837 resultados para Queensland Road Construction


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Due to the propensity of fleet incidents, poor organisational survey results and a lack of fleet safety systems, it was evident that Redland City Council were underperforming, experiencing a variety of work related road safety issues and possessed a low fleet safety culture. As a result of an audit process, and the identification of gaps in organisational process within the fleet safety area Redland City Council embarked upon the enormous task of strategically implementing initiatives and improving fleet safety across the organisation. The strategies utilised within the Redland City Council Fleet Safety Initiative were implemented utilising a systematic process and adopted a multi-disciplinary approach to improve overall fleet safety. Organisational initiatives targeting fleet safety aspects have benefited the Council by the development of an improved organisational culture, including safer driver attitudes and behaviour. This paper outlines the road to recovery for Redland City Council in relation to its fleet safety initiatives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As the Indonesian construction industry is now promising to become the engine of national economic development, achieving quality and higher performance, not only domestically but also in the international market, are becoming crucial issues. Implementing quality management systems (QMSs) based on ISO 9001 are important in helping Indonesian construction companies become more competitive, for it is acknowledged that quality in construction is a major concern in the global construction industry. However, the possession of ISO 9001 certification does not reflect the presence of a well-operated QMS, which is capable of giving customer and project end-users satisfaction. The review of literature found that there is a significant correlation between a company.s organisational culture and the quality performance of contractors. While research into this area has involved many researchers, there is no critical mass of information specifically related to the Indonesian situation. Studies based on contemporary perspectives of the characteristics of the Indonesian construction organisational culture using Cameron and Quinn.s Organizational Culture Assessment Instrument (OCAI) and its relationship with the contractor.s ISO 9001 practices, have not been previously undertaken. This thesis research, therefore, investigated the culture profiles in Indonesian construction organisations, together with the current implementation of ISO 9001 and their performance during implementing QMSs, as information in these areas has a bearing on the poor performance and low levels of competitiveness of Indonesian construction companies. Questionnaire surveys were distributed to selected representative grade 7 civil engineering contractors located in the two provincial capitals of Makassar and Manado, and the national capital, Jakarta, in order to collect responses designed to examine the effectiveness of their QMSs implementation. The survey also aimed to identify current problems within the systems, and examine the performance of companies while implementing their QMSs. The questionnaire contained questions to assess the organisational culture profiles of Indonesian construction companies, adopting the OCAI. The survey results were then used to analyse the influence of different organisational culture profiles on QMSs implementation among respondent companies. The results from the questionnaire survey supported the development of a Culture-based Quality Management System Improvement Implementation Framework, designed to help Indonesian construction companies identify some typical barriers associated with impacting on effective QMSs implementation; to assist them to develop cultural values that can drive effective QMSs implementation; to undertake effective QMSs practices; and to recognise the potential results and longer-term benefits obtainable from implementing effective QMSs. A Focus Group Discussion was conducted with the assistance of a panel of professional construction practitioners, policy makers and academic experts, which further considered and validated the usefulness and applicability of the framework. Based on the outcome from this discussion and on the results of the earlier data analysis, a final version of the framework was developed to assist Indonesian construction companies in improving their capability of construction project delivery, and thereby contribute to providing or improving the competitive advantage of Indonesian construction companies in the local, national and global construction market.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As sustainability becomes an important principle guiding various human activities around the globe, the higher education sector is being asked to take an active part in educating and promoting sustainability due to its moral responsibility, social obligation and its own needs to adapt to new circumstances. There is a global trend of higher education institutions embarking on responses to the sustainability challenge. On-campus building performance is one of the most important indicators for “sustainable universities”, because buildings carry substantially environmental burden such as considerable consumption of raw materials and energy as well as huge amount of waste generation and greenhouse gas emission. Plus, much research proves that building performance can impact on students and staff’s awareness about and behaviours related to sustainability. The past studies rarely discussed about sustainable construction projects in universities’ unique context. Universities are labeled with distinct characteristics such as complex governance, multiple cultures and juggling missions and so on. It is necessary and meaningful to examine the project management system in terms of universities’ organizational environment. Thus, this research project applies Delphi study to identify primary barriers to green technology application in on-campus buildings, critical factors for sustainable project success, key actions in project phases and strategies for project improvement. Through three rounds of questionnaires among panel experts, the authors obtain a profound understanding of project delivery system in universities. The research results are expected to provide sustainability practitioners with holistic understanding and generic information about sustainable construction project performance on campus as an assistance tool.