470 resultados para 290804 Construction Engineering
Resumo:
Agile Project Management (APM) is a human-centred method for increasing customer-perceived value in a reliable manner. It has been proven to be particularly suited to creative projects such as Information Systems (IS) development and new product development in the automotive industry (this is in contrast to ‘lean production’ which has proved so useful to automotive production waste elimination). Construction is similarly largely a creative industry and might usefully adopt APM to improve its own reliable value delivery, rather than solely following the industrial trend of lean production. This paper describes APM, comparing it with two prominent lean construction initiatives, and then assesses by phase the potential for any impact of APM in construction. In conclusion: APM would have benefits for all phases of construction, particularly in planning and design, but its adoption for actual construction would generally be disrupted because of the lack of a coherent, well trained and trusted workforce.
Resumo:
This research has developed a framework to improve the effectiveness and efficiency of stakeholder involvement during the early planning stages of residential construction projects, in order to improve many of the quality issues that occur during the construction phases of such projects. A mixed methods approach (survey, interviews and case studies) was employed to collect the required data. It is expected that with development, this framework can bring some significant benefits to future construction projects in terms of reducing rework and wastage, improving timely delivery and avoiding disputes. The research is also anticipated to produce three high impact journal articles.
Resumo:
Construction projects are a high risk business activity. When undertaking projects in an international context, it is further complicated by the risk of fluctuations in the foreign exchange rates (FOREX). Construction business performance is affected by these fluctuations. They affect progress and cause delays, which in turn create problems for subcontractors, namely cost overruns, disputes, arbitration, total abandonment and litigation. FOREX fluctuations also cause the price of raw materials to increase, leading the cost overruns. Managing FOREX risk is critical and past research have focused on the need for adequate insurance, careful planning and management, and foreign exchange futures hedging to overcome issues that have been caused by the FOREX risk. Analysis of FOREX risk in international construction business usually focused only on issues at the project level. There is currently lack of understanding of Organisational Capabilities (OC) to manage the impacts of FOREX risk, which when examined, are seen in isolation. This paper attempts to bridge the gap by discussing the impacts of FOREX fluctuations on the international construction business. The focus is on the OC perspective and the need to develop OC framework to mitigate the risk in sustaining construction business performance.
Resumo:
This thesis is an empirical study of the factors impacting on the client involvement in Saudi Arabian construction government projects. The study investigated the impact of some factors that limited the client involvement and developed a framework called "client involvement interactive" to improve the client involvement practices in Saudi Arabian construction projects through the implementation of an implementable strategy elaborated.
Resumo:
This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.
Resumo:
The productivity of the construction industry has a significant effect on national economic growth. Gains from higher construction productivity flow through the economy, as all industries rely on construction to some extent as part of their business investment. Contractions and expansions of economic activity are common phenomena in an economy. Three construction cycles occurred between the years 1970 and 2011 in Malaysia. The relationships between construction productivity and economic development are examined by the partial correlation method to establish the underlying factors driving the change in construction productivity. Construction productivity is statistically significantly correlated with gross domestic product (GDP) per capita in a positive direction for the 1985–98 and 1998–2009 cycles, but not the 1970–85 cycle. Fluctuations in construction activities and the influx of foreign workers underlie the changes of construction productivity in the 1985–98 cycle. There was less fluctuation in construction activities in the 1998–2009 cycle, with changes being mainly due to the fiscal stimulation policies of the government in attempting to stabilize the economy. The intensive construction of mega-projects resulted in resource constraints and cost pressures during the 1980s and 1990s. A better management of the ‘boom-bust’ nature of the construction business cycle is required to maintain the capability and capacity of the industry.
