658 resultados para IT infrastructure management
Resumo:
Previous studies exploring the incidence and readmission rates of cardiac patients admitted to a coronary care unit (CCU) with type 2 diabetes [1] have been undertaken by the first author. Interviews of these patients regarding their experiences in managing their everyday conditions [2] provided the basis for developing the initial cardiac–diabetes self-management programme (CDSMP) [3]. Findings from each of these previous studies highlighted the complexity of self-management for patients with both conditions and contributed to the creation of a new self-management programme, the CDSMP, based on Bandura’s (2004) self-efficacy theory [4]. From patient and staff feedback received for the CDSMP [3], it became evident that further revision of the programme was needed to improve self-management levels of patients and possibility of incorporating methods of information technology (IT). Little is known about the applicability of different methods of technology for delivering self-management programmes for patients with chronic diseases such as those with type 2 diabetes and cardiac conditions. Although there is some evidence supporting the benefits and the great potential of using IT in supporting self-management programmes, it is not strong, and further research on the use of IT in such programmes is recommended [5–7]. Therefore, this study was designed to pilot test feasibility of the CDSMP incorporating telephone and text-messaging as follow-up approaches.
Supply chain sustainability : a relationship management approach moderated by culture and commitment
Resumo:
This research explores the nature of relationship management on construction projects in Australia and examines the effects of culture, by means of Schwarz’s value survey, on relationships under different contract strategies. The research was based on the view that the development of a sustainable supply chain depends on the transfer of knowledge and capabilities from the larger players in the supply chain through collaboration brought about by relationship management. The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the findings. The aim was to investigate how values and attitudes enhance or reduce the incorporation of the supply chain into the project. From the research it was found that the degree of match and mismatch between values and contract strategy impacts commitment and the engagement and empowerment of the supply chain.
Resumo:
The focus of the present research was to investigate how Local Governments in Queensland were progressing with the adoption of delineated DM policies and supporting guidelines. The study consulted Local Government representatives and hence, the results reflect their views on these issues. Is adoption occurring? To what degree? Are policies and guidelines being effectively implemented so that the objective of a safer, more resilient community is being achieved? If not, what are the current barriers to achieving this, and can recommendations be made to overcome these barriers? These questions defined the basis on which the present study was designed and the survey tools developed. While it was recognised that LGAQ and Emergency Management Queensland (EMQ) may have differing views on some reported issues, it was beyond the scope of the present study to canvass those views. The study resolved to document and analyse these questions under the broad themes of: • Building community capacity (notably via community awareness). • Council operationalisation of DM. • Regional partnerships (in mitigation/adaptation). Data was collected via a survey tool comprising two components: • An online questionnaire survey distributed via the LGAQ Disaster Management Alliance (hereafter referred to as the “Alliance”) to DM sections of all Queensland Local Government Councils; and • a series of focus groups with selected Queensland Councils
Resumo:
Business Process Management (BPM) is a top priority in organisations and is rapidly proliferating as an emerging discipline in practice. However, the current studies show lack of appropriate BPM skilled professionals in the field and a dearth of opportunities to develop BPM expertise. This paper analyses the gap between available BPM-related education in Australia and required BPM capabilities. BPM courses offered by Australian universities and training institutions have been critically analysed and mapped against leading BPM capability frameworks to determine how well current BPM education and training offerings in Australia actually address the core capabilities required for BPM professionals. The outcomes reported here can be used by Australian universities and training institutions to better align and position their training materials to the BPM required capabilities. It could also be beneficial to individuals looking for a systematic and in-depth understanding of BPM capabilities and trainings.
Resumo:
Participatory sensing enables collection, processing, dissemination and analysis of environmental sensory data by ordinary citizens, through mobile devices. Researchers have recognized the potential of participatory sensing and attempted applying it to many areas. However, participants may submit low quality, misleading, inaccurate, or even malicious data. Therefore, finding a way to improve the data quality has become a significant issue. This study proposes using reputation management to classify the gathered data and provide useful information for campaign organizers and data analysts to facilitate their decisions.
Resumo:
In the networked information driven world that we now inhabit the ability to access and reuse information, data and culture is a key ingredient to social, economic and cultural innovation. As government holds enormous amounts of publicly funded material that can be released to the public without breaching the law it should move to implement policies that will allow better access to and reuse of that information, knowledge and culture. The Queensland Government Information Licensing Framework (GILF) Project4 is one of the first projects in the world to systemically approach this issue and should be consulted as a best practice model.
