542 resultados para ciclismo off-road
Resumo:
Consistency and invariance in movements are traditionally viewed as essential features of skill acquisition and elite sports performance. This emphasis on the stabilization of action has resulted in important processes of adaptation in movement coordination during performance being overlooked in investigations of elite sport performance. Here we investigate whether differences exist between the movement kinematics displayed by five, elite springboard divers (age 17 ± 2.4 years) in the preparation phases of baulked and completed take-offs. The two-dimensional kinematic characteristics of the reverse somersault take-off phases (approach and hurdle) were recorded during normal training sessions and used for intra-individual analysis. All participants displayed observable differences in movement patterns at key events during the approach phase; however, the presence of similar global topological characteristics suggested that, overall, participants did not perform distinctly different movement patterns during completed and baulked dives. These findings provide a powerful rationale for coaches to consider assessing functional variability or adaptability of motor behaviour as a key criterion of successful performance in sports such as diving.
Resumo:
Computational models represent a highly suitable framework, not only for testing biological hypotheses and generating new ones but also for optimising experimental strategies. As one surveys the literature devoted to cancer modelling, it is obvious that immense progress has been made in applying simulation techniques to the study of cancer biology, although the full impact has yet to be realised. For example, there are excellent models to describe cancer incidence rates or factors for early disease detection, but these predictions are unable to explain the functional and molecular changes that are associated with tumour progression. In addition, it is crucial that interactions between mechanical effects, and intracellular and intercellular signalling are incorporated in order to understand cancer growth, its interaction with the extracellular microenvironment and invasion of secondary sites. There is a compelling need to tailor new, physiologically relevant in silico models that are specialised for particular types of cancer, such as ovarian cancer owing to its unique route of metastasis, which are capable of investigating anti-cancer therapies, and generating both qualitative and quantitative predictions. This Commentary will focus on how computational simulation approaches can advance our understanding of ovarian cancer progression and treatment, in particular, with the help of multicellular cancer spheroids, and thus, can inform biological hypothesis and experimental design.
Resumo:
Due to knowledge gaps in relation to urban stormwater quality processes, an in-depth understanding of model uncertainty can enhance decision making. Uncertainty in stormwater quality models can originate from a range of sources such as the complexity of urban rainfall-runoff-stormwater pollutant processes and the paucity of observed data. Unfortunately, studies relating to epistemic uncertainty, which arises from the simplification of reality are limited and often deemed mostly unquantifiable. This paper presents a statistical modelling framework for ascertaining epistemic uncertainty associated with pollutant wash-off under a regression modelling paradigm using Ordinary Least Squares Regression (OLSR) and Weighted Least Squares Regression (WLSR) methods with a Bayesian/Gibbs sampling statistical approach. The study results confirmed that WLSR assuming probability distributed data provides more realistic uncertainty estimates of the observed and predicted wash-off values compared to OLSR modelling. It was also noted that the Bayesian/Gibbs sampling approach is superior compared to the most commonly adopted classical statistical and deterministic approaches commonly used in water quality modelling. The study outcomes confirmed that the predication error associated with wash-off replication is relatively higher due to limited data availability. The uncertainty analysis also highlighted the variability of the wash-off modelling coefficient k as a function of complex physical processes, which is primarily influenced by surface characteristics and rainfall intensity.
Resumo:
The study investigated the influence of traffic and land use parameters on metal build-up on urban road surfaces. Mathematical relationships were developed to predict metals originating from fuel combustion and vehicle wear. The analysis undertaken found that nickel and chromium originate from exhaust emissions, lead, copper and zinc from vehicle wear, cadmium from both exhaust and wear and manganese from geogenic sources. Land use does not demonstrate a clear pattern in relation to the metal build-up process, though its inherent characteristics such as traffic activities exert influence. The equation derived for fuel related metal load has high cross-validated coefficient of determination (Q2) and low Standard Error of Cross-Validation (SECV) values indicates that the model is reliable, while the equation derived for wear-related metal load has low Q2 and high SECV values suggesting its use only in preliminary investigations. Relative Prediction Error values for both equations are considered to be well within the error limits for a complex system such as an urban road surface. These equations will be beneficial for developing reliable stormwater treatment strategies in urban areas which specifically focus on mitigation of metal pollution.
