985 resultados para Enrollment Management
Resumo:
Where airports were once the sole responsibility of their governments, liberalisation of economies has seen administrative interests in airport spaces divested increasingly towards market led authority. Extant literature suggests that actions in decision spaces can be described under broad idealised forms of governance. However in looking at a sample of 18 different airports it is apparent that these classic models are insufficient to appreciate the contextual complexity of each case. Issues of institutional arrangements, privatisation, and management focus are reviewed against existing governance modes to produce a model for informing privatisation decisions, based on the contextual needs of the individual airport and region. Expanding governance modes to include emergent airport arrangements both contribute to the existing literature, and provides a framework to assist policy makers and those charged with the operation of airports to design effective governance models. In progressing this framework, contributions are made to government decision makers for the development of new, or review of existing strategies for privatisation, while the private sector can identify the intent and expectations of privatisation initiatives to make better informed decisions.
Resumo:
The low stream salinity naturally in the Nebine-Mungallala Catchment, extent of vegetation retention, relatively low rainfall and high evaporation indicates that there is a relatively low risk of rising shallow groundwater tables in the catchment. Scalding caused by wind and water erosion exposing highly saline sub-soils is a more important regional issue, such as in the Homeboin area. Local salinisation associated with evaporation of bore water from free flowing bore drains and bores is also an important land degradation issue particularly in the lower Nebine, Wallam and Mungallala Creeks. The replacement of free flowing artesian bores and bore drains with capped bores and piped water systems under the Great Artesian Basin bore rehabilitation program is addressing local salinisation and scalding in the vicinity of bore drains and preventing the discharge of saline bore water to streams. Three principles for the prevention and control of salinity in the Nebine Mungallala catchment have been identified in this review: • Avoid salinity through avoiding scalds – i.e. not exposing the near-surface salt in landscape through land degradation; • Riparian zone management: Scalding often occurs within 200m or so of watering lines. Natural drainage lines are most likely to be overstocked, and thus have potential for scalding. Scalding begins when vegetation is removed, and without that binding cover, wind and water erosion exposes the subsoil; and • Monitoring of exposed or grazed soil areas. Based on the findings of the study, we make the following recommendations: 1. Undertake a geotechnical study of existing maps and other data to help identify and target areas most at risk of rising water tables causing salinity. Selected monitoring should then be established using piezometers as an early warning system. 2. SW NRM should financially support scald reclamation activity through its various funding programs. However, for this to have any validity in the overall management of salinity risk, it is critical that such funding require the landholder to undertake a salinity hazard/risk assessment of his/her holding. 3. A staged approach to funding may be appropriate. In the first instance, it would be reasonable to commence funding some pilot scald reclamation work with a view to further developing and piloting the farm hazard/risk assessment tools, and exploring how subsequent grazing management strategies could be incorporated within other extension and management activities. Once the details of the necessary farm level activities have been more clearly defined, and following the outcomes of the geotechnical review recommended above, a more comprehensive funding package could be rolled out to priority areas. 4. We recommend that best-practice grazing management training currently on offer should be enhanced with information about salinity risk in scald-prone areas, and ways of minimising the likelihood of scald formation. 5. We recommend that course material be developed for local students in Years 6 and 7, and that arrangements be made with local schools to present this information. Given the constraints of existing syllabi, we envisage that negotiations may have to be undertaken with the Department of Education in order for this material to be permitted to be used. We have contact with key people who could help in this if required. 6. We recommend that SW NRM continue to support existing extension activities such as Grazing Land Management and the Monitoring Made Easy tools. These aids should be able to be easily expanding to incorporate techniques for monitoring, addressing and preventing salinity and scalding. At the time of writing staff of SW NRM were actively involved in this process. It is important that these activities are adequately resourced to facilitate the uptake by landholders of the perception that salinity is an issue that needs to be addressed as part of everyday management. 7. We recommend that SW NRM consider investing in the development and deployment of a scenario-modelling learning support tool as part of the awareness raising and education activities. Secondary salinity is a dynamic process that results from ongoing human activity which mobilises and/or exposes salt occurring naturally in the landscape. Time scales can be short to very long, and the benefits of management actions can similarly have immediate or very long time frames. One way to help explain the dynamics of these processes is through scenario modelling.