Resumo:
Public awareness of large infrastructure projects, many of which are delivered through networked arrangements is high for several reasons. These projects often involve significant public investment; they may involve multiple and conflicting stakeholders and can potentially have significant environmental impacts (Lim and Yang, 2008). To produce positive outcomes from infrastructure delivery it is imperative that stakeholder “buy in” be obtained particularly about decisions relating to the scale and location of infrastructure. Given the likelihood that stakeholders will have different levels of interest and investment in project outcomes, failure to manage this dynamic could potentially jeopardise project delivery by delaying or halting the construction of essential infrastructure. Consequently, stakeholder engagement has come to constitute a critical activity in infrastructure development delivered through networks. This paper draws on stakeholder theory and governance network theory and provides insights into how three multi-level networks within the Roads Alliance in Queensland engage with stakeholders in the delivery of road infrastructure. New knowledge about stakeholders has been obtained by testing a model of Stakeholder Salience and Engagement which combines and extends the stakeholder identification and salience theory and the ladder of stakeholder management and engagement. By applying this model, the broad research question: “How do governance networks engage with stakeholders?” has been addressed. A multiple embedded case study design was selected as the overall approach to explore, describe, explain and evaluate how stakeholder engagement occurred in three governance networks delivering road infrastructure in Queensland. The outcomes of this research contribute to and extend stakeholder theory by showing how stakeholder salience impacts on decisions about the types of engagement processes implemented. Governance network theory is extended by showing how governance networks interact with stakeholders. From a practical perspective this research provides governance networks with an indication of how to more effectively undertake engagement with different types of stakeholders.
Resumo:
This paper presents the historical and contextual background of road construction by state and local government in Queensland. It also highlights some key events that have shaped stakeholder participation in road infrastructure planning and delivery in Queensland. This synthesis was developed from a review of publications, organisational documents and interviews. To set the scene, the factors that shaped road delivery will be discussed.
Resumo:
This paper reports on the development of a tool that generates randomised, non-multiple choice assessment within the BlackBoard Learning Management System interface. An accepted weakness of multiple-choice assessment is that it cannot elicit learning outcomes from upper levels of Biggs’ SOLO taxonomy. However, written assessment items require extensive resources for marking, and are susceptible to copying as well as marking inconsistencies for large classes. This project developed an assessment tool which is valid, reliable and sustainable and that addresses the issues identified above. The tool provides each student with an assignment assessing the same learning outcomes, but containing different questions, with responses in the form of words or numbers. Practice questions are available, enabling students to obtain feedback on their approach before submitting their assignment. Thus, the tool incorporates automatic marking (essential for large classes), randomised tasks to each student (reducing copying), the capacity to give credit for working (feedback on the application of theory), and the capacity to target higher order learning outcomes by requiring students to derive their answers rather than choosing them. Results and feedback from students are presented, along with technical implementation details.
Resumo:
As a resilience enhancing practice, business continuity management (BCM) can play an important role in aiding preparation of the insurance industry for coping with the losses incurred by major discontinuity incidents: regardless of cause. Acknowledging the increasing frequency of unpredictable man-made disasters and natural catastrophes, the insurance industry would benefit from examining and implementing, where suitable, key elements of BCM. Such strategic decisions would assist insurers and re-insurers collectively to enhance mutual capability to respond to, and recover from, the impact of significant losses. This paper presents a comparison of opinions about BCM practitioners in both retail and re-insurance companies on the importance of generic continuity practices with actual levels of BCM practice across the two industry groups in Southeast Asia. It suggests means by which multi-lateral cooperation across Asian economies and between retail and re-insurance market segments might enhance the viability of the insurance industry in the face of increased stress from major natural and socio-technical hazards.