Resumo:
The construction industry is one of the largest sources of carbon emissions. Manufacturing of raw materials, such as cement, steel and aluminium, is energy intensive and has considerable impact on carbon emissions level. Due to the rising recognition of global climate change, the industry is under pressure to reduce carbon emissions. Carbon labelling schemes are therefore developed as meaningful yardsticks to measure and compare carbon emissions. Carbon labelling schemes can help switch consumer-purchasing habits to low-carbon alternatives. However, such switch is dependent on a transparent scheme. The principle of transparency is highlighted in all international greenhouse gas (GHG) standards, including the newly published ISO 14067: Carbon footprint of products – requirements and guidelines for quantification and communication. However, there are few studies which systematically investigate the transparency requirements in carbon labelling schemes. A comparison of five established carbon labelling schemes, namely the Singapore Green Labelling Scheme, the CarbonFree (the U.S.), the CO2 Measured Label and the Reducing CO2 Label (UK), the CarbonCounted (Canada), and the Hong Kong Carbon Labelling Scheme is therefore conducted to identify and investigate the transparency requirements. The results suggest that the design of current carbon labels have transparency issues relating but not limited to the use of a single sign to represent the comprehensiveness of the carbon footprint. These transparency issues are partially caused by the flexibility given to select system boundary in the life cycle assessment (LCA) methodology to measure GHG emissions. The primary contribution of this study to the construction industry is to reveal the transparency requirements from international GHG standards and carbon labels for construction products. The findings also offer five key strategies as practical implications for the global community to improve the performance of current carbon labelling schemes on transparency.
Resumo:
Describes the development and testing of a robotic system for charging blast holes in underground mining. The automation system supports four main tactical functions: detection of blast holes; teleoperated arm pose control; automatic arm pose control; and human-in-the-loop visual servoing. We present the system architecture, and analyse the major components, Hole detection is crucial for automating the process, and we discuss theoretical and practical aspects in detail. The sensors used are laser range finders and cameras installed in the end effector. For automatic insertion, we consider image processing techniques to support visual servoing the tool to the hole. We also discuss issues surrounding the control of heavy-duty mining manipulators, in particular, friction, stiction, and actuator saturation.
Resumo:
The housing construction industry in Saudi Arabia has been booming rapidly in the past two decades. This boom has faced multiple downfalls in relation to government regulations and building codes, one of which is the application of sustainable methods to the housing construction. This paper sheds some light on the current role of the Saudi government and the role of the Saudi Building Code (SBC) in the housing construction industry. The methodology utilised in this paper was a Delphi survey that was distributed to twenty-five key stakeholders in the housing construction industry in Saudi Arabia. The results indicate that there is a lack of integration between the Saudi Building Code and the current construction methods used in the current construction industry. Some factors and elements are recommended to be incorporated into the Saudi Building Code and to be adopted as regulations in the Saudi housing construction industry.
Resumo:
This study reports the construction and reconstruction of identities of new and existing employees during a significant transition phase of a nuclear engineering organization. We followed a group of new and existing employees over the period of three years, during which the organization constructed a greenfield nuclear facility with new generational technologies whilst in parallel, decommissioned the older reactor. This change led to the transfer and integration of existing trade-based employees with the newly recruited, primarily university educated graduates in the new site. Three waves of interview data were collected, in conjunction with the cognitive mapping of social grouping and photo elicitation portrayed the stories of different group of employees who either succeeded or failed at embracing their new professional identity. In contrast with the new recruits who constructed new identities as they join this organization, we identify and report on the number of enabling and disabling factors that influence the process of professional identity construction and reconstruction during gamma change.
Resumo:
Detailed knowledge of the past history of an active volcano is crucial for the prediction of the timing, frequency and style of future eruptions, and for the identification of potentially at-risk areas. Subaerial volcanic stratigraphies are often incomplete, due to a lack of exposure, or burial and erosion from subsequent eruptions. However, many volcanic eruptions produce widely-dispersed explosive products that are frequently deposited as tephra layers in the sea. Cores of marine sediment therefore have the potential to provide more complete volcanic stratigraphies, at least for explosive eruptions. Nevertheless, problems such as bioturbation and dispersal by currents affect the preservation and subsequent detection of marine tephra deposits. Consequently, cryptotephras, in which tephra grains are not sufficiently concentrated to form layers that are visible to the naked eye, may be the only record of many explosive eruptions. Additionally, thin, reworked deposits of volcanic clasts transported by floods and landslides, or during pyroclastic density currents may be incorrectly interpreted as tephra fallout layers, leading to the construction of inaccurate records of volcanism. This work uses samples from the volcanic island of Montserrat as a case study to test different techniques for generating volcanic eruption records from marine sediment cores, with a particular relevance to cores sampled in relatively proximal settings (i.e. tens of kilometres from the volcanic source) where volcaniclastic material may form a pervasive component of the sedimentary sequence. Visible volcaniclastic deposits identified by sedimentological logging were used to test the effectiveness of potential alternative volcaniclastic-deposit detection techniques, including point counting of grain types (component analysis), glass or mineral chemistry, colour spectrophotometry, grain size measurements, XRF core scanning, magnetic susceptibility and X-radiography. This study demonstrates that a set of time-efficient, non-destructive and high-spatial-resolution analyses (e.g. XRF core-scanning and magnetic susceptibility) can be used effectively to detect potential cryptotephra horizons in marine sediment cores. Once these horizons have been sampled, microscope image analysis of volcaniclastic grains can be used successfully to discriminate between tephra fallout deposits and other volcaniclastic deposits, by using specific criteria related to clast morphology and sorting. Standard practice should be employed when analysing marine sediment cores to accurately identify both visible tephra and cryptotephra deposits, and to distinguish fallout deposits from other volcaniclastic deposits.
