submitting or failing their first assignment. Of these, 327 (53.8%) were successfully contacted (i.e., spoken to by phone) and provided with advice and/or referral to learning and personal support services while the remaining 281 (46.2%) could not be contacted. Nine hundred and sixteen students (60.1%) were classified as “not at risk.” Overall, the at risk group who were contacted achieved significantly higher end-of-semester final grades than, and persisted (completed the unit) at more than twice the rate of, the at risk group who were not contacted. There were variations among the units which were explained by the timing of the first assignment, specific teaching-learning processes and the structure of the curriculum. Implications for curriculum design and supporting first year students within a personal, social and academic framework are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the ways in which university departments and faculties can enhance the quality of learning and assessment is to develop a ‘well thought out criterion‐referenced assessment system’ (Biggs, 2003, p. 271). In designing undergraduate degrees (courses) this entails making decisions about the levelling of expectations across different years through devising objectives and their corresponding criteria and standards: a process of alignment analogous to what happens in unit (subject) design. These decisions about levelling have important repercussions in terms of supporting students’ work‐related learning, especially in relation to their ability to cope with the increasing cognitive and skill demands made on them as they progress through their studies. They also affect the accountability of teacher judgments of students’ responses to assessment tasks, achievement of unit objectives and, ultimately, whether students are awarded their degrees and are sufficiently prepared for the world of work. Research reveals that this decision‐making process is rarely underpinned by an explicit educational rationale (Morgan et al, 2002). The decision to implement criterion referenced assessment in an undergraduate microbiology degree was the impetus for developing such a rationale because of the implications for alignment, and therefore ‘levelling’ of expectations across different years of the degree. This paper provides supporting evidence for a multi‐pronged approach to levelling, through backward mapping of two revised units (foundation and exit year). This approach adheres to the principles of alignment while combining a work‐related approach (via industry input) with the blended disciplinary and learner‐centred approaches proposed by Morgan et al. (2002). It is suggested that this multi‐pronged approach has the potential for making expectations, especially work‐related ones across different year levels of degrees, more explicit to students and future employers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It has been argued that intentional first year curriculum design has a critical role to play in enhancing first year student engagement, success and retention (Kift, 2008). A fundamental first year curriculum objective should be to assist students to make the successful transition to assessment in higher education. Scott (2006) has identified that ‘relevant, consistent and integrated assessment … [with] prompt and constructive feedback’ are particularly relevant to student retention generally; while Nicol (2007) suggests that ‘lack of clarity regarding expectations in the first year, low levels of teacher feedback and poor motivation’ are key issues in the first year. At the very minimum, if we expect first year students to become independent and self-managing learners, they need to be supported in their early development and acquisition of tertiary assessment literacies (Orrell, 2005). Critical to this attainment is the necessity to alleviate early anxieties around assessment information, instructions, guidance, and performance. This includes, for example:  inducting students thoroughly into the academic languages and assessment genres they will encounter as the vehicles for evidencing learning success; and  making expectations about the quality of this evidence clear. Most importantly, students should receive regular formative feedback of their work early in their program of study to aid their learning and to provide information to both students and teachers on progress and achievement. Leveraging research conducted under an ALTC Senior Fellowship that has sought to articulate a research-based 'transition pedagogy' (Kift & Nelson, 2005) – a guiding philosophy for intentional first year curriculum design and support that carefully scaffolds and mediates the first year learning experience for contemporary heterogeneous cohorts – this paper will discuss theoretical and practical strategies and examples that should be of assistance in implementing good assessment and feedback practices across a range of disciplines in the first year.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As all environmental problems are caused by human systems of design, sustainability can be seen as a design problem. Given the massive energy and material flows through the built environment, sustainability simply cannot be achieved without the re-design of our urban areas. ‘Eco-retrofitting’, as used here, means modifying buildings and/or urban areas to create net positive social and environmental impacts – both on site and off site. While this has probably not been achieved anywhere as yet, myriad but untapped eco-solutions are already available which could be up-scaled to the urban level. It is now well established that eco-retrofitting buildings and cities with appropriate design technology can pay for itself through lower health costs, productivity increases and resource savings. Good design would also mean happier human and ecological communities at a much lower cost over time. In fact, good design could increase life quality and the life support services of nature while creating sustainable‘economic’growth. The impediments are largely institutional and intellectual, which can be encapsulated in the term ‘managerial’. There are, however, also systems design solutions to the managerial obstacles that seem to be stalling the transition to sustainable systems designs. Given the sustainability imperative, then, why is the adoption of better management systems so slow? The oral presentation will show examples of ways in which built environment design can create environments that not only reduce the ongoing damage of past design, but could theoretically generate net positive social and ecological outcomes over their life cycle. These illustrations show that eco-retrofitting could cost society less than doing nothing - especially given the ongoing renovations of buildings - but for managerial hurdles. The paper outlines on how traditional managerial approaches stand in the way of ‘design for ecosystem services’, and list some management solutions that have long been identified, but are not yet widely adopted. Given the pervasive nature of these impediments and their alternatives, they are presented by way of examples. A sampling of eco-retrofitting solutions are also listed to show that ecoretrofitting is a win-win-win solution that stands ready to be implemented by people having management skills and/or positions of influence.