Resumo:
The approach adopted for investigating the relationship between rainfall characteristics and pollutant wash-off process is commonly based on the use of parameters which represent the entire rainfall event. This does not permit the investigation of the influence of rainfall characteristics on different sectors of the wash-off process such as first flush where there is a high pollutant wash-off load at the initial stage of the runoff event. This research study analysed the influence of rainfall characteristics on the pollutant wash-off process using two sets of innovative parameters by partitioning wash-off and rainfall characteristics. It was found that the initial 10% of the wash-off process is closely linked to runoff volume related rainfall parameters including rainfall depth and rainfall duration while the remaining part of the wash-off process is primarily influenced by kinetic energy related rainfall parameters, namely, rainfall intensity. These outcomes prove that different sectors of the wash-off process are influenced by different segments of a rainfall event.
Resumo:
The validity of using rainfall characteristics as lumped parameters for investigating the pollutant wash-off process such as first flush occurrence is questionable. This research study introduces an innovative concept of using sector parameters to investigate the relationship between the pollutant wash-off process and different sectors of the runoff hydrograph and rainfall hyetograph. The research outcomes indicated that rainfall depth and rainfall intensity are two key rainfall characteristics which influence the wash-off process compared to the antecedent dry period. Additionally, the rainfall pattern also plays a critical role in the wash-off process and is independent of the catchment characteristics. The knowledge created through this research study provides the ability to select appropriate rainfall events for stormwater quality treatment design based on the required treatment outcomes such as the need to target different sectors of the runoff hydrograph or pollutant species. The study outcomes can also contribute to enhancing stormwater quality modelling and prediction in view of the fact that conventional approaches to stormwater quality estimation is primarily based on rainfall intensity rather than considering other rainfall parameters or solely based on stochastic approaches irrespective of the characteristics of the rainfall event.
Resumo:
Urban road dust comprises of a range of potentially toxic metal elements and plays a critical role in degrading urban receiving water quality. Hence, assessing the metal composition and concentration in urban road dust is a high priority. This study investigated the variability of metal composition and concentrations in road dust in 4 different urban land uses in Gold Coast, Australia. Samples from 16 road sites were collected and tested for selected 12 metal species. The data set was analyzed using both univariate and multivariate techniques. Outcomes of the data analysis revealed that the metal concentrations in road dust differ considerably within and between different land uses. Iron, aluminum, magnesium and zinc are the most abundant in urban land uses. It was also noted that metal species such as titanium, nickel, copper and zinc have the highest concentrations in industrial land use. The study outcomes revealed that soil and traffic related sources as key sources of metals deposited on road surfaces.
Resumo:
This study assessed the revised Behavioural Inhibition System (BIS), as conceptualised by Gray and McNaughton’s (2000) revised RST, by exposing participants to a loss-framed road safety message (emphasising the negative consequences of speeding behaviour) and a high performance motor vehicle promotional advertisement. Licensed young drivers (N = 40, aged 17–25 years) were randomly allocated to view either the message or both the message and advertisement. Participants then completed a computerised lexical decision task prior to completing three personality measures: Corr-Cooper RST-PQ, CARROT and Q-Task. It was predicted that those with a stronger BIS would demonstrate greater processing of these mixed message cues compared to weaker BIS individuals, and that this BIS effect would only be observed in the mixed cues condition (due to simultaneous activation of the incentive and punishment systems). Preliminary findings will be discussed in the context of the influence of personality traits on health message processing.