Resumo:
The literature abounds with descriptions of failures in high-profile projects and a range of initiatives has been generated to enhance project management practice (e.g., Morris, 2006). Estimating from our own research, there are scores of other project failures that are unrecorded. Many of these failures can be explained using existing project management theory; poor risk management, inaccurate estimating, cultures of optimism dominating decision making, stakeholder mismanagement, inadequate timeframes, and so on. Nevertheless, in spite of extensive discussion and analysis of failures and attention to the presumed causes of failure, projects continue to fail in unexpected ways. In the 1990s, three U.S. state departments of motor vehicles (DMV) cancelled major projects due to time and cost overruns and inability to meet project goals (IT-Cortex, 2010). The California DMV failed to revitalize their drivers’ license and registration application process after spending $45 million. The Oregon DMV cancelled their five year, $50 million project to automate their manual, paper-based operation after three years when the estimates grew to $123 million; its duration stretched to eight years or more and the prototype was a complete failure. In 1997, the Washington state DMV cancelled their license application mitigation project because it would have been too big and obsolete by the time it was estimated to be finished. There are countless similar examples of projects that have been abandoned or that have not delivered the requirements.
Resumo:
In recent years social technologies such as wikis, blogs or microblogging have seen an exponential growth in the uptake of their user base making this type of technology one of the most significant networking and knowledge sharing platforms for potentially hundreds of millions of users. However, the adoption of these technologies has been so far mostly for private purposes. First attempts have been made to embed features of social technologies in the corporate IT landscape, and Business Process Management is no exception. This paper aims to consolidate the opportunities for integrating social technologies into the different stages of the business process lifecycle. Thus, it contributes to a conceptualization of this fast growing domain, and can help to categorize academic and corporate development activities.
Resumo:
This panel discusses the impact of Green IT on information systems and how information systems can meet environmental challenges and ensure sustainability. We wish to highlight the role of green business processes, and specifically the contributions that the management of these processes can play in leveraging the transformative power of IS in order to create an environmentally sustainable society. The management of business processes has typically been thought of in terms of business improvement alongside the dimensions time, cost, quality, or flexibility – the so-called ‘devil’s quadrangle’. Contemporary organizations, however, increasingly become aware of the need to create more sustainable, IT-enabled business processes that are also successful in terms of their economic, ecological, as well as social impact. Exemplary ecological key performance indicators that increasingly find their way into the agenda of managers include carbon emissions, data center energy, or renewable energy consumption (SAP 2010). The key challenge, therefore, is to extend the devil’s quadrangle to a devil’s pentagon, including sustainability as an important fifth dimension in process change.
Resumo:
Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). The paper begins with an update on a key development in a new early/first-order procurement decision making model that deploys production cost/benefit theory and theories concerning transaction costs from the New Institutional Economics, in order to identify a procurement mode that is likely to deliver the best ratio of production costs and transaction costs to production benefits, and therefore deliver superior VfM relative to alternative procurement modes. In doing so, the new procurement model is also able to address the uncertainty concerning the relative merits of Public-Private Partnerships (PPP) and non-PPP procurement approaches. The main aim of the paper is to develop competition as a dependent variable/proxy for VfM and a hypothesis (overarching proposition), as well as developing a research method to test the new procurement model. Competition reflects both production costs and benefits (absolute level of competition) and transaction costs (level of realised competition) and is a key proxy for VfM. Using competition as a proxy for VfM, the overarching proposition is given as: When the actual procurement mode matches the predicted (theoretical) procurement mode (informed by the new procurement model), then actual competition is expected to match potential competition (based on actual capacity). To collect data to test this proposition, the research method that is developed in this paper combines a survey and case study approach. More specifically, data collection instruments for the surveys to collect data on actual procurement, actual competition and potential competition are outlined. Finally, plans for analysing this survey data are briefly mentioned, along with noting the planned use of analytical pattern matching in deploying the new procurement model and in order to develop the predicted (theoretical) procurement mode.
Resumo:
The major purpose of Vehicular Ad Hoc Networks (VANETs) is to provide safety-related message access for motorists to react or make a life-critical decision for road safety enhancement. Accessing safety-related information through the use of VANET communications, therefore, must be protected, as motorists may make critical decisions in response to emergency situations in VANETs. If introducing security services into VANETs causes considerable transmission latency or processing delays, this would defeat the purpose of using VANETs to improve road safety. Current research in secure messaging for VANETs appears to focus on employing certificate-based Public Key Cryptosystem (PKC) to support security. The security overhead of such a scheme, however, creates a transmission delay and introduces a time-consuming verification process to VANET communications. This paper proposes an efficient public key management system for VANETs: the Public Key Registry (PKR) system. Not only does this paper demonstrate that the proposed PKR system can maintain security, but it also asserts that it can improve overall performance and scalability at a lower cost, compared to the certificate-based PKC scheme. It is believed that the proposed PKR system will create a new dimension to the key management and verification services for VANETs.