421 resultados para Construction management and engineering - China


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The state of the practice in safety has advanced rapidly in recent years with the emergence of new tools and processes for improving selection of the most cost-effective safety countermeasures. However, many challenges prevent fair and objective comparisons of countermeasures applied across safety disciplines (e.g. engineering, emergency services, and behavioral measures). These countermeasures operate at different spatial scales, are funded often by different financial sources and agencies, and have associated costs and benefits that are difficult to estimate. This research proposes a methodology by which both behavioral and engineering safety investments are considered and compared in a specific local context. The methodology involves a multi-stage process that enables the analyst to select countermeasures that yield high benefits to costs, are targeted for a particular project, and that may involve costs and benefits that accrue over varying spatial and temporal scales. The methodology is illustrated using a case study from the Geary Boulevard Corridor in San Francisco, California. The case study illustrates that: 1) The methodology enables the identification and assessment of a wide range of safety investment types at the project level; 2) The nature of crash histories lend themselves to the selection of both behavioral and engineering investments, requiring cooperation across agencies; and 3) The results of the cost-benefit analysis are highly sensitive to cost and benefit assumptions, and thus listing and justification of all assumptions is required. It is recommended that a sensitivity analyses be conducted when there is large uncertainty surrounding cost and benefit assumptions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Current literature has established that organisational culture influences knowledge management efforts; however, it is only recently that research on project management has focused its interest on organisational culture in the context of knowledge sharing and some preliminary studies have been conducted. In response, this paper adds a significant contribution by providing rich empirical evidence of the relationships between culture and the willingness to share knowledge, demonstrating which cultural values are more and which are less likely to improve inter-project knowledge sharing behaviours. The use of interviews and the Organisational Culture Assessment Instrument (OCAI) (Cameron & Quinn, 2005) in the cross-case examination of culture in four participating cases has resulted in rich empirical contributions. Furthermore, this paper adds to the project management literature by introducing the Competing Values Framework (CVF) of Cameron and Quinn (2005) to evaluate knowledge sharing in the inter-project context.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A pressing cost issue facing construction is the procurement of off-site pre-manufactured assemblies. In order to encourage Australian adoption of off-site manufacture (OSM), a new approach to underlying processes is required. The advent of object oriented digital models for construction design assumes intelligent use of data. However, the construction production system relies on traditional methods and data sources and is expected to benefit from the application of well-established business process management techniques. The integration of the old and new data sources allows for the development of business process models which, by capturing typical construction processes involving OSM, provides insights into such processes. This integrative approach is the foundation of research into the use of OSM to increase construction productivity in Australia. The purpose of this study is to develop business process models capturing the procurement, resources and information flow of construction projects. For each stage of the construction value chain, a number of sub-processes are identified. Business Process Modelling Notation (BPMN), a mainstream business process modelling standard, is used to create base-line generic construction process models. These models identify OSM decision-making points that could provide cost reductions in procurement workflow and management systems. This paper reports on phase one of an on-going research aiming to develop a proto-type workflow application that can provide semi-automated support to construction processes involving OSM and assist in decision-making in the adoption of OSM thus contributing to a sustainable built environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper analyses the profits from 221 construction projects undertaken by an Australian building firm in the period 1910–1938 and examines the factors that influence the firm's profit levels. This involves a series of multiple regression analyses with three dependent variables representing profit and 26 independent variables representing economic conditions and project characteristics. From these, 11 models are derived of which two are chosen as having the best explanatory power in explaining approximately 72% of the variability in profit levels movements. The results show that unemployment, interest rates, level of construction activity in the state, change of wage level, inflation rate of building material and project value significantly influenced the firm's profit level during the period.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A multivariate approach to bidding strategy is presented in comparison with previous standard approaches. An optimal formulation is derived and a method of parameter estimation proposed. A case study illustrates the derivation of optimal and other strategic mark up values against a single bidder. Concluding remarks concern extensions to multiple competitors differing levels of information, and sensitivity analysis.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