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper addresses the problem of scheduling a cane transport system involving both rail transport and road transport, where the road transport operates from several sidings in the rail network. An iterative approach for scheduling the rail transport system has been developed using existing rail transport scheduling tools. The assumption that harvesters serviced by road transport are effectively operating from the rail siding from which their bins are supplied seems a reasonable starting point for the analysis. There is a need to manually modify the schedule to take into account the road transport schedule to ensure that full bins are not collected before the road transport system delivers them back to the rail siding.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper addresses the question of how to open up pathways and build capacity to facilitate the movement towards sustainable sub-tropical cities. The focus is on outlining a collaborative planning and co-design process that can help catalyse the emergence of sustainable place-habitats and so re-weave and colour anew the tapestry of our sub-tropical cities. Cities are portrayed as self-organising complex adaptive system phenomena, being constantly re-shaped by local and global social-political, environmental, cultural and economic forces as well as planning regimes. While constructing a sustainable city is at essence a design process incorporating new sustainable practices and legislation to reinforce their use, these steps are necessary but not sufficient. Sustainable sub-tropical city-making could be re-thought as a dreaming-re-storying process. This paper explores a new co-design process, which can channel collaborative efforts around re-inventing sustainable place-habitats across the cityscape. A further outcome of this co-design process is the alignment of the emergent design principles and planning actions that can trigger the re-storying of a new sustainable sub-tropical city. Besides a new co-design process, we also advocate the building of sub-tropical city learning networks to facilitate the cross-fertilization for Dreaming sustainable sub-tropical cities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this presentation, renowned arts practitioner, Sean Mee, and Nigel Lavender, Executive Director of the Queensland Music Festival, talk about how community arts practice can be used to build cultural captial in communities, using examples such large-scale musicals such as The Road We're ON (Charleville) and Behind the Cand (Bowen), Mee and Lavender highlight the importance of community-driven narrative and particiaption.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dynamic capability theory asserts that the learning capabilities of construction organisations influence the degree to which value-for-money (VfM) is achieved on collaborative projects. However, there has been little study conducted to verify this relationship. The evidence is particularly limited within the empirical context of infrastructure delivery in Australia. Primarily drawing on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991), dynamic capabilities (e.g. Helfat et al. 2007), absorptive capacity (e.g. Lane et al. 2006) and knowledge management (e.g. Nonaka 1994), this paper conceptualises learning capability as a knowledge-based dynamic capability. Learning capability builds on the micro-foundations of high-order learning routines, which are deliberately developed by construction organisations for managing collaborative projects. Based on this conceptualisation of learning capability, an exploratory case study was conducted. The study investigated the operational and higher-order learning routines adopted by a project alliance team to successfully achieve VfM. The case study demonstrated that the learning routines of the alliance project were developed and modified by the continual joint learning activities of participant organisations. Project-level learning routines were found to significantly influence the development of organisational-level learning routines. In turn, the learning outcomes generated from the alliance project appeared to significantly influence the development of project management routines and contractual arrangements applied by the participant organisations in subsequent collaborative projects. The case study findings imply that the higher-order learning routines that underpin the learning capability of construction organisations have the potential to influence the VfM achieved on both current and future collaborative projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A multi-faceted study is conducted with the objective of estimating the potential fiscal savings in annoyance and sleep disturbance related health costs due to providing improved building acoustic design standards. This study uses balcony acoustic treatments in response to road traffic noise as an example. The study area is the State of Queensland in Australia, where regional road traffic noise mapping data is used in conjunction with standard dose–response curves to estimate the population exposure levels. The background and the importance of using the selected road traffic noise indicators are discussed. In order to achieve the objective, correlations between the mapping indicator (LA10 (18 hour)) and the dose response curve indicators (Lden and Lnight) are established via analysis on a large database of road traffic noise measurement data. The existing noise exposure of the study area is used to estimate the fiscal reductions in health related costs through the application of simple estimations of costs per person per year per degree of annoyance or sleep disturbance. The results demonstrate that balcony acoustic treatments may provide a significant benefit towards reducing the health related costs of road traffic noise in a community.