Resumo:
This article examined the relationship between time structure and Macan's process model of time management. This study proposed that time structure—‘appraisal of effective time usage’—would be a more parsimonious mediator than perceived control over time in the relationship between time management behaviours and outcome variables, such as job satisfaction and psychological well-being. Alternative structure models were compared using a sample of 111 university students. Model 1 tested Macan's process model of time management with perceived control over time as the mediator. Model 2 replaced perceived control over time by the construct of time structure. Model 3 examined the possibility of perceived control over time and time structure as being parallel mediators of the relationships between time management and outcomes. Results of this study showed that Model 1 and Model 2 fitted the data equally well. On the other hand, the mediated effects were small and partial in both models. This pattern of results calls for reassessment of the process model.
Resumo:
know personally. They also communicate with other members of the network who are the friends of their friends and may be friends of their friend’s network. They share their experiences and opinions within the social network about an item which may be a product or service. The user faces the problem of evaluating trust in a service or service provider before making a choice. Opinions, reputations and ecommendations will influence users' choice and usage of online resources. Recommendations may be received through a chain of friends of friends, so the problem for the user is to be able to evaluate various types of trust recommendations and reputations. This opinion or ecommendation has a great influence to choose to use or enjoy the item by the other user of the community. Users share information on the level of trust they explicitly assign to other users. This trust can be used to determine while taking decision based on any recommendation. In case of the absence of direct connection of the recommender user, propagated trust could be useful.
Resumo:
Sustainable practices are more than ever on the radar screen of organizations, triggered by a growing demand of the wider population towards approaches and practices that can be considered "green" or "sustainable". Our specific intent with this call for action is to immerse deeper into the role of business processes, and specifically the contributions that the management of these processes can play in leveraging the transformative power of information systems (IS) in order to create environmentally sustainable organizations. Our key premise is that business and information technology (IT) managers need to engage in a process-focused discussion to enable a common, comprehensive understanding of process, and the process-centered opportunities for making these processes, and ultimately the organization as a process-centric entity, "green". Based on a business process lifecycle model, we propose possible avenues for future research.
Resumo:
This paper describes the background and methodology developed and employed in undertaking research developing a Knowledge Management Strategy for a key construction focused government agency. This paper reviews this methodology and examines a likely Knowledge Management Strategy. Two central objectives structure this Case Study: 1. Identify categories of important information generated by the Building Division, Queensland Department of Public Works in its service delivery to internal and external stake-holders, and 2. Formulate an appropriate and targeted Knowledge Management Strategy to meet the needs of the Queensland Building Capital Works program. The structure of this paper includes: *Description of the Queensland construction industry setting *Review the relevant literature *Design an appropriate research methodology *Analyse results *Formulate conclusions, contributions and implications of the targeted strategy.
Resumo:
National and international competition demands that Australian organisations become more competent at making the strategic technological decisions that impact their future in the international business economy. A new subject unit, Management of Technology is now offered in the popular Master of Project Management and Master of Business Administration programs at the Queensland University of Technology. This cross-disciplinary subject provides students with a theoretical foundation and practical tools to improve the efficiency and competitiveness of technically-oriented organisations. Applied case studies—shown to be the most appropriate mode of learning for mature-age students—form an integral component of the teaching program. In the first offerings of this subject during 1995 and 1996, American case studies were used. QUT has now supported the development of Australian case study packages for technology management through its Teaching and Learning Grants Scheme. The first case developed—Inland Oil Refiners’ Microstill Project—was completed in early 1996. A newly developed case—Automated Door Opening System for Wheelchair Access—is currently being completed. This case (comprising case study documentation and video presentation) tracks a cross-disciplinary product development driven by legislative and community pressures. It also reinforces the importance of personal relationships in the technology and business development that has taken this young Brisbane-based company from its embryonic beginnings on the Queensland Cultural Centre in 1994 to a national and export-focussed organisation in 1997. This paper reviews the need to develop Australian case material in Management of Technology, discusses the case study documentation and supporting video developed, and application of the case study approach in this teaching initiative in QUT’s Master of Project Management and Master of Business Administration programs.
