517 resultados para Integrated problems
Resumo:
Changes in the construction sector are creating opportunities in research to maximise the benefits of those changes and to continue the exciting developments in improved people skills, new processes and developing technologies. Many research centres around the world are investigating aspects of the current changes to drive their particular expertise forward. However, the CIB Integrated Design and Delivery Solutions (IDDS) priority research theme takes a higher-level view of the changes and then focuses down on a prioritised set of research targets. These targets have been investigated, re-focussed and validated over a period of four years through many workshops, conferences and meetings by a wide ranging group of representatives from approximately 90 industry and research organisations. The outcomes of such research, once put into practice should be significantly shortened timespans from conception of need to occupation of new or revised structures. As time is money, the owners will get their investments into productive use sooner, which means a shorter payback time. In addition, there will inevitably be a reduction in construction costs as productivity increases. The improvements in reliable delivery and improved quality currently being seen in relatively simplistic use of Building information Modelling (BIM) (compared to full IDDS) will inevitably continue its on-going trajectory of improvement. We should also consider the wider economic contribution to society that will stem from such improvements and, finally, and by no means unimportantly, the reliable modelling and delivery of sustainability at both the building and estate/ area scale will significantly improve carbon footprints and other sustainable outcomes. Whilst there are huge opportunities for early adopters, the primary risk will be the expansion of the gap between those working in this way and those who are not so advanced or who even refuse to progress . The opportunities to address the significant and widely varying wastes within the structure of the construction sector and within and across projects are huge and timely and industry is encouraged to become involved.
Resumo:
Integrated design and delivery solutions (IDDS) is a priority theme of the International Council for Research and Innovation in Building and Construction (CIB), which will be used to drive the global research agenda forward. IDDS will use collaborative work processes and enhanced skills together with integrated data, information and knowledge management to minimize structural and process inefficiencies and to enhance the value delivered during design, build, operation, and across projects. IDDS build on building information modelling (BIM), incorporating advances in the training and employment of people, together with supporting new technologies. The successful use of IDDS involves changes in each of the project phases from conceptual planning and business case formulation to all stages of the supply chain: design, construction, commissioning, operation, retrofit and decommissioning. For each of these phases, key changes in the structure and culture of the project team across the different collaborating firms create a favourable context for IDDS. Special for IDDS thinking is the idea of adding project and whole-life value in all phases, for all stakeholders...
Resumo:
A new approach of integrated design and delivery solutions (IDDS) aims to radically improve the performance of the construction industries. IDDS builds upon recent trends in the construction industries that have seen the widespread adoption of technologies such as building information modelling (BIM) and innovative processes such as integrated project delivery. However, these innovations are seen to develop in isolation, with little consideration of the overarching interactions between people, process and technology. The IDDS approach is holistic in that it recognizes that it is only through a combination of initiatives such as skill development, process re-engineering, responsive information technology, enhanced interoperability and integrating knowledge management, among others, that radical change can be achieved. To implement IDDS requires step changes in many project aspects, and this gap between current performance and that required for IDDS is highlighted. The research required to bridge the gaps is identified in four major aspects of collaborative processes, workforce skills, integrated information and knowledge management.
Resumo:
CIB is developing a priority theme, now termed Improving Construction and Use through Integrated Design & Delivery Solutions (IDDS). The IDDS working group for this theme adopted the following definition: Integrated Design and Delivery Solutions use collaborative work processes and enhanced skills, with integrated data, information, and knowledge management to minimize structural and process inefficiencies and to enhance the value delivered during design, build, and operation, and across projects. The design, construction, and commissioning sectors have been repeatedly analysed as inefficient and may or may not be quite as bad as portrayed; however, there is unquestionably significant scope for IDDS to improve the delivery of value to clients, stakeholders (including occupants), and society in general, simultaneously driving down cost and time to deliver operational constructed facilities. Although various initiatives developed from computer‐aided design and manufacturing technologies, lean construction, modularization, prefabrication and integrated project delivery are currently being adopted by some sectors and specialisations in construction; IDDS provides the vision for a more holistic future transformation. Successful use of IDDS requires improvements in work processes, technology, and people’s capabilities to span the entire construction lifecycle from conception through design, construction, commissioning, operation, refurbishment/ retrofit and recycling, and considering the building’s interaction with its environment. This vision extends beyond new buildings to encompass modifications and upgrades, particularly those aimed at improved local and area sustainability goals. IDDS will facilitate greater flexibility of design options, work packaging strategies and collaboration with suppliers and trades, which will be essential to meet evolving sustainability targets. As knowledge capture and reuse become prevalent, IDDS best practice should become the norm, rather than the exception.
