481 resultados para Constraints-led approach
Resumo:
Patterns of connectivity among local populations influence the dynamics of regional systems, but most ecological models have concentrated on explaining the effect of connectivity on local population structure using dynamic processes covering short spatial and temporal scales. In this study, a model was developed in an extended spatial system to examine the hypothesis that long term connectivity levels among local populations are influenced by the spatial distribution of resources and other habitat factors. The habitat heterogeneity model was applied to local wild rabbit populations in the semi-arid Mitchell region of southern central Queensland (the Eastern system). Species' specific population parameters which were appropriate for the rabbit in this region were used. The model predicted a wide range of long term connectivity levels among sites, ranging from the extreme isolation of some sites to relatively high interaction probabilities for others. The validity of model assumptions was assessed by regressing model output against independent population genetic data, and explained over 80% of the variation in the highly structured genetic data set. Furthermore, the model was robust, explaining a significant proportion of the variation in the genetic data over a wide range of parameters. The performance of the habitat heterogeneity model was further assessed by simulating the widely reported recent range expansion of the wild rabbit into the Mitchell region from the adjacent, panmictic Western rabbit population system. The model explained well the independently determined genetic characteristics of the Eastern system at different hierarchic levels, from site specific differences (for example, fixation of a single allele in the population at one site), to differences between population systems (absence of an allele in the Eastern system which is present in all Western system sites). The model therefore explained the past and long term processes which have led to the formation and maintenance of the highly structured Eastern rabbit population system. Most animals exhibit sex biased dispersal which may influence long term connectivity levels among local populations, and thus the dynamics of regional systems. When appropriate sex specific dispersal characteristics were used, the habitat heterogeneity model predicted substantially different interaction patterns between female-only and combined male and female dispersal scenarios. In the latter case, model output was validated using data from a bi-parentally inherited genetic marker. Again, the model explained over 80% of the variation in the genetic data. The fact that such a large proportion of variability is explained in two genetic data sets provides very good evidence that habitat heterogeneity influences long term connectivity levels among local rabbit populations in the Mitchell region for both males and females. The habitat heterogeneity model thus provides a powerful approach for understanding the large scale processes that shape regional population systems in general. Therefore the model has the potential to be useful as a tool to aid in the management of those systems, whether it be for pest management or conservation purposes.
Resumo:
Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.
Resumo:
Crime in the Professions critically examines the nature and extent of crime and deviance in the professions and how it should be dealt with. The increasing professionalization of the work force and the changes in the way in which professionals carry out their work, such as through the use of computing and communications technology, have created new opportunities for professionals to break the law. Looking in detail at the nature and extent of crime committed by professionals such as doctors, accountants and nurses the book offers some innovative solutions on preventing and controlling professional crime. In addition to examining the nature and extent of crime in the professions, it also addresses some critical issues of regulation for the future, concerning new and emerging professional groups and issues relating to emerging technologies.
Resumo:
his case study aims to describe how general parenting principles can be used as part of parent-led, family-focused child weight management that is in line with current Australian Clinical Practice Guidelines. A parent-led, family-focused child weight management program was designed for use by dietitians with parents of young children (five- to nine-year-olds). The program utilises the cornerstones of overweight treatment: diet, activity, behaviour modification and family support delivered in an age-appropriate, family-focused manner. Parents participate in 16 sessions (4 parenting-focused, 8 lifestyle-focused and 4 individual telephone support calls) conducted weekly, fortnightly then monthly over six months. This case study illustrates how a family used the program, resulting in reduced degree of overweight and stabilised waist circumference in the child over 12 months. In conclusion, linking parenting skills to healthy family lifestyle education provides an innovative approach to family-focused child weight management. It addresses key Australian Clinical Practice Guidelines, works at the family level, and provides a means for dietitians to easily adopt age-appropriate behaviour modification as part of their practice.
Resumo:
Objectives: This methodological paper reports on the development and validation of a work sampling instrument and data collection processes to conduct a national study of nurse practitioners’ work patterns. ---------- Design: Published work sampling instruments provided the basis for development and validation of a tool for use in a national study of nurse practitioner work activities across diverse contextual and clinical service models. Steps taken in the approach included design of a nurse practitioner-specific data collection tool and development of an innovative web-based program to train and establish inter rater reliability of a team of data collectors who were geographically dispersed across metropolitan, rural and remote health care settings. ---------- Setting: The study is part of a large funded study into nurse practitioner service. The Australian Nurse Practitioner Study is a national study phased over three years and was designed to provide essential information for Australian health service planners, regulators and consumer groups on the profile, process and outcome of nurse practitioner service. ---------- Results: The outcome if this phase of the study is empirically tested instruments, process and training materials for use in an international context by investigators interested in conducting a national study of nurse practitioner work practices. ---------- Conclusion: Development and preparation of a new approach to describing nurse practitioner practices using work sampling methods provides the groundwork for international collaboration in evaluation of nurse practitioner service.
