794 resultados para QoS assessment
Resumo:
There have been many improvements in Australian engineering education since the 1990s. However, given the recent drive for assuring the achievement of identified academic standards, more progress needs to be made, particularly in the area of evidence-based assessment. This paper reports on initiatives gathered from the literature and engineering academics in the USA, through an Australian National Teaching Fellowship program. The program aims to establish a process to help academics in designing and implementing evidence-based assessments that meet the needs of not only students and the staff that teach them, but also industry as well as accreditation bodies. The paper also examines the kinds and levels of support necessary for engineering academics, especially early career ones, to help meet the expectations of the current drive for assured quality and standards of both research and teaching. Academics are experiencing competing demands on their time and energy with very high expectations in research performance and increased teaching responsibilities, although many are researchers who have not had much pedagogic training. Based on the literature and investigation of relevant initiatives in the USA, we conducted interviews with several identified experts and change agents who have wrought effective academic cultural change within their institutions and beyond. These reveal that assuring the standards and quality of student learning outcomes through evidence-based assessments cannot be appropriately addressed without also addressing the issue of pedagogic training for academic staff. To be sustainable, such training needs to be complemented by a culture of on-going mentoring support from senior academics, formalised through the university administration, so that mentors are afforded resources, time, and appropriate recognition.
Resumo:
Advanced substation applications, such as synchrophasors and IEC 61850-9-2 sampled value process buses, depend upon highly accurate synchronizing signals for correct operation. The IEEE 1588 Precision Timing Protocol (PTP) is the recommended means of providing precise timing for future substations. This paper presents a quantitative assessment of PTP reliability using Fault Tree Analysis. Two network topologies are proposed that use grandmaster clocks with dual network connections and take advantage of the Best Master Clock Algorithm (BMCA) from IEEE 1588. The cross-connected grandmaster topology doubles reliability, and the addition of a shared third grandmaster gives a nine-fold improvement over duplicated grandmasters. The performance of BMCA mediated handover of the grandmaster role during contingencies in the timing system was evaluated experimentally. The 1 µs performance requirement of sampled values and synchrophasors are met, even during network or GPS antenna outages. Slave clocks are shown to synchronize to the backup grandmaster in response to degraded performance or loss of the main grandmaster. Slave disturbances are less than 350 ns provided the grandmaster reference clocks are not offset from one another. A clear understanding of PTP reliability and the factors that affect availability will encourage the adoption of PTP for substation time synchronization.
Resumo:
In this paper a combined subtransmission and distribution reliability analysis of SEQEB’s outer suburban network is presented. The reliability analysis was carried out with a commercial software package which evaluates both energy and customer indices. Various reinforcement options were investigated to ascertain the impact they have on the reliability of supply seen by the customers. The customer and energy indices produced by the combined subtransmission and distribution reliability studies contributed to optimise capital expenditure to the most effective areas of the network.
Resumo:
This paper present an efficient method using system state sampling technique in Monte Carlo simulation for reliability evaluation of multi-area power systems, at Hierarchical Level One (HLI). System state sampling is one of the common methods used in Monte Carlo simulation. The cpu time and memory requirement can be a problem, using this method. Combination of analytical and Monte Carlo method known as Hybrid method, as presented in this paper, can enhance the efficiency of the solution. Incorporation of load model in this study can be utilised either by sampling or enumeration. Both cases are examined in this paper, by application of the methods on Roy Billinton Test System(RBTS).
Resumo:
The reliable operation of the electrical system at Callide Power Station is of extreme importance to the normal everyday running of the Station. This study applied the principles of reliability to do an analysis on the electrical system at Callide Power Station. It was found that the level of expected outage cost increased exponentially with a declining level of maintenance. Concluding that even in a harsh economic electricity market where CS Energy tries and push their plants to the limit, maintenance must not be neglected. A number of system configurations were found to increase the reliability of the system and reduce the expected outage costs. A number of other advantages were identified as a result of using reliability principles to do this study on the Callide electrical system configuration.
Resumo:
This paper presents a reliability assessment of a substation, part of the Queensland transmission network in Australia. As part of a maintenance considerations, this study utilises the substation reliability assessment package STAREL to quantitatively compare the reliability improvement achieved by two circuit breaker reinforcement alternatives for Swanbank circuit breaker replacement or refurbishment. Substation reliability is interpreted on the basis of outage frequency and outage duration indices for each individual transmission line terminated in Swanbank 'B' substation. By considering the reliability indices in this paper with the cost associated conducted by POWERLINK Queensland, a Swanbank 'B' reinforcement alternative can be selected that optimises both transmission line security and the costs incurred in achieving it.
Resumo:
Internationally there has been a move towards standards-referenced assessment with countries such as Australia developing a National Curriculum and Achievement Standards, New Zealand adopting National Standards for literacy and numeracy that involve schools making and reporting judgements about the reading, writing and mathematics achievement of children up to Year 8 (the end of primary school) and in Canada, classroom assessment standards aimed at the improvement of assessment practice of K-12 education are being formulated. Standards-driven reform has major implications for teachers’ work. The consequences of adopting a standards-driven approach to educational change by systems are often under-estimated with the unintended effects not fully understood by either the policy writers, and the public, including parents. It is for these reasons that the contention developed in this article relates to the teacher’s role, which it is argued remains central to policy focused on the improvement of the quality of education and educational standards.
Resumo:
This article considers the implications for Queensland practitioners of the decision of the New South Wales Court of Appeal in Branson v Tucker [2012] NSWCA 310. That decision involved the question whether the court retained a jurisdiction to examine the reasonableness of costs charged by a barrister, who had entered a costs agreement with solicitors, in circumstances where where had been no application under the Legal Profession Act 2004 (NSW) for an assessment of the costs the subject of the bill and it was no longer possible for such an application to be made.
Resumo:
Climate change and land use pressures are making environmental monitoring increasingly important. As environmental health is degrading at an alarming rate, ecologists have tried to tackle the problem by monitoring the composition and condition of environment. However, traditional monitoring methods using experts are manual and expensive; to address this issue government organisations designed a simpler and faster surrogate-based assessment technique for consultants, landholders and ordinary citizens. However, it remains complex, subjective and error prone. This makes collected data difficult to interpret and compare. In this paper we describe a work-in-progress mobile application designed to address these shortcomings through the use of augmented reality and multimedia smartphone technology.
Resumo:
There is a need for public health interventions to be based on the best available evidence. Unfortunately, well-conducted studies from settings similar to that in which an intervention is to be implemented are often not available. Therefore, health practitioners are forced to make judgements about proven effective interventions in one setting and their suitability to make a difference in their own setting. The framework of Wang et al. has been proposed to help with this process. This paper provides a case study on the application of the framework to a decision-making process regarding antenatal care in Aboriginal and Torres Strait Islander communities in Queensland. This method involved undertaking a systematic search of the current available evidence, then conducting a second literature search to determine factors that may affect the applicability and transferability of these interventions into these communities. Finally, in consideration of these factors, clinical judgement decisions on the applicability and transferability of these interventions were made. This method identified several interventions or strategies for which there was evidence of improving antenatal care or outcomes. By using the framework, we concluded that several of these effective interventions would be feasible in Aboriginal and Torres Strait Islander communities within Queensland.