547 resultados para Project Malungo
Resumo:
Queensland, Australia has one of the highest rates of skin cancer in the world. Outdoor workers are regularly exposed to high doses of ultraviolet radiation, and are at increased risk to develop non-melanoma and melanoma skin cancers. In 2010, a health promotion intervention to improve sun protection among outdoor workers in Queensland commenced. The intervention employed a mixed methods approach and a participatory action research framework. Fourteen workplaces were recruited from building and construction, rural and farming, local government, and public sector organisations. Management and workers were engaged in cycles of assessment, reflection and discussion, planning, implementation and reassessing, over a 14-month intervention period. Overall, at least one workplace representative from each workplace (range 1-3) and in depth focus groups were held with a subset of workers (range 3-16) to assess sun safe behaviours pre and post intervention. Workers’ attitudes, beliefs, knowledge and willingness to engage in sun protection differed depending on workplace characteristics and support. A familiar theme among workers spoke of sun safety as being “common sense” and the “workers individual responsibility”. Often there was a discrepancy in the perceptions of the workers, compared to the view of workplace representatives and the workplaces position or policy on sun safety. In larger workplaces, especially Government Departments, workers were more aware and followed sun safe practices compared to smaller workplaces where sun safety was not a high priority. These results indicate that a workplace culture which places high values on safety and polices more broadly may also have a positive effect on sun safety among outdoor workers as well. In addition, the specific characteristics of the workplace and the outdoor work tasks influence workers willingness to engage in sun safety measures.
Resumo:
Sweden’s protest against the Vietnam War was given tangible form in 1969 through the decision to give economic aid to the Government of North Vietnam. The main outcome was an integrated pulp and paper mill in the Vinh Phu Province north-west of Hanoi. Known as Bai Bang after its location, the mill became the most costly, one of the longest lasting and the most controversial project in the history of Swedish development cooperation. In 1996 Bai Bang produced at its full capacity. Today the mill is exclusively managed and staffed by the Vietnamese and there are plans for future expansion. At the same time a substantial amount of money has been spent to reach these achievements. Looking back at the cumbersome history of the project the results are against many’s expectations. To learn more about the conditions for sustainable development Sida commissioned two studies of the Bai Bang project. Together they touch upon several important issues in development cooperation over a period of almost 30 years: the change of aid paradigms over time, the role of foreign policy in development cooperation, cultural obstacles, recipient responsibility versus donor led development etc. The two studies were commissioned by Sida’s Department for Evaluation and Internal Audit which is an independent department reporting directly to Sida’s Board of Directors. One study assesses the financial and economic viability of the pulp and paper mill and the broader development impact of the project in Vietnam. It has been carried out by the Centre for International Economics, an Australian private economic research agency. The other study analyses the decision-making processes that created and shaped the project over a period of two decades, and reflects on lessons from the project for development cooperation in general. This study has been carried out by the Chr. Michelsen Institute, a Norweigan independent research institution.
Resumo:
This report documents the key findings of a year-long collaborative research project focusing on the London Symphony Orchestra’s (LSO) development, implementation and testing of a mobile ticketing and information system. This ticketing system was developed in association with the LSO’s technical partners, Kodime Limited and in collaboration with the Aurora Orchestra.