Resumo:
IODP Expedition 339 drilled five sites in the Gulf of Cadiz and two off the west Iberian margin (November 2011 to January 2012), and recovered 5.5 km of sediment cores with an average recovery of 86.4%. The Gulf of Cadiz was targeted for drilling as a key location for the investigation of Mediterranean outflow water (MOW) through the Gibraltar Gateway and its influence on global circulation and climate. It is also a prime area for understanding the effects of tectonic activity on evolution of the Gibraltar Gateway and on margin sedimentation. We penetrated into the Miocene at two different sites and established a strong signal of MOW in the sedimentary record of the Gulf of Cadiz, following the opening of the Gibraltar Gateway. Preliminary results show the initiation of contourite deposition at 4.2–4.5 Ma, although subsequent research will establish whether this dates the onset of MOW. The Pliocene succession, penetrated at four sites, shows low bottom current activity linked with a weak MOW. Significant widespread unconformities, present in all sites but with hiatuses of variable duration, are interpreted as a signal of intensified MOW, coupled with flow confinement. The Quaternary succession shows a much more pronounced phase of contourite drift development, with two periods of MOW intensification separated by a widespread unconformity. Following this, the final phase of drift evolution established the contourite depositional system (CDS) architecture we see today. There is a significant climate control on this evolution of MOW and bottom-current activity. However, from the closure of the Atlantic–Mediterranean gateways in Spain and Morocco just over 6 Ma and the opening of the Gibraltar Gateway at 5.3 Ma, there has been an even stronger tectonic control on margin development, downslope sediment transport and contourite drift evolution. The Gulf of Cadiz is the world's premier contourite laboratory and thus presents an ideal testing ground for the contourite paradigm. Further study of these contourites will allow us to resolve outstanding issues related to depositional processes, drift budgets, and recognition of fossil contourites in the ancient record on shore. The expedition also verified an enormous quantity and extensive distribution of contourite sands that are clean and well sorted. These represent a relatively untapped and important exploration target for potential oil and gas reservoirs.
Resumo:
Providing mobility corridors for communities, enabling freight networks to transport goods and services, and a pathway for emergency services and disaster relief operations, roads are a vital component of our societal system. In the coming decades, a number of modern issues will face road agencies as a result of climate change, resource scarcity and energy related challenges that will have implications for society. To date, these issues have been discussed on a case by case basis, leading to a fragmented approach by state and federal agencies in considering the future of roads – with potentially significant cost and risk implications. Within this context, this paper summarises part of a research project undertaken within the ‘Greening the Built Environment’ program of the Sustainable Built Environment National Research Centre (SBEnrc, Australia), which identified key factors or ‘trends’ affecting the future of roads and key strategies to ensure that road agencies can continue to deliver road infrastructure that meets societal needs in an environmentally appropriate manner. The research was conducted over two years, including a review of academic and state agency literature, four stakeholder workshops in Western Australia and Queensland, and industry consultation. The project was supported financially and through peer review and contribution, by Main Roads Western Australia, QLD Department of Transport and Main Roads, Parsons Brinckerhoff, John Holland Group, and the Australian Green Infrastructure Council (AGIC). The project highlighted several potential trends that are expected to affect road agencies in the future, including predicted resource and materials shortages, increases in energy and natural resources prices, increased costs related to greenhouse gas emissions, changing use and expectations of roads, and changes in the frequency and intensity of weather events. Exploring the implications of these potential futures, the study then developed a number of strategies in order to prepare transport agencies for the associated risks that such trends may present. An unintended outcome of the project was the development of a process for enquiring into future scenarios, which will be explored further in Stage 2 of the project (2013-2014). The study concluded that regardless of the type and scale of response by the agency, strategies must be holistic in approach, and remain dynamic and flexible.
Resumo:
Civil infrastructure and especially roads are being impacted with increasing frequency by flood, Tsunami, cyclone related natural and manmade disasters in the world. Responding to such events and in preparing for more regular and intense climate-change induced events in future, the road governing agencies are reviewing how postdisaster road infrastructure recovery projects are best planned and delivered. In particular, there is awareness that rebuilding such infrastructure require sustainable asset management strategies across economic, environmental and social dimensions. A comprehensive asset management framework for pre and post disaster situations can minimize negative impacts on our communities, economy and environment. This research paper is focused on post disaster management in road infrastructures and road infrastructure asset management strategies used by road authorities. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of disasters. This research paper will contribute to strategic infrastructure asset planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes. This paper also focuses on proper asset management, governance and engineering principles which should be followed and adopted in post disaster recovery projects to maximize sustainability in environmental, social and economic dimensions.