Resumo:
Changes in the construction sector are creating opportunities in research to maximise the benefits of those changes and to continue the exciting developments in improved people skills, new processes and developing technologies. There are many research centres around the world investigating aspects of the current changes to drive their particular expertise forward. However, the CIB Integrated Design and Delivery Solutions (IDDS) priority research theme takes a higher-level view of the changes and then focuses down on a prioritised set of research targets. These targets have been investigated, re-focussed and validated over a period of four years through many workshops, conferences and meetings by a wide ranging group of representatives from approximately 90 industry and research organisations. This roadmap prioritises and details the research to be performed, why and by whom. In particular, some 25 CIB Working Commissions and Task Groups are explained as having potential roles in the delivery of this research theme. We are extremely privileged to have been urged on by such distinguished construction professionals in their forewords and the case for research. The outcomes of such research, once put into practice should be significantly shortened timespans from conception of need to occupation of new or revised structures. As time is money, the owners will get their investments into productive use sooner, which means a shorter payback time. In addition, there will inevitably be a reduction in construction costs as productivity increases. The improvements in reliable delivery and improved quality currently being seen in relatively simplistic use of Building information Modelling (BIM) (compared to full IDDS) will inevitably continue its on-going trajectory of improvement. We should also consider the wider economic contribution to society that will stem from such improvements and, finally, and by no means unimportantly, the reliable modelling and delivery of sustainability at both the building and estate/ area scale will significantly improve carbon footprints and other sustainable outcomes. Whilst there are huge opportunities for early adopters, the primary risk will be the expansion of the gap between those working in this way and those who are not so advanced or who even refuse to progress1. However, a similar issue arises between industry, clients, educators and trainers; the latter have particular challenges, having existed for many years in a sector that has had relatively few technological changes. However, the opportunities to address the significant and widely varying wastes within the structure of the construction sector and within and across projects are huge and timely. Whilst this Roadmap is specifically targeted at the Standing Commissions and Task Groups of the CIB, it is hoped that there are elements for research and applied research across academia and industry.
Resumo:
Fluid–Structure Interaction (FSI) problem is significant in science and engineering, which leads to challenges for computational mechanics. The coupled model of Finite Element and Smoothed Particle Hydrodynamics (FE-SPH) is a robust technique for simulation of FSI problems. However, two important steps of neighbor searching and contact searching in the coupled FE-SPH model are extremely time-consuming. Point-In-Box (PIB) searching algorithm has been developed by Swegle to improve the efficiency of searching. However, it has a shortcoming that efficiency of searching can be significantly affected by the distribution of points (nodes in FEM and particles in SPH). In this paper, in order to improve the efficiency of searching, a novel Striped-PIB (S-PIB) searching algorithm is proposed to overcome the shortcoming of PIB algorithm that caused by points distribution, and the two time-consuming steps of neighbor searching and contact searching are integrated into one searching step. The accuracy and efficiency of the newly developed searching algorithm is studied on by efficiency test and FSI problems. It has been found that the newly developed model can significantly improve the computational efficiency and it is believed to be a powerful tool for the FSI analysis.
Interaction of psychosocial risk factors explain increased neck problems among female office workers
Resumo:
This study investigated the relationship between psychosocial risk factors and (1) neck symptoms and (2) neck pain and disability as measured by the neck disability index (NDI). Female office workers employed in local private and public organizations were invited to participate, with 333 completing a questionnaire. Data were collected on various risk factors including age, negative affectivity, history of previous neck trauma, physical work environment, and task demands. Sixty-one percent of the sample reported neck symptoms lasting greater than 8 days in the last 12 months. The mean NDI of the sample was 15.5 out of 100, indicating mild neck pain and disability. In a hierarchical multivariate logistic regression, low supervisor support was the only psychosocial risk factor identified with the presence of neck symptoms. Similarly, low supervisor support was the only factor associated with the score on the NDI. These associations remained after adjustment for potential confounders of age, negative affectivity, and physical risk factors. The interaction of job demands, decision authority, and supervisor support was significantly associated with the NDI in the final model and this association increased when those with previous trauma were excluded. Interestingly, and somewhat contrary to initial expectations, as job demands increased, high decision authority had an increasing effect on the NDI when supervisor support was low.
Resumo:
Research shows that approximately half of creative practitioners operate as embedded creatives by securing gainful employment within organisations located in the field beyond their core discipline. This foregrounds the significance of having the skills necessary to successfully cross the disciplinary boundaries in order to negotiate a professional role. The multiple implications of such reframing for emerging creative practitioners who navigate uncertain professional boundaries include developing a skill of identifying and successfully targeting the shifting professional and industry coordinates while remaining responsive to changes. A further implication involves creative practitioners engaging in a continuous cycle of re-negotiation of their professional identity making the management of multiple professional selves - along with creating and recreating a meaningful frame of references such as the language around their emerging practice - a necessary skill. This chapter presents a case study of a set of Work Integrated Learning subjects designed to develop in creative industries practitioners the skills to manage their emerging professional identities in response to the shifts in the professional world.