Resumo:
Research background For almost 80 years the Chuck Taylor (or Chuck T's) All Star basketball shoe has been an iconic item of fashion apparel. The Chuck T's were first designed in 1921 by Converse, an American shoe company and over the decades they became a popular item not purely for sports and athletic purposes but rather evolved into the shoe of choice for many subcultural groups as a fashion item. In some circles the Chuck Taylor is still seen as the "coolest" sneaker of all time - one which will never go out of fashion regardless of changing trends. With over 600 millions pairs sold all over the world since its release, the Converse shoe is representative of not only a fashion culture - but also of a consumption culture - that evolved as the driving force behind the massive growth of the Western economic system during the 20th Century. Artisan Gallery (Brisbane), in conjunction with the exhibition Reboot: Function, Fashion and the Sneaker, a history of the sneaker, selected 20 designers to customise and re-design the classic Converse Chuck Taylor All Stars shoe and in doing so highlighted the diversity of forms possible for creative outcomes. As Artisan Gallery Curator Kirsten Fitzpatrick states “We were expecting people to draw and paint on them. Instead, we had shoes... mounted as trophies.." referring to the presentation of "Converse Consumption". The exhibition ran from 21 June – 16 August 2012: Research question The Chuck T’s is one of many overwhelmingly commercially successful designs of the last century. Nowadays we are faced with the significant problems of overconsumption and the stress this causes on the natural ecosystem; and on people as a result. As an active member of the industrial design fraternity – a discipline that sits at the core of this problem - how can I use this opportunity to comment on the significant issue of consumption? An effective way to do this was to associate consumption of goods with consumption of sugar. There are significant similarities between our ceaseless desires to consume products and our fervent need to consume indulgent sweet foods. Artisan Statement Delicious, scrumptious, delectable... your pupils dilate, your blood pressure spikes, your liver goes into overdrive. Immediately, your brain cuts off the adenosine receptors, preventing drowsiness. Your body increases dopamine production, in-turn stimulating the pleasure receptors in your brain. Your body absorbs all the sweetness and turns it into fat – while all the nutrients that you actually require are starting to be destroyed, about to be expelled. And this is only after one bite! After some time though, your body comes crashing back to earth. You become irritable and begin to feel sluggish. Your eyelids seem heavy while your breathing pattern changes. Your body has consumed all the energy and destroyed all available nutrients. You literally begin to shut down. These are the physiological effects of sugar consumption. A perfect analogy for our modern day consumer driven world. Enjoy your dessert! Research contribution “Converse Consumption” contributes to the conversation regarding over-consumption by compelling people to reflect on their consumption behaviour through the reconceptualising of the deconstructed Chuck T’s in an attractive edible form. By doing so the viewer has to deal with the desire to consume the indulgent looking dessert with the contradictory fact that it is comprised of a pair of shoes. The fact that the shoes are Chuck T’s make the effect even more powerful due to their iconic status. These clashing motivations are what make “Converse Consumption” a bizarre yet memorable experience. Significance The exhibition was viewed by an excess of 1000 people and generated exceptional media coverage and public exposure/impact. As Artisan Gallery Curator Kirsten Fitzpatrick states “20 of Brisbane's best designers were given the opportunity to customise their own Converse Sneakers, with The Converse Blank Canvas Project.” And to be selected in this category demonstrates the calibre of importance for design prominence.
Resumo:
The Lake Wivenhoe Integrated Wireless Sensor Network is conceptually similar to traditional SCADA monitoring and control approaches. However, it is applied in an open system using wireless devices to monitor processes that affect water quality at both a high spatial and temporal frequency. This monitoring assists scientists to better understand drivers of key processes that influence water quality and provide the operators with an early warning system if below standard water enters the reservoir. Both of these aspects improve the safety and efficient delivery of drinking water to the end users.
Resumo:
Current research into project management offices (PMOs) has stressed the PMOs' potential to act as knowledge brokers between projects, and between project and top management. Nonetheless, the literature does not provide sufficient evidence of the brokering role of PMOs. The research reported here aims to examine PMO's functions from a knowledge sharing perspective and explore whether or not these functions reflect the knowledge sharing needs of project managers (PMs). These issues are investigated through a cross-case analysis of seven organisations. The main contribution is insight into how PMs share knowledge and awareness of the need to structure PMOs to align with PMs' nature, needs and expectations in order to improve knowledge sharing in PBOs. Finally, some practical steps for helping PMOs to better adapt their functions to the needs of PMs and their learning and knowledge sharing style are proposed.
Resumo:
This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how knowledge governance mechanisms can move the organization towards desired knowledge-based goals. A multiple-case study comprising 23 cases advances our understanding of the elements that trigger, enable, hamper, and drive shifting, leveraging and adapting. Finally, the paper offers a tentative framework of dynamic capability building promoting project competence development.
Resumo:
This paper conceptualizes knowledge governance (KG) in project-based organizations (PBOs) and its methodological approaches for empirical investigation. Three key contributions towards a multi-faceted view of KG and an understanding of KG in PBOs are advanced. These contributions include a definition of KG in PBOs, a conceptual framework to investigate KG and a methodological framework for empirical inquiry into KG in PBO settings. Our definition highlights the contingent nature of KG processes in relation to their organizational context. The conceptual framework addresses macro- and micro-level elements of KG and their interaction. The methodological framework proposes five different research approaches, structured by differentiation and integration of various ontological and epistemological stances. Together these contributions provide a novel platform for understanding KG in PBOs and developing new insights into the design and execution of research on KG within PBOs.