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There are no population studies of prevalence or incidence of child maltreatment in Australia. Child protection data gives some understanding but is restricted by system capacity and definitional issues across jurisdictions. Child protection data currently suggests that numbers of reports are increasing yearly, and the child protection system then becomes focussed on investigating all reports and diluting available resources for those children who are most in need of intervention. A public health response across multiple agencies enables responses to child safety across the entire population. All families are targeted at the primary level; examples include ensuring all parents know the dangers of shaking a baby or teaching children to say no if a situation makes them uncomfortable. The secondary level of prevention targets families with a number of risk factors, for example subsidised child care so children aren't left unsupervised after school when both parents have to be at work or home visiting for drug-addicted parents to ensure children are cared for. The tertiary response then becomes the responsibility of the child protection system and is reserved for those children where abuse and neglect are identified. This model requires that child safety is seen in a broader context than just the child protection system, and increasingly health professionals are being identified as an important component in the public health framework. If all injury is viewed as preventable and considered along a continuum of 'accidental' through to 'inflicted', it becomes possible to conceptualise child maltreatment in an injury context. Parental intent may not be to cause harm to the child, but by lack of insight or concern about risk, the potential for injury is high. The mechanisms for unintentional and intentional injury overlap and some suggest that by segregating child abuse (with the possible exception of sexual abuse) from unintentional injury, child abuse is excluded from the broader injury prevention initiative that is gaining momentum in the community. This research uses a public health perspective, specifically that of injury prevention, to consider the problem of child abuse. This study employed a mixed method design that incorporates secondary data analysis, data linkage and structured interviews of different professional groups. Datasets from the Queensland Injury Surveillance Unit (QISU) and The Department of Child Safety (DCS) were evaluated. Coded injury data was grouped according to intent of injury according to those with a code that indicated the ED presentation was due to child abuse, a code indicating that the injury was possibly due to abuse or, in the third group, the intent code indicated that the injury was unintentional and not due to abuse. Primary data collection from ED records was undertaken and information recoded to assess reliability and completeness. Emergency department data (QISU) was linked to Department of Child Safety Data to examine concordance and data quality. Factors influencing the collection and collation of these data were identified through structured interview methodology and analysed using qualitative methods. Secondary analysis of QISU data indicated that codes lacking specific information on the injury event were more likely to also have an intent code indicating abuse than those records where there was specific information on the injury event. Codes for abuse appeared in only 1.2% of the 84,765 records analysed. Unintentional injury was the most commonly coded intent (95.3%). In the group with a definite abuse code assigned at triage, 83% linked to a record with DCS and cases where documentation indicated police involvement were significantly more likely to be associated with a DCS record than those without such documentation. In those coded with an unintentional injury code, 22% linked to a DCS record with cases assigned an urgent triage category more likely to link than those with a triage category for resuscitation and children who presented to regional or remote hospitals more likely to link to a DCS record than those presenting to urban hospitals. Twenty-nine per cent of cases with a code indicating possible abuse linked to a DCS record. In documentation that indicated police involvement in the case, a code for unspecified activity when compared to cases with a code indicating involvement in a sporting activity and children less than 12 months of age compared to those in the 13-17 year old age group were all variables significantly associated with linkage to a DCS record. Only 13% of records contained documentation indicating that child abuse and neglect were considered in the diagnosis of the injury despite almost half of the sample having a code of abuse or possible abuse. Doctors and nurses were confident in their knowledge of the process of reporting child maltreatment but less confident about identifying child abuse and neglect and what should be reported. Many were concerned about implications