Resumo:
The overarching aim of this study is to create new knowledge about how playful interactions (re)create the city via ubiquitous technologies, with an outlook to apply the knowledge for pragmatic innovations in relevant fields such as urban planning and technology development in the future. The study looks at the case of transyouth, the in-between demographic bridging youth and adulthood in Seoul, one of the most connected, densely populated, and quickly transforming metropolises in the world. To unravel the elusiveness of ‘play’ as a subject and the complexity of urban networks, this study takes a three-tier transdisciplinary approach comprised of an extensive literature review, Shared Visual Ethnography (SVE), and interviews with leading industry representatives who design and develop the playscape for Seoul transyouth. Through these methodological tools, the study responds to the following four research aims: 1. Examine the sociocultural, technological, and architectural context of Seoul 2. Investigate Seoul transyouth’s perception of the self and their technosocial environment 3. Identify the pattern of their playful interaction through which meanings of the self and the city are recreated 4. Develop an analytical framework for enactment of play This thesis argues that the city is a contested space that continuously changes through multiple interactions among its constituents on the seam of control and freedom. At the core of this interactive (re)creation process is play. Play is a phenomenon that is enacted at the centre of three inter-related elements of pressure, possibility, and pleasure, the analytical framework this thesis puts forward as a conceptual apparatus for studying play across disciplines. The thesis concludes by illustrating possible trajectories for pragmatic application of the framework for envisioning and building the creative, sustainable, and seductive city.
Resumo:
A collaborative approach to home care (HC) delivery for older clients has taken centre stage (Nies, 2006). In Finland, public home help and home health care services have been combined to form the home care unit, whose goal is to provide a collaborative approach to care delivery through cooperation and sharing of responsibilities. In this model, the general practitioner (GP), home care nurses (HCN) and home help workers (HHW) care for shared clients. GPs and HCNs provide health care, such as monitoring of clients’ health status, and HHWs assist with personal care tasks such as dressing, washing and meal preparation. As the needs of older clients are multiple, collaboration is needed as one professional group cannot take sole responsibility (Nies, 2006). This paper reports on a study undertaken to examine home care unit care providers’ perspectives of the collaborative approach to HC delivery for older clients.
Resumo:
Purpose, Design/methodology / approach The acknowledgement of state significance in relation to development projects can result in special treatment by regulatory authorities, particularly in terms of environmental compliance and certain economic and other government support measures. However, defining just what constitutes a “significant project”, or a project of “state significance”, varies considerably between Australian states. In terms of establishing threshold levels, in Queensland there is even less clarity. Despite this lack of definition, the implications of “state significance” can nevertheless be considerable. For example, in Queensland if the Coordinator-General declares a project to be a “significant project” under the State Development and Public Works Organisation Act 1971, the environmental impact assessment process may become more streamlined – potentially circumventing certain provisions under The Integrated Planning Act 1997. If the project is not large enough to be so deemed, an extractive resource under the State Planning Policy 2/07 - Protection of Extractive Resources 2007 may be considered to be of State or regional significance and subsequently designated as a “Key Resource Area”. As a consequence, such a project is afforded some measure of resource protection but remains subject to the normal assessment process under the Integrated Development Assessment System, as well as the usual requirements of the vegetation management codes, and other regulations. Findings (Originality/value) & Research limitations / implications This paper explores the various meanings of “state significance” in Queensland and the ramifications for development projects in that state. It argues for a streamlining of the assessment process in order to avoid or minimise constraints acting on the state’s development. In so doing, it questions the existence of a strategic threat to the delivery of an already over-stretched infrastructure program.
Resumo:
A nutrient amendment experiment was conducted for two growing seasons in two alpine tundra communities to test the hypotheses that: (1) primary production is limited by nutrient availability, and (2) physiological and developmental constraints act to limit the responses of plants from a nutrient-poor community more than plants from a more nutrient-rich community to increases in nutrient availability. Experimental treatments consisted of N, P, and N+P amendments applied to plots in two physiognomically similar communities, dry and wet meadows. Extractable N and P from soils in nonfertilized control plots indicated that the wet meadow had higher N and P availability. Photosynthetic, nutrient uptake, and growth responses of the dominants in the two communities showed little difference in the relative capacity of these plants to respond to the nutrient additions. Aboveground production responses of the communities to the treatments indicated N availability was limiting to production in the dry meadow community while N and P availability colimited production in the wet meadow community. There was a greater production response to the N and N+P amendments in the dry meadow relative to the wet meadow, despite equivalent functional responses of the dominant species of both communities. The greater production response in the dry meadow was in part related to changes in community structure, with an increase in the proportion of graminoid and forb biomass, and a decrease in the proportion of community biomass made up by the dominant sedge Kobresia myosuroides. Species richness increased significantly in response to the N+P treatment in the dry meadow. Graminoid biomass increased significantly in the wet meadow N and N+P plots, while forb biomass decreased significantly, suggesting a competitive interaction for light. Thus, the difference in community response to nutrient amendments was not the result of functional changes at the leaf level of the dominant species, but rather was related to changes in community structure in the dry meadow, and to a shift from a nutrient to a light limitation of production in the wet meadow.
Resumo:
This paper suggests an approach for finding an appropriate combination of various parameters for extracting texture features (e.g. choice of spectral band for extracting texture feature, size of the moving window, quantization level of the image, and choice of texture feature etc.) to be used in the classification process. Gray level co-occurrence matrix (GLCM) method has been used for extracting texture from remotely sensed satellite image. Results of the classification of an Indian urban environment using spatial property (texture), derived from spectral and multi-resolution wavelet decomposed images have also been reported. A multivariate data analysis technique called ‘conjoint analysis’ has been used in the study to analyze the relative importance of these parameters. Results indicate that the choice of texture feature and window size have higher relative importance in the classification process than quantization level or the choice of image band for extracting texture feature. In case of texture features derived using wavelet decomposed image, the parameter ‘decomposition level’ has almost equal relative importance as the size of moving window and the decomposition of images up to level one is sufficient and there is no need to go for further decomposition. It was also observed that the classification incorporating texture features improves the overall classification accuracy in a statistically significant manner in comparison to pure spectral classification.