Resumo:
Background The prevalence of type 2 diabetes is rising internationally. Patients with diabetes have a higher risk of cardiovascular events accounting for substantial premature morbidity and mortality, and health care expenditure. Given healthcare workforce limitations, there is a need to improve interventions that promote positive self-management behaviours that enable patients to manage their chronic conditions effectively, across different cultural contexts. Previous studies have evaluated the feasibility of including telephone and Short Message Service (SMS) follow up in chronic disease self-management programs, but only for single diseases or in one specific population. Therefore, the aim of this study is to evaluate the feasibility and short-term efficacy of incorporating telephone and text messaging to support the care of patients with diabetes and cardiac disease, in Australia and in Taiwan. Methods/design A randomised controlled trial design will be used to evaluate a self-management program for people with diabetes and cardiac disease that incorporates the use of simple remote-access communication technologies. A sample size of 180 participants from Australia and Taiwan will be recruited and randomised in a one-to-one ratio to receive either the intervention in addition to usual care (intervention) or usual care alone (control). The intervention will consist of in-hospital education as well as follow up utilising personal telephone calls and SMS reminders. Primary short term outcomes of interest include self-care behaviours and self-efficacy assessed at baseline and four weeks. Discussion If the results of this investigation substantiate the feasibility and efficacy of the telephone and SMS intervention for promoting self management among patients with diabetes and cardiac disease in Australia and Taiwan, it will support the external validity of the intervention. It is anticipated that empirical data from this investigation will provide valuable information to inform future international collaborations, while providing a platform for further enhancements of the program, which has potential to benefit patients internationally.
Resumo:
In this paper, we develop and test a model of the relationships between mega-project leaders’ personal attributes and their ratings of project success in the context of the Australian defense industry. In our model, emotional intelligence, cognitive flexibility, and systemic thinking were hypothesized to be related to project success ratings, mediated by internal and external stakeholder relationships. We tested the model in an online survey study of 373 mega-project leaders. Results were that emotional intelligence and cognitive flexibility were found to be related to the quality of mega-project leader’s relationships with both internal and external stakeholders; and that these relationships in turn were found to be associated with the project leaders’ ratings of project success. We found however that systemic thinking had no relationship with either stakeholder relationships or ratings of project success. We conclude with a discussion of the implications of these findings and make recommendations for future research. In particular, additional research is needed to examine the contribution of a wider range of competencies on stakeholder relationships and project success in mega-projects, and that there is also a need for research in future to attempt to use more objective ratings of project success.
Resumo:
Defence projects are typically undertaken within a multi-project-management environment where a common agenda of project managers is to achieve higher project efficiency. This study adopted a multi-facet qualitative approach to investigate factors contributing to or impeding project efficiency in the Defence sector. Semi-structured interviews were undertaken to identify additional factors to those compiled from the literature survey. This was followed by a three-round Delphi study to examine the perceived critical factors of project efficiency. The results showed that project efficiency in the Defence sector went beyond its traditional internally focused scope to one that is externally focused. As a result, efforts are needed on not only those factors related to individual projects but also those factors related to project inter-dependencies and external customers. The management of these factors will help to enhance the efficiency of a project within the Defence sector.
Resumo:
Purpose - Cultural issues in the construction industry have attracted growing attention from both practitioners and academia. However, there are few studies on culture issues at the project level. The influence of project culture has not traditionally been on the research radar. This research aims to investigate the impacts of project culture on the performance of construction projects. Design/methodology/approach - A case study approach, utilising questionnaire surveys, in-depth interviews and review of project documents, was employed to investigate project culture and its associated impacts in two major hospital projects. Findings - The results indicated that project culture played an important role in achieving harmonious relationships between project participants and better project outcomes in terms of schedule, functionality, satisfaction with the process, satisfaction with the relationships, environmental issues addressed commercial success, further business opportunities and overall performance. Case 1 outperformed Case 2 in these performance indicators. Similarly, it became clear that the project’s culture should be developed from the outset and sustained during the project period. Furthermore, it was also highlighted that the project culture should be translated to all levels of the supply chain i.e. sub-contractors and suppliers. Practical implications – The findings enabled the client to understand the role of project culture and actively commit towards the development and maintenance of the project culture from very early on. It also helps project teams to understand how to deal with cultural issues at the project level. Originality/value- This study is one of limited empirical studies that offer in-depth insights of how project culture affects the performance of construction projects. It is also the first study of hospital projects on the research topic.