While scientists continue to explore the level of climate change impact to new weather patterns and our environment in general, there have been some devastating natural disasters worldwide in the last two decades. Indeed natural disasters are becoming a major concern in our society. Yet in many previous examples, our reconstruction efforts only focused on providing short-term necessities. How to develop resilience in the long run is now a highlight for research and industry practice. This paper introduces a research project aimed at exploring the relationship between resilience building and sustainability in order to identify key factors during reconstruction efforts. From extensive literature study, the authors considered the inherent linkage between the two issues as evidenced from past research. They found that sustainability considerations can improve the level of resilience but are not currently given due attention. Reconstruction efforts need to focus on resilience factors but as part of urban development, they must also respond to the sustainability challenge. Sustainability issues in reconstruction projects need to be amplified, identified, processed, and managed properly. On-going research through empirical study aims to establish critical factors (CFs) for stakeholders in disaster prone areas to plan for and develop new building infrastructure through holistic considerations and balanced approaches to sustainability. A questionnaire survey examined a range of potential factors and the subsequent data analysis revealed six critical factors for sustainable Post Natural Disaster Reconstruction that include: considerable building materials and construction methods, good governance, multilateral coordination, appropriate land-use planning and policies, consideration of different social needs, and balanced combination of long-term and short-term needs. Findings from this study should have an influence on policy development towards Post Natural Disaster Reconstruction and help with the achievement of sustainable objectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines the role of compensation and risk committees in managing and monitoring the risk behaviour of Australian financial firms in the period leading up to the global financial crisis (2006–2008). This empirical study of 711 observations of financial sector firms demonstrates how the coordination of risk management and compensation committees reduces information asymmetry. The study shows that the composition of the risk and compensation committees is positively associated with risk, which, in turn, is associated with firm performance. More importantly, information asymmetry is reduced when a director is a member of both the risk and compensation committees which moderate the negative association between risk and firm performance for firms with high risk.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Two approaches are described, which aid the selection of the most appropriate procurement arrangements for a building project. The first is a multi-attribute technique based on the National Economic Development Office procurement path decision chart. A small study is described in which the utility factors involved were weighted by averaging the scores of five 'experts' for three hypothetical building projects. A concordance analysis is used to provide some evidence of any abnormal data sources. When applied to the study data, one of the experts was seen to be atypical. The second approach is by means of discriminant analysis. This was found to provide reasonably consistent predictions through three discriminant functions. The analysis also showed the quality criteria to have no significant impact on the decision process. Both approaches provided identical and intuitively correct answers in the study described. Some concluding remarks are made on the potential of discriminant analysis for future research and development in procurement selection techniques.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This chapter contains sections titled: Introduction ICZM and sustainable development of coastal zone International legal framework for ICZM Implementation of international legal obligations in domestic arena Concluding remarks References

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The natural disasters incident that frequently hit Indonesia are floods, severe droughts, tsunamis, earth-quakes, volcano, eruptions, landslides, windstorm and forest fires. The impact of those natural disasters are significantly severe and affecting the quality of life of the community due to the breakdown of the public as-sets as one source to deliver public services. This paper is aimed to emphasis the importance of natural disaster risk-informed in relation to public asset management in Indonesian Central Government, particularly in asset planning stage where asset decision is made as the gate into the whole public asset management processes. A Case study in the Ministry of Finance Indonesia as the central government public asset manager and in 5 (five) line ministries/governmental agencies as public asset users was used as the approach to achieved the research objective. The case study devoured three data collection techniques i.e. interviews, observations and document archival which will be analysed by a content analysis approach. The result of the study indicates that Indonesian geographical position exposing many of public infra-structure assets as a high vulnerability to natural disasters. Information on natural-disaster trends and predictions to identify and measure the risks are available, however, such information are not utilise and integrated to the process of public infrastructure asset planning as the gate to the whole public asset management processes. Therefore, in order to accommodate and incorporate this natural disaster risk-information into public asset management processes, particularly in public asset planning, a public asset performance measurements framework should be adopted and applied in the process as one sources in making decision for infrastructure asset planning. Findings from this study