524 resultados para Engineering Asset Management
Resumo:
The design-build (DB) delivery method has been widely used in the United States due to its reputed superior cost and time performance. However, rigorous studies have produced inconclusive support and only in terms of overall results, with few attempts being made to relate project characteristics with performance levels. This paper provides a larger and more finely grained analysis of a set of 418 DB projects from the online project database of the Design-Build Institute of America (DBIA), in terms of the time-overrun rate (TOR), early start rate (ESR), early completion rate (ECR) and cost overrun rate (COR) associated with project type (e.g., commercial/institutional buildings and civil infrastructure projects), owners (e.g., Department of Defense and private corporations), procurement methods (e.g., ‘best value with discussion’ and qualifications-based selection), contract methods (e.g., lump sum and GMP) and LEED levels (e.g., gold and silver). The results show ‘best value with discussion’ to be the dominant procurement method and lump sum the most frequently used contract method. The DB method provides relatively good time performance, with more than 75% of DB projects completed on time or before schedule. However, with more than 50% of DB projects cost overrunning, the DB advantage of cost saving remains uncertain. ANOVA tests indicate that DB projects within different procurement methods have significantly different time performance and that different owner types and contract methods significantly affect cost performance. In addition to contributing to empirical knowledge concerning the cost and time performance of DB projects with new solid evidence from a large sample size, the findings and practical implications of this study are beneficial to owners in understanding the likely schedule and budget implications involved for their particular project characteristics.
Resumo:
The fundamental aim in fisheries management is to determine an optimal fishing effort for sustainably harvesting from a replenishable resource. The current management objective of Australia's Northern Prawn Fishery is to maximize the long-term net economic return following Australian government policy, resulting in an average recent catch of tiger prawn species of about 1,250 tons only. However, the maximum sustainable catch stated from different studies is around 3,000-4,700 tons. We also evaluated the net profit assuming that there was no buyback scheme in 2005 and the fishing fleet was kept at 89 vessels since 2005 and concluded that 40% more catch on average (2006-2009) and an additional total profit of A$ 17 million ( excluding crew cost) could have been gained in addition to the many millions of dollars of savings in the buyback scheme. These findings have great implications for future management in Australia and elsewhere because there is a grave concern of overfishing worldwide.
Resumo:
Non-competitive bids have recently become a major concern in both Public and Private sector construction contract auctions. Consequently, several models have been developed to help identify bidders potentially involved in collusive practices. However, most of these models require complex calculations and extensive information that is difficult to obtain. The aim of this paper is to utilize recent developments for detecting abnormal bids in capped auctions (auctions with an upper bid limit set by the auctioner) and extend them to the more conventional uncapped auctions (where no such limits are set). To accomplish this, a new method is developed for estimating the values of bid distribution supports by using the solution to what has become known as the German tank problem. The model is then demonstrated and tested on a sample of real construction bid data and shown to detect cover bids with high accuracy. This work contributes to an improved understanding of abnormal bid behavior as an aid to detecting and monitoring potential collusive bid practices.
Resumo:
Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.
Resumo:
This study investigates the impacts of ISO 9001:2008 certification on companies in Malaysia. Data were collected from CEOs and Managers through a questionnaire survey. A multivariate analysis and SPSS macro were used as statistical techniques to assess the effects of ISO 9001 certification. Results of the study indicate that ISO 9001 certified companies were having significantly greater benefits and financial performance compared to non-certified companies. However, no significant direct relationship between ISO 9001 certification and company's financial performance was found. A further investigation revealed that financial performance is actually directly related to quality and local and international business performance, which are significantly influenced by ISO 9001 certification. Therefore quality and business performances are involved in the mediational process between the financial performance of companies and ISO 9001 certification. The novelty of this research lies in the establishment of, for the first time, high level statistical relationship between ISO 9001 certification, its mediating factors and financial performance of companies.