Resumo:
Linking real-time schedulability directly to the Quality of Control (QoC), the ultimate goal of a control system, a hierarchical feedback QoC management framework with the Fixed Priority (FP) and the Earliest-Deadline-First (EDF) policies as plug-ins is proposed in this paper for real-time control systems with multiple control tasks. It uses a task decomposition model for continuous QoC evaluation even in overload conditions, and then employs heuristic rules to adjust the period of each of the control tasks for QoC improvement. If the total requested workload exceeds the desired value, global adaptation of control periods is triggered for workload maintenance. A sufficient stability condition is derived for a class of control systems with delay and period switching of the heuristic rules. Examples are given to demonstrate the proposed approach.
Resumo:
As organizations reach higher levels of Business Process Management maturity, they tend to accumulate large collections of process models. These repositories may contain thousands of activities and be managed by different stakeholders with varying skills and responsibilities. However, while being of great value, these repositories induce high management costs. Thus, it becomes essential to keep track of the various model versions as they may mutually overlap, supersede one another and evolve over time. We propose an innovative versioning model, and associated storage structure, specifically designed to maximize sharing across process models and process model versions, reduce conflicts in concurrent edits and automatically handle controlled change propagation. The focal point of this technique is to version single process model fragments, rather than entire process models. Indeed empirical evidence shows that real-life process model repositories have numerous duplicate fragments. Experiments on two industrial datasets confirm the usefulness of our technique.
Resumo:
"How do you film a punch?" This question can be posed by actors, make-up artists, directors and cameramen. Though they can all ask the same question, they are not all seeking the same answer. Within a given domain, based on the roles they play, agents of the domain have different perspectives and they want the answers to their question from their perspective. In this example, an actor wants to know how to act when filming a scene involving a punch. A make-up artist is interested in how to do the make-up of the actor to show bruises that may result from the punch. Likewise, a director wants to know how to direct such a scene and a cameraman is seeking guidance on how best to film such a scene. This role-based difference in perspective is the underpinning of the Loculus framework for information management for the Motion Picture Industry. The Loculus framework exploits the perspective of agent for information extraction and classification within a given domain. The framework uses the positioning of the agent’s role within the domain ontology and its relatedness to other concepts in the ontology to determine the perspective of the agent. Domain ontology had to be developed for the motion picture industry as the domain lacked one. A rule-based relatedness score was developed to calculate the relative relatedness of concepts with the ontology, which were then used in the Loculus system for information exploitation and classification. The evaluation undertaken to date have yielded promising results and have indicated that exploiting perspective can lead to novel methods of information extraction and classifications.
Resumo:
Since the establishment of the first national strategic development plan in the early 1970s, the construction industry has played an important role in terms of the economic, social and cultural development of Indonesia. The industry’s contribution to Indonesia’s gross domestic product (GDP) increased from 3.9% in 1973 to 7.7% in 2007. Business Monitoring International (2009) forecasts that Indonesia is home to one of the fastest-growing construction industries in Asia despite the average construction growth rate being expected to remain under 10% over the period 2006 – 2010. Similarly, Howlett and Powell (2006) place Indonesia as one of the 20 largest construction markets in 2010. Although the prospects for the Indonesian construction industry are now very promising, many local construction firms still face serious difficulties, such as poor performance and low competitiveness. There are two main reasons behind this problem: the environment that they face is not favourable; the other is the lack of strategic direction to improve competitiveness and performance. Furthermore, although strategic management has now become more widely used by many large construction firms in developed countries, practical examples and empirical studies related to the Indonesian construction industry remain scarce. In addition, research endeavours related to these topics in developing countries appear to be limited. This has potentially become one of the factors hampering efforts to guide Indonesian construction enterprises. This research aims to construct a conceptual model to enable Indonesian construction enterprises to develop a sound long-term corporate strategy that generates competitive advantage and superior performance. The conceptual model seeks to address the main prescription of a dynamic capabilities framework (Teece, Pisano & Shuen, 1997; Teece, 2007) within the context of the Indonesian construction industry. It is hypothesised that in a rapidly changing and varied environment, competitive success arises from the continuous development and reconfiguration of firm’s specific assets achieving competitive advantage is