Resumo:
Funded by an Australian Research Council (ARC) Linkage grant over four years (2009–13), the Major Infrastructure Procurement project sought to find more effective and efficient ways of procuring and delivering the nation’s social and economic infrastructure by investigating constraints relating to construction capacity, competition, and finance in new public sector major infrastructure.1 The research team comprised researchers in construction economics and finance from Queensland University of Technology (QUT), Griffith University (GU), The University of Hong Kong (UHK), and The University of Newcastle (UoN). Project partners included state government departments and agencies responsible for infrastructure procurement and delivery from all Australian mainland states, and private sector companies and peak bodies in the infrastructure sector (see “Introduction” for complete list). There are a number of major outcomes from this research project. The first of these is a scientifically developed decisionmaking model for procurement of infrastructure that deploys a novel and state-of-the-art integration of dominant microeconomic theory (including theories developed by two Nobel Prize winners). The model has been established through empirical testing and substantial experiential evidence as a valid and reliable guide to configuring procurement of new major and mega infrastructure projects in pursuance of superior Valuefor- Money (VfM). The model specifically addresses issues of project size, bundling of contracts, and exchange relationships. In so doing, the model determines the suitability of adopting a Public-Private Partnership (PPP) mode.
Resumo:
A recurring feature of modern practice is the stress placed on project professionals, with both debilitating effects on the people concerned and indirectly affecting project success. Cost estimation, for example, is an essential task for successful project management involving a high level of uncertainty. It is not surprising, therefore, that young cost estimators especially can become stressful at work due to a lack of experience and the heavy responsibilities involved. However, the concept of work stress and the associated underlying dimensions has not been clearly defined in extant studies in the construction management field. To redress this situation, an updated psychology perceived stress questionnaire (PSQ) , first developed by Levenstein et al (1993) and revised by Fliege et al (2005), is used to explore the dimensions of work stress with empirical evidence from the construction industry in China. With 145 reliable responses from young (less than 5 years’ experience) Chinese cost estimators, this study explores the internal dimensions of work stress, identifying four dimensions of tension, demands, lack of joy and worries. It is suggested that this four-dimensional structure may also be applicable in a more general context.
Resumo:
Research problem: Overfitting and collinearity problems commonly exist in current construction cost estimation applications and obstruct researchers and practitioners in achieving better modelling results. Research objective and method: A hybrid approach of Akaike information criterion (AIC) stepwise regression and principal component regression (PCR) is proposed to help solve overfitting and collinearity problems. Utilization of this approach in linear regression is validated by comparing it with other commonly used approaches. The mean square error obtained by leave-one-out cross validation (MSELOOCV) is used in model selection in deciding predictive variables.
Resumo:
Structural equation modeling (SEM) is a versatile multivariate statistical technique, and applications have been increasing since its introduction in the 1980s. This paper provides a critical review of 84 articles involving the use of SEM to address construction related problems over the period 1998–2012 including, but not limited to, seven top construction research journals. After conducting a yearly publication trend analysis, it is found that SEM applications have been accelerating over time. However, there are inconsistencies in the various recorded applications and several recurring problems exist. The important issues that need to be considered are examined in research design, model development and model evaluation and are discussed in detail with reference to current applications. A particularly important issue concerns the construct validity. Relevant topics for efficient research design also include longitudinal or cross-sectional studies, mediation and moderation effects, sample size issues and software selection. A guideline framework is provided to help future researchers in construction SEM applications.