Resumo:
SMA members Neville Owen, Adrian Bauman, Wendy Brown and Stewart Trost have recently been awarded two NHMRC grants for research which will focus on understanding and influencing physical activity to improve population health outcomes. They were awarded under the Capital Building for Population Health scheme and the Program Grants scheme. The total value of the grants is 86.5 million over five years. The new grants will allow the researchers to conduct rigorous behavioural and epidemiological research which will inform the development of innovative primary and secondary prevention initiatives and determine their effectiveness. This is important, because physical activity is significantly implicated in the prevention and management of established chronic health problems such as cardiovascular disease, type 2 diabetes, osteoporosis and some forms of cancer. It also has a key role to play in addressing the growing epidemic of childhood and adult obesity, and in the maintenance of functional well-being with age. However, in recent years, physical activity levels in Australia have declined, indicating that the net sum of all our efforts to encourage physical activity participation require renewed and innovative efforts. The proposed research programs will be based on the researchers' cross-disciplinary backgrounds in exercise physiology, psychology, health promotion and epidemiology, and will be integrated across four main domains:..
Resumo:
This paper considers two problems that frequently arise in dynamic discrete choice problems but have not received much attention with regard to simulation methods. The first problem is how to simulate unbiased simulators of probabilities conditional on past history. The second is simulating a discrete transition probability model when the underlying dependent variable is really continuous. Both methods work well relative to reasonable alternatives in the application discussed. However, in both cases, for this application, simpler methods also provide reasonably good results.
Resumo:
This article addresses the questions of whether there are motivational deficits in children with intellectual disabilities, whether those with Down syndrome are more likely to display motivational deficits, and how motivation might be supported. The available literature that has examined motivation in children with intellectual disabilities was considered and integrated to address the questions outlined above. There is little published research on this vital topic. Reports on motivational problems differ depending upon the method of data collection. Observational studies using structured tasks generally reveal no differences between children with intellectual disabilities and typically developing children matched for mental age. When reports of parents or teachers are used, children with intellectual disabilities appear to have deficits in motivation. No evidence was found for a particular deficit in children with Down syndrome. The results of this review challenge the perception that children with intellectual disabilities will generally have motivational problems, although it is clear that motivation is a complex construct, not easily examined in those with intellectual disabilities. Strategies for addressing problems and for maintaining motivation, based on theory and evidence, are provided. These strategies are applicable across a range of settings including the home, school, and more adult-oriented services.
Resumo:
Following the derivation of amplitude equations through a new two-time-scale method [O'Malley, R. E., Jr. & Kirkinis, E (2010) A combined renormalization group-multiple scale method for singularly perturbed problems. Stud. Appl. Math. 124, 383-410], we show that a multi-scale method may often be preferable for solving singularly perturbed problems than the method of matched asymptotic expansions. We illustrate this approach with 10 singularly perturbed ordinary and partial differential equations. © 2011 Cambridge University Press.
Resumo:
This paper introduces a straightforward method to asymptotically solve a variety of initial and boundary value problems for singularly perturbed ordinary differential equations whose solution structure can be anticipated. The approach is simpler than conventional methods, including those based on asymptotic matching or on eliminating secular terms. © 2010 by the Massachusetts Institute of Technology.
Resumo:
In this paper we introduce a new technique to obtain the slow-motion dynamics in nonequilibrium and singularly perturbed problems characterized by multiple scales. Our method is based on a straightforward asymptotic reduction of the order of the governing differential equation and leads to amplitude equations that describe the slowly-varying envelope variation of a uniformly valid asymptotic expansion. This may constitute a simpler and in certain cases a more general approach toward the derivation of asymptotic expansions, compared to other mainstream methods such as the method of Multiple Scales or Matched Asymptotic expansions because of its relation with the Renormalization Group. We illustrate our method with a number of singularly perturbed problems for ordinary and partial differential equations and recover certain results from the literature as special cases. © 2010 - IOS Press and the authors. All rights reserved.
Resumo:
The development, operation, and applications of two configurations of an integrated plasma-aided nanofabrication facility (IPANF) comprising low-frequency inductively coupled plasma-assisted, low-pressure, multiple-target RF magnetron sputtering plasma source, are reported. The two configurations of the plasma source have different arrangements of the RF inductive coil: a conventional external flat spiral "pancake" coil and an in-house developed internal antenna comprising two orthogonal RF current sheets. The internal antenna configuration generates a "unidirectional" RF current that deeply penetrates into the plasma bulk and results in an excellent uniformity of the plasma over large areas and volumes. The IPANF has been employed for various applications, including low-temperature plasma-enhanced chemical vapor deposition of vertically aligned single-crystalline carbon nanotips, growth of ultra-high aspect ratio semiconductor nanowires, assembly of optoelectronically important Si, SiC, and Al1-xInxN quantum dots, and plasma-based synthesis of bioactive hydroxyapatite for orthopedic implants.