423 resultados para Engineering Asset Management, Optimisation, Preventive Maintenance, Reliability Based Preventive Maintenance, Multiple Criteria Decision Making


Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the rapid development of various technologies and applications in smart grid implementation, demand response has attracted growing research interests because of its potentials in enhancing power grid reliability with reduced system operation costs. This paper presents a new demand response model with elastic economic dispatch in a locational marginal pricing market. It models system economic dispatch as a feedback control process, and introduces a flexible and adjustable load cost as a controlled signal to adjust demand response. Compared with the conventional “one time use” static load dispatch model, this dynamic feedback demand response model may adjust the load to a desired level in a finite number of time steps and a proof of convergence is provided. In addition, Monte Carlo simulation and boundary calculation using interval mathematics are applied for describing uncertainty of end-user's response to an independent system operator's expected dispatch. A numerical analysis based on the modified Pennsylvania-Jersey-Maryland power pool five-bus system is introduced for simulation and the results verify the effectiveness of the proposed model. System operators may use the proposed model to obtain insights in demand response processes for their decision-making regarding system load levels and operation conditions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is a digital process that encompasses all aspects, disciplines and systems of built assets within a single virtual model. This allows stakeholders to collaborate more accurately and efficiently than with traditional processes. Case study 1 Design: New Generation Rollingstock Maintenance Centre, Queensland. Case Study 2 Construction: Perth Children's Hospital, Western Australia. Case Study 3 Asset Management: Sydney Opera House, New South Wales. This project sought to provide the built environment industry with a framework to measure and maximize benefits from implementing BIM across the life-cycle phases of a built asset.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

While many studies have explored conditions and consequences of information systems adoption and use, few have focused on the final stages of the information system lifecycle. In this paper, I develop a theoretical and an initial empirical contribution to understanding individuals’ intentions to discontinue the use of an information system. This understanding is important because it yields implications about maintenance, retirement, and users’ switching decisions, which ultimately can affect work performance, system effectiveness, and return on technology investments. In this paper, I offer a new conceptualization of factors determining users’ intentions to discontinue the use of information systems. I then report on a preliminary empirical test of the model using data from a field study of information system users in a promotional planning routine in a large retail organization. Results from the empirical analysis provide first empirical support for the theoretical model. I discuss the work’s implications for theory on information systems continuance and dual-factor logic in information system use. I also provide suggestions for managers dealing with cessation of information systems and broader work routine change in organizations due to information system end-of-life decisions.