Resumo:
Managing public sector projects in Malaysia is a unique challenge. This is because of the ethical issues involved during the project procurement process. These ethical issues need attention because they will have an impact on the quality, cost and time of the project itself. The ethical issues here include conflict of interest, bid shopping, collusive tendering, bid cutting, corruption and the payment game. In 2006, 17.3% of 417 Malaysian government contract projects were considered sick due to contractors' performances that failed to conduct the project according to the project plan. Some of the sick projects from these statistics are due to the ethical issues involved. These construction projects have low quality due to the selection of the contractors, done unethically due to personal relationships instead of professional qualifications. That is why it is important to govern the project procurement processes to ensure the accountability and transparency of the decision making process to ensure that these ethical issues can be avoided. Extensive research has been conducted on the ethical issues in the tendering process or the award phase of project management. There is a lack of studies looking at the role of clients, including the government client, in relation to unethical practice in project procurement in the public sector. It is important to understand that ethical issues not only involve the contractors and suppliers but also the clients. Even though there are codes of ethics in the public sectors, ethical issues still arise. Therefore, this research develops a project governance framework (PGEDM) for ethical decision making in the Malaysian public sectors. This framework combines the ethical decision making process together with the project governance principals in guiding the public sectors with ethical decision making in project procurement. A triangulation of questionnaire survey and Delphi study was employed in this research to collect required qualitative and quantitative data. A questionnaire survey was conducted among the public officials (the practitioners) who are currently working in the procurement area in the Malaysian public sectors, in identifying the ethical behaviours and factors influencing further ethical behaviour to occur. A Delphi study was also conducted with the assistance of a panel of experts consisting of practitioners that have expertise in the area of project governance and project procurement as well as academician, which further considered the relationship and the influence of the criteria and indicators of ethical decision making (EDM) and project governance (project criteria, organisational culture, contract award criteria, individual criteria, client's requirements, government procedures and professional ethics). Through the identification and integration of the factors and EDM criteria as well as the project governance criteria and EDM steps for ethical issues, a PGEDM framework was developed to promote, and drive consistent decision outcome in project procurement in the public sector. The framework contributes significantly to ethical decision making in the project procurement process. These findings not only give benefit to the people involved in project procurement but also to the public officials in guiding them to be more accountable in handling ethical issues in the future and to have a more transparent decision making process.
Resumo:
Nowadays, most of the infrastructure development projects undertaken are complex in nature. Practically, public clients who do not have a good understanding of the design and management may suffer severe losses, especially for infrastructure projects. There is a need for luring the right consultant to secure client's investment in infrastructure developments. Throughout the project life cycle, consultants play vital role from the inception to completion stage of a project. A few studies in Malaysia show that infrastructure projects involving irrigation and drainage have experience problems such as poor workmanship, delay and cost overrun due to the consultant's inability or the client incompetence of recruiting consultants in time. This highlights the need of aided decision making and an efficient system to select the best consultant by using Decision Support System (DSS). On the other hand, recent trends reveal that most DSS in construction only concentrate on decision model development. These models are impractical and unused as they are complicated or difficult for laymen such as project managers to utilize. Thus, this research attempts to develop an efficient DSS for consultant selection namely consultDeSS. Driven by the motivation and research aims, this study deployed Design Science Research Methodology (DSRM) dominant with a combination of case studies at the Malaysian Department of Irrigation and Drainage (DID). Two real projects involving irrigation and drainage infrastructure were used to design, implement and evaluate the artefact. The 3-tier consultDeSS was revised after the evaluation and the design was significantly improved based on user feedback. By developing desirable tools that fit client's needs will enhance the productivity and minimize conflict within groups and organisations. The tool is more usable and efficient compared to previous studies in construction. Thus, this research has demonstrated a purposeful artefact with a practical and valid structured development approach that is applicable in a variety of problems in construction discipline.
Resumo:
The Beyond Compliance project, which began in July 2011 with funding from the Standards and Trade Development Facility for 2 years, aims to enhance competency and confidence in the South East Asian sub-region by applying a Systems Approach for pest risk management. The Systems Approach involves the use of integrated measures, at least two of which are independent, that cumulatively reduce the risk of introducing exotic pests through trade. Although useful in circumstances where single measures are inappropriate or unavailable, the Systems Approach is inherently more complicated than single-measure approaches, which may inhibit its uptake. The project methodology is to take prototype decision-support tools, such as Control Point-Bayesian Networks (CP-BN), developed in recent plant health initiatives in other regions, including the European PRATIQUE project, and to refine them within this sub-regional context. Case studies of high-priority potential agricultural trade will be conducted by National Plant Protection Organizations of participating South East Asian countries in trials of the tools, before further modifications. Longer term outcomes may include: more robust pest risk management in the region (for exports and imports); greater inclusion of stakeholders in development of pest risk management plans; increased confidence in trade negotiations; and new opportunities for trade.