363 resultados para Small-sized hospitals
Resumo:
The importance of repair, maintenance, minor alteration, and addition (RMAA) works is increasing in many built societies. When the volume of RMAA works increases, the occurrence of RMAA accidents also increases. Safety of RMAA works deserves more attention; however, research in this important topic remains limited. Safety climate is considered a key factor that influences safety performance. The present study aims to determine the relationships between safety climate and safety performance of RMAA works, thereby offering recommendations on improving RMAA safety. Questionnaires were dispatched to private property management companies, maintenance sections of quasi-government developers and their subcontractors, RMAA sections of general contractors, small RMAA contractors, building services contractors and trade unions in Hong Kong. In total, data from 396 questionnaires were collected from RMAA workers. The sample was divided into two equal-sized sub-samples. On the first sub-sample SEM was used to test the model, which was validated on the second sub-sample. The model revealed a significant negative relationship between RMAA safety climate and incidence of self-reported near misses and injuries, and significant positive relationships between RMAA safety climate and safety participation and safety compliance respectively. Higher RMAA safety climate was positively associated with a lower incidence of self-reported near misses and injuries and higher levels of safety participation and safety compliance.
Resumo:
The concept of cloud computing services is appealing to the small and medium enterprises (SMEs), with the opportunity to acquire modern information technology resources as a utility and avoid costly capital investments in technology resources. However, the adoption of the cloud computing services presents significant challenges to the SMEs. The SMEs need to determine a path to adopting the cloud computing services that would ensure their sustainable presence in the cloud computing environment. Information about approaches to adopting the cloud computing services by the SMEs is fragmented. Through an interpretive design, we suggest that the SMEs need to have a strategic and incremental intent, understand their organizational structure, understand the external factors, consider the human resource capacity, and understand the value expectations from the cloud computing services to forge a successful path to adopting the cloud computing services. These factors would contribute to a model of cloud services for SMEs.
Resumo:
A salient but rarely explicitly studied characteristic of interfirm relationships is that they can intentionally be formed for finite periods of time. What determines firms' intertemporal choices between different alliance time horizons? Shadow of the future theorists suggest that when an alliance has an explicitly set short-term time frame, there is an increased risk that partners may behave opportunistically. This does not readily explain the high incidence of time-bound alliances being formed. Reconciling insights from the shadow of the future perspective with nascent research on the flexibility of temporary organizations, and shifting the focus from the level of individual transactions to that of strategic alliance portfolios, we argue that firms may be willing to accept a higher risk of opportunism when there are offsetting gains in strategic flexibility in managing their strategic alliance portfolio. Consequently, we hypothesize that environmental factors that increase the need for strategic flexibility—namely, dynamism and complexity in the environment—are likely to increase the relative share of time-bound alliances in strategic alliance portfolios. Our analysis of longitudinal data on the intertemporal alliance choices of a large sample of small and medium-sized enterprises provides support for this argument. Our findings fill an important gap in theory about time horizons in interfirm relationships and temporary organizations and show the importance of separating planned terminations from duration-based performance measures.