Resumo:
At present, many countries have either embraced ISO9001 or used it as the basis of their national quality certification systems. However, few studies have been conducted to examine the benefits companies’ gain from achieving and implementing ISO9001 standards (Chikuku et al. 2012; Psomas et al. 2013; Sampaio et al. 2011a,b). Analysis has brought much more confused and uneven results across the countries. Turning to the experience of Malaysia, this country has witnessed a spectacular growth at an average rate of 9.89% per annum of ISO certificates issued to companies operating within its borders (ISO Survey 2012). While many companies rush to be ISO 9001 certified whether this brings about better benefits (both the financial and the non-financial) is still an open question. In this study, the research problems were first formulated from the literature and then a questionnaire survey was conducted to test the hypotheses. A survey was administered to chief executives officers and managers across manufacturing and service organizations in Malaysia. Multivariate analysis and SPSS macro developed by Preacher and Hayes were used as statistical techniques to the financial and non-financial benefits of ISO9001 certification. The survey instrument was a two-page questionnaire comprising three sections. The first section of the questionnaire covered the company’s profile. The second section consisted of 25 items on internal benefits and third section consisted of 7 items on external benefits measured on 1–5 Likert scale to assess the benefits of ISO9001 certification. Total 201 valid responses were received. Results of the study indicate that there was no significant direct relationship between ISO9001 certification and organizational financial performance, while strong statistical evidence was found to support the direct relationship between ISO9001 certification and non-financial performance. The findings of the study discovered that financial performance is actually directly related to two non-financial measures, namely quality performance and local and international business performance, which are directly and significantly influenced by ISO9001 certification. Therefore non-financial performance measures are involved in the mediational process. The findings will assist practitioners in taking right courses of action that make the implementation of this standard more effective. For example, the study findings study suggests that companies should put emphasize on nonfinancial factors to improve their financial performance.
Resumo:
The construction industries of developed countries are faced with an aging workforce and a shortage of recruits. It is common for migrant workers/ethnic minorities (EMs) who are already part of the society to join the construction industry. With increasing involvement of EMs in the construction industry, effective strategies for improving their safety and health are urgently needed. The existing body of knowledge is mainly derived from research conducted in English-speaking countries with Western cultures. Research on safety of migrant/EM construction workers in multidialect Asian countries with Eastern cultures has been lacking. This study aimed to identify various strategies for improving the safety and health of EM construction workers from the Asian perspective. Twenty-two face-to-face semistructured interviews were performed with safety professionals in Hong Kong followed by two rounds of Delphi survey with 18 safety experts to verify the interview findings and rank the relative importance of the strategies. The study unveiled 14 strategies for improving the safety performance of EM workers. The three most important ones identified were: (1) to provide safety training in EM native languages; (2) that government and industry associations should play an active role in promoting health and safety awareness of EM workers, and; (3) to encourage EM workers to learn the local language. This study contributes to filling the research gap by evaluating the strategies for improving safety of migrant/EM construction workers in Asian countries with Eastern cultures in which English is not the first language. Research findings would assist occupational health and safety experts and relevant stakeholders in designing strategies for improving the safety and health of EM workers, which will ultimately improve overall safety performance of the construction industry.
Resumo:
"Safety of RMAA works is an almost uncharted topic of rising importance internationally. Small construction contractors are particularly dependant on RMAA work, especially during times of recession, and they undertake more risks on these jobs than large companies do. This book is based on unique international research and consultancy projects which detail, investigate, and suggest solutions to the specific challenges of safety in RMAA works, based on case studies. Starting with an overview of safety in the wider construction industries of developed countries, the first half of this book also provides a comprehensive summary of relevant rules, regulations, and the resulting safety performances. The systems in the UK, US and Hong Kong are described and contrasted, giving the reader an understanding of how different regulatory approaches have yielded a variety of results. From this solid introduction, specific problems observed in RMAA work are examined through case studies, with reference to the underlying cultural and demographic factors, and a variety of practical engineering and management solutions are explored. This important and practical international work is essential reading for postgraduate students of health and safety in construction, construction project management, or construction in developing countries, as well as policy-makers and construction project managers."--Publisher website
Resumo:
Construction projects can involve a diverse range of stakeholders and the success of the project depends very much on fulfilling their needs and expectations. It is important, therefore, to identify and recognize project stakeholders and develop a rigorous stakeholder management process. However, limited research has investigated the impact of stakeholders on construction projects in developing countries. A stakeholder impact analysis (SIA), based on an approach developed by Olander (2007), was adopted to investigate the stakeholders' impact on state-owned civil engineering projects in Vietnam. This involved the analysis of a questionnaire survey of 57 project managers to determine the relative importance of different stakeholders. The results show the client to have the highest level of impact on the projects, followed by project managers and the senior management of state-owned engineering firms. The SIA also provides suggestions to project managers in developing and evaluating the stakeholder management process.
