468 resultados para advanced metering infrastructure (AMI)
Resumo:
Formal incentives systems aim to encourage improved performance by offering a reward for the achievement of project-specific goals. Despite argued benefits of incentive systems on project delivery outcomes, there remains debate over how incentive systems can be designed to encourage the formation of strong project relationships within a complex social system such as an infrastructure project. This challenge is compounded by the increasing emphasis in construction management research on the important mediating influence of technical and organisational context on project performance. In light of this challenge, the research presented in this paper focuses on the design of incentive systems in four infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on a motivational theory frame, a cross case analysis is conducted to examine differences and similarities across social and cultural drivers impacting on the effectiveness of the incentive systems in light of infrastructure project context. Despite significant differences in case project characteristics, results indicate the projects’ experience similar social drivers impacting on incentive effectiveness. Significant value across the projects was placed on: varied performance goals and multiple opportunities to across the project team to pursue incentive rewards; fair risk allocation across contract parties; value-driven tender selection; improved design-build integration; and promotion of future work opportunities. However, differences across the contexts were identified. Results suggest future work opportunities were a more powerful social driver in upholding reputation and establishing strong project relationships in the Australian context. On the other hand, the relationship initiatives in the Dutch context seemed to be more broadly embraced resulting in a greater willingness to collaboratively manage project risk. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the social and cultural influences on incentive effectiveness across different geographical and contextual boundaries in future research.
Resumo:
In Australia, collaborative contracts have been increasingly used to govern infrastructure projects. These contracts combine formal and informal mechanisms to manage project delivery. Formal mechanisms (e.g. financial risk sharing) are specified in the contract, while informal mechanisms (e.g. integrated team) are not. The paper reports on a literature review to operationalise the concepts of formal and informal governance, as the literature contains a multiplicity of, often un-testable, definitions. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operatinalise formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Formal governance mechanisms were found to be usefully broken down into four measurable categories: (1) target cost arrangement (2) financial risk and reward sharing regime (3) transparent financials and (4) collaborative multi-party agreement Informal governance mechanisms were found to be usefully broken down into three measurable categories: (1) leadership structure (2) integrated team (3) joint management system We expect these categories to effectively capture the key governance drivers of outcomes on infrastructure projects. These categories will be further refined and broken down into individual governance mechanisms for assessment through a large-scale Australian survey planned for late 2012. These individual mechanisms will feature in the questionnaire that QUT will deliver to AAA in October 2012.
Resumo:
Direct writing melt electrospinning is an additive manufacturing technique capable of the layer-by-layer fabrication of highly ordered 3d tissue engineering scaffolds from micron-diameter fibres. The utility of these scaffolds, however, is limited by the maximum achievable height of controlled fibre deposition, beyond which the structure becomes increasingly disordered. A source of this disorder is charge build-up on the deposited polymer producing unwanted coulombic forces. In this study we introduce a novel melt electrospinning platform with dual voltage power supplies to reduce undesirable charge effects and improve fibre deposition control. We produced and characterised several 90° cross-hatched fibre scaffolds using a range of needle/collector plate voltages. Fibre thickness was found to be sensitive only to overall potential and invariant to specific tip/collector voltage. We also produced ordered scaffolds up to 200 layers thick (fibre spacing 1 mm, diameter 40 μm) and characterised structure in terms of three distinct zones; ordered, semi-ordered and disordered. Our in vitro analysis indicates successful cell attachment and distribution throughout the scaffolds, with little evidence of cell death after seven days. This study demonstrates the importance of electrostatic control for reducing destabilising polymer charge effects and enabling the fabrication of morphologically suitable scaffolds for tissue engineering.
Resumo:
This thesis advances the understanding of the impact of developer infrastructure charges on housing affordability in Brisbane, Australia through the development of an econometric model and empirical analysis. The results indicate substantial on-passing of these government charges to purchasers of both new and existing homes, thus negatively impacting housing affordability across the whole community. The results of this thesis will inform policy makers and assist in the development of evidence based policy related to housing affordability and funding of urban infrastructure. Being generic, the econometric model is expected to be a tool that is suitable for estimating similar house price effects in other housing markets.