of reporting, for the child and family and for themselves. A number were concerned about the implications of not reporting, mostly for the wellbeing of the child and a few in terms of their legal obligations as mandatory reporters. The outcomes of this research will help improve the knowledge of barriers to effective surveillance of child abuse in emergency departments. This will, in turn, ensure better identification and reporting practises; more reliable official statistical collections and the potential of flagging high-risk cases to ensure adequate departmental responses have been initiated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The 2011 floods in Southeast Queensland had a devastating impact on many sectors including transport. Road and rail systems across all flooded areas of Queensland were severely affected and significant economic losses occurred as a result of roadway and railway closures. Travellers were compelled to take alternative routes because of road closures or deteriorated traffic conditions on their regular route. Extreme changes in traffic volume can occur under such scenarios which disrupts the network re-equilibrium and re-stabilisation in the recovery phase as travellers continuously adjust their travel options. This study explores how travellers respond to such a major network disruption. A comprehensive study was undertaken focusing on how bus riders reacted to the floods in Southeast Queensland by comparing the ridership patterns before, during and after the floods. The study outcomes revealed the evolving reactions of transit users to direct and indirect impacts of a natural disaster. A good understanding of this process is crucial for developing appropriate strategies to encourage modal shift of automobile users to public transit and also for modelling of travel behaviours during and after a major network disruption caused by natural disasters.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The International Road Assessment Program (iRAP) is a not-for-profit organisation that works in partnership with governments and non-government organisations in all parts of the world to make roads safe. The iRAP Malaysia pilot study on 3,700km of road identified the potential to save 31,800 deaths and serious injuries over the next 20 years from proven engineering improvements. To help ensure the iRAP data and results are available to planners and engineers, iRAP, together with staff from the Centre for Accident Research and Road Safety – Queensland (CARRS-Q) and the Malaysian Institute of Road Safety Research (MIROS) developed a 5-day iRAP training course that covers the background, theory and practical application of iRAP protocols, with a special focus on Malaysian case studies. Funding was provided by a competitive grant from the Australian-Malaysia Institute.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis used Critical Discourse Analysis to investigate how a government policy and the newsprint media constructed discussion about young people’s participation in education or employment. The study found that a continuous narrative across both sites about government as a noble agent taking action to redress the social disruption caused by young people’s disengagement. Unlike the education policy, the newsprint media blamed young people who were disengaged and failed to recognise the barriers they often face. The study points to possibilities for utilising the power of narrative to build a more fair and rigorous discussion of issues in the public sphere.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Current literature warns organisations about a global ageing phenomenon. Workplace ageing is causing a diminishing work pool which has consequences for a sustainable workforce in the future. This phenomenon continues to impact on local government councils in Australia. Australia has one of the world’s most rapidly ageing populations, and there is evidence that Australian local government councils are already resulting in an unsustainable workforce. Consequently, this research program investigated the role of older workers in the Queensland local government workplace in enabling them to extend their working lives towards transitional employment and a sustainable workforce in the future. Transitional Employment is intended as a strategy for enabling individuals to have greater control over their employment options and their employability during the period leading to their final exit from the workforce. There was no evidence of corporate support for older workers in Queensland local government councils other than tokenistic government campaigns encouraging organisations to "better value their older workers". (Queensland Government, 2007d, p.6). TE is investigated as a possible intervention for older workers in the future. The international and national literature review reflected a range of matters impacting on current older workers in the workforce and barriers preventing them from accessing services towards extending their employment beyond the traditional retirement age (60 years) as defined by the Australian Government; an age when individuals can access their superannuation. Learning and development services were identified as one of those barriers. There was little evidence of investment in or consistent approaches to supporting older workers by organisations. Learning and development services appeared at best to be ad hoc, reactive to corporate productivity and outputs with little recognition of the ageing phenomenon (OECD, 2006, p.23) and looming skills and labour shortages (ALGA, 2006, p. 19). Themes from the literature review led to the establishment of three key research questions: 1. What are the current local government workforce issues impacting on skills and labour retention? 