Resumo:
Purpose - The paper examines the benefits of further diversifying a global portfolio of financial assets with New Zealand farm real estate (FRE). ---------- Design/methodology/approach - We compare efficient sets generated with and without farm real estate using portfolio theory. ---------- Findings - The results show that given the predominantly negative correlation between FRE and financial assets, the risk-return tradeoffs of portfolios of financial assets can be improved significantly. The diversification benefits measured in terms of risk reduction, return enhancement, and improvement in the Sharpe performance ratios are robust under a number of FRE risk-return scenarios as well as under high and low inflationary periods. Using 5- and 10-year rolling periods we also find that FRE is a consistent part of risk efficient portfolios. Consistent with the results reported in Lee and Stevenson (2006) for UK real estate the risk reduction benefits of diversifying with FRE are larger than the risk enhancement benefits. ---------- Practical implication - The results suggest that FRE takes on a consistent role of risk-reducer rather than a return-enhancer in a globally diversified portfolio. FRE appears to deserve more serious consideration by investment practitioners that it has been accorded in the past. Originality/value – The study examines the role of direct real estate in a globally diversified portfolio of financial assets.
Resumo:
Physical infrastructure assets are important components of our society and our economy. They are usually designed to last for many years, are expected to be heavily used during their lifetime, carry considerable load, and are exposed to the natural environment. They are also normally major structures, and therefore present a heavy investment, requiring constant management over their life cycle to ensure that they perform as required by their owners and users. Given a complex and varied infrastructure life cycle, constraints on available resources, and continuing requirements for effectiveness and efficiency, good management of infrastructure is important. While there is often no one best management approach, the choice of options is improved by better identification and analysis of the issues, by the ability to prioritise objectives, and by a scientific approach to the analysis process. The abilities to better understand the effect of inputs in the infrastructure life cycle on results, to minimise uncertainty, and to better evaluate the effect of decisions in a complex environment, are important in allocating scarce resources and making sound decisions. Through the development of an infrastructure management modelling and analysis methodology, this thesis provides a process that assists the infrastructure manager in the analysis, prioritisation and decision making process. This is achieved through the use of practical, relatively simple tools, integrated in a modular flexible framework that aims to provide an understanding of the interactions and issues in the infrastructure management process. The methodology uses a combination of flowcharting and analysis techniques. It first charts the infrastructure management process and its underlying infrastructure life cycle through the time interaction diagram, a graphical flowcharting methodology that is an extension of methodologies for modelling data flows in information systems. This process divides the infrastructure management process over time into self contained modules that are based on a particular set of activities, the information flows between which are defined by the interfaces and relationships between them. The modular approach also permits more detailed analysis, or aggregation, as the case may be. It also forms the basis of ext~nding the infrastructure modelling and analysis process to infrastructure networks, through using individual infrastructure assets and their related projects as the basis of the network analysis process. It is recognised that the infrastructure manager is required to meet, and balance, a number of different objectives, and therefore a number of high level outcome goals for the infrastructure management process have been developed, based on common purpose or measurement scales. These goals form the basis of classifYing the larger set of multiple objectives for analysis purposes. A two stage approach that rationalises then weights objectives, using a paired comparison process, ensures that the objectives required to be met are both kept to the minimum number required and are fairly weighted. Qualitative variables are incorporated into the weighting and scoring process, utility functions being proposed where there is risk, or a trade-off situation applies. Variability is considered important in the infrastructure life cycle, the approach used being based on analytical principles but incorporating randomness in variables where required. The modular design of the process permits alternative processes to be used within particular modules, if this is considered a more appropriate way of analysis, provided boundary conditions and requirements for linkages to other modules, are met. Development and use of the methodology has highlighted a number of infrastructure life cycle issues, including data and information aspects, and consequences of change over the life cycle, as well as variability and the other matters discussed above. It has also highlighted the requirement to use judgment where required, and for organisations that own and manage infrastructure to retain intellectual knowledge regarding that infrastructure. It is considered that the methodology discussed in this thesis, which to the author's knowledge has not been developed elsewhere, may be used for the analysis of alternatives, planning, prioritisation of a number of projects, and identification of the principal issues in the infrastructure life cycle.