Resumo:
Several significant studies have been made in recent decades toward understanding road traffic noise and its effects on residential balconies. These previous studies have used a variety of techniques such as theoretical models, scale models and measurements on real balconies. The studies have considered either road traffic noise levels within the balcony space or inside an adjacent habitable room or both. Previous theoretical models have used, for example, simplified specular reflection calculations, boundary element methods (BEM), adaptations of CoRTN or the use of Sabine Theory. This paper presents an alternative theoretical model to predict the effects of road traffic noise spatially within the balcony space. The model includes a specular reflection component by calculating up to 10 orders of source images. To account for diffusion effects, a two compartment radiosity component is utilised. The first radiosity compartment is the urban street, represented as a street with building facades on either side. The second radiosity compartment is the balcony space. The model is designed to calculate the predicted road traffic noise levels within the balcony space and is capable of establishing the effect of changing street and balcony geometries. Screening attenuation algorithms are included to determine the effects of solid balcony parapets and balcony ceiling shields.
Resumo:
Road construction, maintenance and operation are activities that impact the environment by way of energy use, resource consumption and emission. Components such as construction material, transportation, street lighting, rolling resistance, traffic congestion during works, albedo and end-of-life processing impact the environment at different phases of the life of a road. With a view to promote sustainable development, a few sustainability rating schemes, e.g. Infrastructure Sustainability and Invest (Australia), Envision and Greenroads (USA), and CEEQUAL (UK) have been developed, that can assess road projects. These schemes address environmental areas such as: energy and emission, land, water, materials, discharges into surroundings, waste and ecology as factors for sustainable development. This paper assesses different rating schemes based on a defined comprehensive life cycle assessment (LCA) system boundary for road projects to identify different environmental indicators that address sustainable road development and operation. The findings indicate that new indicators are required to address different environmental components during the operation phase of roads.
Resumo:
Over several decades, academics around the world have investigated the necessary tools, techniques, and conditions which would allow BIM (building information modeling) to become a positive force in the world of construction. As the research results matured, BIM started to become commercially available. Researchers and many in industry soon realized that BIM, as a technological innovation, was, in and of itself, not the end point in the journey. The technical adoption of BIM has to be supported by process and culture change within organizations to make a real impact on a project (for example, see AECbytes Viewpoint #35 by Chuck Eastman, Paul Teicholz, Rafael Sacks and Kathleen Liston). Current academic research aims to understand the steps beyond BIM, which will help chart the future of our industry over the coming decades. This article describes an international research effort in this area, coordinated by the Integrated Design and Delivery Solutions (IDDS) initiative of the CIB (International Council for Research and Innovation in Building and Construction). We hope that it responds to and extends the discussion initiated by Brian Lighthart in AECbytes Viewpoint #56, which asked about who is charting future BIM directions.
Resumo:
Road infrastructure has been considered as one of the most expensive and extensive infrastructure assets of the built environment globally. This asset also impacts the natural environment significantly during different phases of life e.g. construction, use, maintenance and end-of-life. The growing emphasis for sustainable development to meet the needs of future generations requires mitigation of the environmental impacts of road infrastructure during all phases of life e.g. construction, operation and end-of-life disposal (as required). Life-cycle analysis (LCA), a method of quantification of all stages of life, has recently been studied to explore all the environmental components of road projects due to limitations of generic environmental assessments. The LCA ensures collection and assessment of the inputs and outputs relating to any potential environmental factor of any system throughout its life. However, absence of a defined system boundary covering all potential environmental components restricts the findings of the current LCA studies. A review of the relevant published LCA studies has identified that environmental components such as rolling resistance of pavement, effect of solar radiation on pavement(albedo), traffic congestion during construction, and roadway lighting & signals are not considered by most of the studies. These components have potentially higher weightings for environment damage than several commonly considered components such as materials, transportation and equipment. This paper presents the findings of literature review, and suggests a system boundary model for LCA study of road infrastructure projects covering potential environmental components.