not only dependent on the exploitation of specific assets/capabilities, but on the exploitation of all of the assets and capabilities combinations in the dynamic capabilities framework. Thus, the model is refined through sequential statistical regression analyses of survey results with a sample size of 120 valid responses. The results of this study provide empirical evidence in support of the notion that a competitive advantage is achieved via the implementation of a dynamic capability framework as an important way for a construction enterprise to improve its organisational performance. The characteristics of asset-capability combinations were found to be significant determinants of the competitive advantage of the Indonesian construction enterprises, and that such advantage sequentially contributes to organisational performance. If a dynamic capabilities framework can work in the context of Indonesia, it suggests that the framework has potential applicability in other emerging and developing countries. This study also demonstrates the importance of the multi-stage nature of the model which provides a rich understanding of the dynamic process by which asset-capability should be exploited in combination by the construction firms operating in varying levels of hostility. Such findings are believed to be useful to both academics and practitioners, however, as this research represents a dynamic capabilities framework at the enterprise level, future studies should continue to explore and examine the framework in other levels of strategic management in construction as well as in other countries where different cultures or similar conditions prevails.
Resumo:
The issue of ensuring that construction projects achieve high quality outcomes continues to be an important consideration for key project stakeholders. Although a lot of quality practices have been done within the industry, establishment and achievement of reasonable levels of quality in construction projects continues to be a problem. While some studies into the introduction and development of quality practices and stakeholder management in the construction industry have been undertaken separately, no major studies have so far been completed that examine in depth how quality management practices that specifically address stakeholders’ perspectives of quality can be utilised to contribute to the ultimate constructed quality of projects. This paper encompasses and summarizes a review of the literature related to previous research undertaken on quality within the industry, focuses on the benefits and shortcomings, together with examining the concept of integrating stakeholder perspectives of project quality for improvement of outcomes throughout the project lifecycle. Findings discussed in this paper reveal a pressing need for investigation, development and testing of a framework to facilitate better implementation of quality management practices and thus achievement of better quality outcomes within the construction industry. The framework will incorporate and integrate the views of stakeholders on what constitutes final project quality to be utilised in developing better quality management planning and systems aimed ultimately at achieving better project quality delivery.
Resumo:
One of the prominent topics in Business Service Management is business models for (new) services. Business models are useful for service management and engineering as they provide a broader and more holistic perspective on services. Business models are particularly relevant for service innovation as this requires paying attention to the business models that make new services viable and business model innovation can drive the innovation of new and established services. Before we can have a look at business models for services, we first need to understand what business models are. This is not straight-forward as business models are still not well comprehended and the knowledge about business models is fragmented over different disciplines, such as information systems, strategy, innovation, and entrepreneurship. This whitepaper, ‘Understanding business models,’ introduces readers to business models. This whitepaper contributes to enhancing the understanding of business models, in particular the conceptualisation of business models by discussing and integrating business model definitions, frameworks and archetypes from different disciplines. After reading this whitepaper, the reader will have a well-developed understanding about what business models are and how the concept is sometimes interpreted and used in different ways. It will help the reader in assessing their own understanding of business models and that and of others. This will contribute to a better and more beneficial use of business models, an increase in shared understanding, and making it easier to work with business model techniques and tools.
Resumo:
The overarching objective of the research was to identify the existence and nature of international legal principles governing sustainable forest use and management. This research intended to uncover a set of forest legal considerations that are relevant for consideration across the globe. The purpose behind this, is to create a theoretical base of international forest law literature which be drawn upon to inform future international forestry research. This research will be of relevance to those undertaking examination of a particular forest issue or those focusing on forests in a particular region. The thesis explains the underlying legal issues in forest regulation, the dominant international regulatory approaches and makes suggestions as to how international and national forest policy could be improved.