Resumo:
In an atmosphere where civilization is progressing and becoming more aware of the consequences of careless development decisions, rethinking sustainable development - particularly sustainable urban and infrastructure development - has become an inevitable necessity. ------ ----- Rethinking Sustainable Development: Urban Management, Engineering, and Design considers the role of urban, regional and infrastructure planning in achieving sustainable urban and infrastructure development, providing insights into overcoming the consequences of unsustainable development. This companion volume to Sustainable Urban and Regional Infrastructure: Technology, Planning and Management, overviews all aspects of sustainable urban and infrastructure development.
Resumo:
Since the establishment of the first national strategic development plan in the early 1970s, the construction industry has played an important role in terms of the economic, social and cultural development of Indonesia. The industry’s contribution to Indonesia’s gross domestic product (GDP) increased from 3.9% in 1973 to 7.7% in 2007. Business Monitoring International (2009) forecasts that Indonesia is home to one of the fastest-growing construction industries in Asia despite the average construction growth rate being expected to remain under 10% over the period 2006 – 2010. Similarly, Howlett and Powell (2006) place Indonesia as one of the 20 largest construction markets in 2010. Although the prospects for the Indonesian construction industry are now very promising, many local construction firms still face serious difficulties, such as poor performance and low competitiveness. There are two main reasons behind this problem: the environment that they face is not favourable; the other is the lack of strategic direction to improve competitiveness and performance. Furthermore, although strategic management has now become more widely used by many large construction firms in developed countries, practical examples and empirical studies related to the Indonesian construction industry remain scarce. In addition, research endeavours related to these topics in developing countries appear to be limited. This has potentially become one of the factors hampering efforts to guide Indonesian construction enterprises. This research aims to construct a conceptual model to enable Indonesian construction enterprises to develop a sound long-term corporate strategy that generates competitive advantage and superior performance. The conceptual model seeks to address the main prescription of a dynamic capabilities framework (Teece, Pisano & Shuen, 1997; Teece, 2007) within the context of the Indonesian construction industry. It is hypothesised that in a rapidly changing and varied environment, competitive success arises from the continuous development and reconfiguration of firm’s specific assets achieving competitive advantage is not only dependent on the exploitation of specific assets/capabilities, but on the exploitation of all of the assets and capabilities combinations in the dynamic capabilities framework. Thus, the model is refined through sequential statistical regression analyses of survey results with a sample size of 120 valid responses. The results of this study provide empirical evidence in support of the notion that a competitive advantage is achieved via the implementation of a dynamic capability framework as an important way for a construction enterprise to improve its organisational performance. The characteristics of asset-capability combinations were found to be significant determinants of the competitive advantage of the Indonesian construction enterprises, and that such advantage sequentially contributes to organisational performance. If a dynamic capabilities framework can work in the context of Indonesia, it suggests that the framework has potential applicability in other emerging and developing countries. This study also demonstrates the importance of the multi-stage nature of the model which provides a rich understanding of the dynamic process by which asset-capability should be exploited in combination by the construction firms operating in varying levels of hostility. Such findings are believed to be useful to both academics and practitioners, however, as this research represents a dynamic capabilities framework at the enterprise level, future studies should continue to explore and examine the framework in other levels of strategic management in construction as well as in other countries where different cultures or similar conditions prevails.