Resumo:
The Distributed Network Protocol v3.0 (DNP3) is one of the most widely used protocols, to control national infrastructure. Widely used interactive packet manipulation tools, such as Scapy, have not yet been augmented to parse and create DNP3 frames (Biondi 2014). In this paper we extend Scapy to include DNP3, thus allowing us to perform attacks on DNP3 in real-time. Our contribution builds on East et al. (2009), who proposed a range of possible attacks on DNP3. We implement several of these attacks to validate our DNP3 extension to Scapy, then executed the attacks on real world equipment. We present our results, showing that many of these theoretical attacks would be unsuccessful in an Ethernet-based network.
Resumo:
Urban green infrastructure can help cities adapt to climate change. Spatial planning can play an important role in utilizing green infrastructure for adaptation. Yet climate change risks represent a different sort of challenge for planning institutions. This paper aims to address two issues arising from this challenge. First, it defines the concept of green infrastructure within the context of climate adaptation. Second, it identifies and puts into perspective institutional barriers to adopting green infrastructure for climate adaptation, including path dependence. We begin by arguing that there is growing confusion among planners and policy makers about what constitutes green infrastructure. Definitional ambiguity may contribute to inaction on climate change adaptation, because it muddies existing programs and initiatives that are to do with green-space more broadly, which in turn feeds path dependency. We then report empirical findings about how planners perceive the institutional challenge arising from climate change and the adoption of green infrastructure as an adaptive response. The paper concludes that spatial planners generally recognize multiple rationales associated with green infrastructure. However they are not particularly keen on institutional innovation and there is a tendency for path dependence. We propose a conceptual model that explicitly recognizes such institutional factors. This paper contributes to the literature by showing that agency and institutional dimensions are a limiting factor in advancing the concept of green infrastructure within the context of climate change adaptation.
Resumo:
Aim: In 2013 QUT introduced the Medical Imaging Training Immersive Environment (MITIE) as a virtual reality (VR) platform that allowed students to practice general radiography. The system software has been expanded to now include C-Arm. The aim of this project was to investigate the use of this technology in the pedagogy of undergraduate medical imaging students who have limited to no experience in the use of the C-Arm clinically. Method: The Medical Imaging Training Immersive Environment (MITIE) application provides students with realistic and fully interactive 3D models of C-Arm equipment. As with VR initiatives in other health disciplines (1–2) the software mimics clinical practice as much as possible and uses 3D technology to enhance 3D spatial awareness and realism. The application allows students to set up and expose a virtual patient in a 3D environment as well as creating the resultant “image” for comparison with a gold standard. Automated feedback highlights ways for the student to improve their patient positioning, equipment setup or exposure factors. The students' equipment knowledge was tested using an on line assessment quiz and surveys provided information on the students' pre-clinical confidence scale, with post-clinical data comparisons. Ethical approval for the project was provided by the university ethics panel. Results: This study is currently under way and this paper will present analysis of initial student feedback relating to the perceived value of the application for confidence in a high risk environment (i.e. operating theatre) and related clinical skills development. Further in-depth evaluation is ongoing with full results to be presented. Conclusion: MITIE C-Arm has a development role to play in the pre-clinical skills training for Medical Radiation Science students. It will augment their theoretical understanding prior to their clinical experience. References 1. Bridge P, Appleyard R, Ward J, Phillips R, Beavis A. The development and evaluation of a virtual radiotherapy treatment machine using an immersive visualisation environment. Computers and Education 2007; 49(2): 481–494. 2. Gunn T, Berry C, Bridge P et al. 3D Virtual Radiography: Development and Initial Feedback. Paper presented at the 10th Annual Scientific Meeting of Medical Imaging and Radiation Therapy, March 2013 Hobart, Tasmania.
Resumo:
The Advanced Pharmacy Practice Framework Steering Committee (now replaced by the Pharmacy Practitioner Development Committee) undertook work to develop an advanced pharmacy practice recognition model. As part of that work, and to assure clarity and consistency in the terminology it uses, the Committee collated the definitions used in literature sources consulted. Most recently, this involved a review of the meaning attributed to the terms ‘advanced’ and ‘extended’ when used in the context of describing aspects of professional practice. Both terms encompass the acquisition of additional expertise. While ‘advanced’ practice involves the acquisition of additional expertise to achieve a higher performance level, ‘extended’ practice relates specifically to scope of practice and involves the acquisition of additional expertise sufficient to provide services or perform tasks that are outside the usual scope of practice of the profession. Performance level operates independently of scope of practice but both must be elucidated to fully describe the professional practice of an individual practitioner.