provide useful input for the Ministry of Finance as public asset manager, scholars and private asset management practitioners in Indonesia to establish natural disaster risks awareness in public infrastructure asset management processes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As the adoption of project financing is gaining momentum, there is a concurrent need of innovation in project financing scheme in order to accelerate infrastructure assets provision in Indonesia. As the largest Muslim population in the world, sharia-compliant financing offers tremendous potential as a source for infrastructure financing for Indonesia. To realize this potential, there is a need of a framework to guide its adoption. Hence this paper discusses the potential implementation of Islamic finance to fund infrastructure projects in Indonesia. Through comparative analysis, this paper illustrates how Islamic principles can be incorporated into Indonesian infrastructure project financing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: The challenges of providing housing that sustains its inhabitants socially, economically and environmentally, and is inherently sustainable for the planet as a whole, requires a holistic systems approach that considers the product, the supply chain and the market, as well as the inter-dependencies within and between each of these process points. The purpose of the research is to identify factors that impact the sustainability performance outcomes of residential dwellings and the diffusion of sustainable housing into the mainstream housing market. Design/methodology/approach: This research represents a snapshot in time: a recording of the experiences of seven Australian families who are “early adopters” of leading edge sustainable homes within a specific sustainable urban development in subtropical Queensland. The research adopts a qualitative approach to compare the goals and expectations of these families with the actual sustainability aspects incorporated into their homes and lifestyles. Findings: The results show that the “product” – a sustainable house – is difficult to define; that sustainability outcomes were strongly influenced by individual concerns and the contextual urban environment; and that economic comparisons with “standard” housing are challenging. Research limitations/implications: This qualitative study is based on seven families (13 individuals) in an Ecovillage in southeast Queensland. Although the findings make a significant contribution to knowledge, they may not be generalisable to the wider population. Originality/value: The experiences of these early adopter families suggest that the housing market and regulators play critical roles, through actions and language, in limiting or enhancing the diffusion of sustainable housing into the market.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Performance in the construction industry is increasingly scrutinized as a result of the delays, cost overruns and poor quality of the industry’s products and services. Increasingly, disputes, conflicts and mismatches of objectives among participants are contributory factors. Performance measurement approaches have been developed to overcome these problems. However, these approaches focus primarily on objective measures to the exclusion of subjective measures, particularly those concerning contractor satisfaction (Co-S). The contractor satisfaction model (CoSMo) developed here is intended to rectify the situation. Data derived from a questionnaire survey of 75 large contractors in Malaysia in respect of a key project are analysed to identify participant factors and their strength of relationship with Co-S dimensions. The results are presented in the form of eight regression equations. The outcome is a tool for use by project participants to provide a better understanding of how they, and the project, affect contractor satisfaction. The developed model sheds some light on a hitherto unknown aspect of construction management in providing an increased awareness of the importance of major Malaysian construction contractors’ needs in the execution of successful projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The development of toll roads in Indonesia started around 1978. Initially, the management and development of toll roads sat directly under the Government of Indonesia (GoI) being undertaken through PT JasaMarga, a state owned enterprise specifically established to provide toll roads. Due to the slow growth and low capability of toll roads to fulfil infrastructure needs in the first ten years of operation (only 2.688kms/year), GoI changed its strategy in 1989 to one of using private sector participation for roads delivery through a Public Private Partnership (PPP) scheme. In this latter period, PT JasaMarga had two roles, both as regulator on behalf of the private sector as well as being the operator. However, from 1989 to 2004 the growth rate of toll roads actually decreased further to 2.300kms/year. Facing this challenge of low growth rate of toll roads, in 2004GoI changed the toll road management system and the role of regulator was returned to the Government through the establishment of the Toll Road Regulatory Agency (BPJT). GoI also amended the institutional framework to strengthen the toll road management system. Despite the introduction of this new institutional framework, the growth of toll roads still showed insignificant change. This problem in toll road development has generated an urgent need for research into this issue. The aim of the research is to understand the performance of the new institutional framework in enhancing PPP procured toll road development. The methodology of the research was to undertake a questionnaire survey distributed to private sector respondents involved in toll road development. The results of this study show that there are several problems inherent in the institutional framework, but the most significant problem comes from the uncertainty of the function of the strategic executive body in the land expropriation process.