2. What are perceptions about the current workplace environment? And, 3. What are the expectations about learning and development towards extending employability of older workers within the local government sector? The research questions were explored by utilising three qualitative empirical studies, using some numerical data for reporting and comparative analysis. Empirical Study One investigated common themes for accessing transitional employment and comprised two phases. A literature review and Study One data analysis enabled the construction of an initial Transitional Employment Model which includes most frequent themes. Empirical Study Two comprised focus groups to further consider those themes. This led to identification of issues impacting the most on access to learning and development by older workers and towards a revised TEM. Findings presented majority support for transitional employment as a strategy for supporting older workers to work beyond their traditional retirement age. Those findings are presented as significant issues impacting on access to transitional employment within the final 3-dimensionsal TEM. The model is intended as a guide for responding to an ageing workforce by local government councils in the future. This study argued for increased and improved corporate support, particularly for learning and development services for older workers. Such support will enable older workers to maintain their employability and extend their working lives; a sustainable workforce in the future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research is part of a major project with a stimulus that rose from the need to manage a large number of ageing bridges in low traffic volume roads (LTVR) in Australia. The project investigated, designed and consequently constructed, involved replacing an ageing super-structure of a 10m span bridge with a disused Flat-bed Rail Wagon (FRW). This research, therefore, is developed on the premises that the FRW can be adopted as the main structural system for the bridges in LTVR network. The main focus of this research is to present two alternate deck wearing systems (DWS) as part of the design of the FRW as road bridge deck conforming to AS5100 (2004). The bare FRW structural components were first examined for their adequacy (ultimate and serviceability) in resisting the critical loads specified in AS5100(2004). Two options of DWSs were evaluated and their effects on the FRW examined. The first option involved usage of timber DWS; the idea of this option was to use all the primary and secondary members of the FRW in load sharing and to provide additional members where weaknesses in the original members arose. The second option involved usage of reinforced concrete DWS with only the primary members of the FRW sharing the AS5100 (2004) loading. This option inherently minimised the risk associated with any uncertainty of the secondary members to their structural adequacy. This thesis reports the design phases of both options with conclusions of the selection of the ideal option for better structural performance, ease of construction and cost. The comparison carried out here focuses on the distribution of the traffic load by the FRW as a superstructure. Advantages and disadvantages highlighting cost comparisons and ease of constructability of the two systems are also included.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Critical road infrastructure (such as tunnels and overpasses) is of major significance to society and constitutes major components of interdependent, ‘systems and networks’. Failure in critical components of these wide area infrastructure systems can often result in cascading disturbances with secondary and tertiary impacts - some of which may become initiating sources of failure in their own right, triggering further systems failures across wider networks. Perrow1) considered the impact of our increasing use of technology in high-risk fields, analysing the implications on everyday life and argued that designers of these types of infrastructure systems cannot predict every possible failure scenario nor create perfect contingency plans for operators. Challenges exist for transport system operators in the conceptualisation and implementation of response and subsequent recovery planning for significant events. Disturbances can vary from reduced traffic flow causing traffic congestion throughout the local road network(s) and subsequent possible loss of income to businesses and industry to a major incident causing loss of life or complete loss of an asset. Many organisations and institutions, despite increasing recognition of the effects of crisis events, are not adequately prepared to manage crises2). It is argued that operators of land transport infrastructure are in a similar category of readiness given the recent instances of failures in road tunnels. These unexpected infrastructure failures, and their ultimately identified causes, suggest there is significant room for improvement. As a result, risk profiles for road transport systems are often complex due to the human behaviours and the inter-mix of technical and organisational components and the managerial coverage needed for the socio-technical components and the physical infrastructure. In this sense, the span of managerial oversight may require new approaches to asset management that combines the notion of risk and continuity management. This paper examines challenges in the planning of response and recovery practices of owner/operators of transport systems (above and below ground) in Australia covering: • Ageing or established infrastructure; and • New-build infrastructure. With reference to relevant international contexts this paper seeks to suggest options for enhancing the planning and practice for crisis response in these transport networks and as a result support the resilience of Critical Infrastructure.