441 resultados para Construction Industry Development


Relevância:

90.00% 90.00%

Publicador:

Resumo:

Based on an investigation of 106 projects involving the use of building information modelling (BIM), this paper examines current BIM practices in China, and assesses how various practices alter their effectiveness. The results reveal that in current practice BIM is principally employed as a visualization tool, and how it is implemented is significantly associated with project characteristics. BIM use in the majority of the surveyed projects is seen to have positive outcomes, with the benefits of improved task effectiveness being more substantial than those related to efficiency improvement. The results also provide evidence that project characteristics significantly influence the success of BIM use; however, more substantial contributing factors to BIM effectiveness are the extent of integrated use and client/owner support. While indicating that current BIM practices involve both technological and organizational problems, the findings also provide insights into how the potential for BIM could be better exploited within the industry.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Although rework is a common phenomenon in the Chinese construction industry and significantly affects project success, the reasons for rework remain largely unknown and most construction companies are unable to manage the issue effectively. To investigate the causes of rework in construction projects, a total of 39 causes were first identified through a comprehensive literature review and semi-structured interviews with 13 experienced construction professionals in China. A questionnaire survey was further conducted to prioritize these causes, in which unclear project process management, poor quality of construction technology, and the use of poor construction materials rank the highest. Finally, a factor analysis revealed 11 major underlying dimensions of these causes, relating to design management, communication management, field management, project scope management, project process management, active rework, project plan changes, subcontractor management, contract management, owner capability, and the external environment. The contribution of this work lies in its examination of the underlying causes of rework perceived by construction professionals in the world’s largest developing country, which is characterized by its unique economic and social systems. In particular, newly identified causes of contract management, active rework, and scope management help expand existing knowledge of the underlying causes of rework for the global construction community.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose The purpose of this paper is to examine equal employment policies in Australia’s male-dominated construction industry and categorise the types of activities undertaken against an equal employment typology to identify links to outcomes for women in the form of increased participation and management. Design/methodology/approach To explore the issue of low representation of women in construction through the content analysis of 83 construction organisations’ equal employment opportunity (EEO) reports. Findings This industry is not engaging with equal employment issues and the numbers of women working in the industry and/or management are based on individual decision rather than an institutional commitment to equality in diversity. Research limitations/implications Australian legislation mandates organisational reporting of relevant data and offers public access to this information offering a unique data set. Practical implications An ageing population means that the predominately older male workforce is leaving construction in greater numbers with fewer potential replacements making new labour markets a vital consideration. Social implications Legislation and organisational policies designed to promote EEO for women have existed in numerous countries for decades. One objective of this legislation was to reduce male domination in senior positions and industries/occupations where women were under-represented. Despite this, few women are employed in construction in operational or management roles worldwide. Originality/value This study offers a comprehensive analysis of a male-dominated industry in one jurisdiction rather than a few selected cases and uses a broader rigorous typology for analysis that acknowledges both equal and different treatment options.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Due to the increasing recognition of global climate change, the building and construction industry is under pressure to reduce carbon emissions. A central issue in striving towards reduced carbon emissions is the need for a practicable and meaningful yardstick for assessing and communicating greenhouse gas (GHG) results. ISO 14067 was published by the International Organization for Standardization in May 2013. By providing specific requirements in the life cycle assessment (LCA) approach, the standard clarifies the GHG assessment in the aspects of choosing system boundaries and simulating use and end-of-life phases when quantifying carbon footprint of products (CFPs). More importantly, the standard, for the first time, provides step-to-step guidance and standardized template for communicating CFPs in the form of CFP external communication report, CFP performance tracking report, CFP declaration and CFP label. ISO 14067 therefore makes a valuable contribution to GHG quantification and transparent communication and comparison of CFPs. In addition, as cradle-to-grave should be used as the system boundary if use and end-of-life phases can be simulated, ISO 14067 will hopefully promote the development and implementation of simulation technologies, with Building Information Modelling (BIM) in particular, in the building and construction industry.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Construction is one of the most hazardous industries due to its dynamic, temporary, and decentralized nature. The Hong Kong Commissioner for Labor identifies worker behavior as the root cause of construction accidents. Behavior-based safety (BBS) is one effective approach in managing employee safety issues. However, there is little research on the application of BBS in the construction industry. This research proposes an extension of the BBS approach, proactive behavior-based safety (PBBS), to improve construction safety. PBBS integrates the theory of BBS with the technology of Proactive Construction Management System (PCMS). The innovations of PBBS are: (1) automatically monitoring location-based behaviors; (2)quantitatively measuring safety performance; (3) investigating potential causes of unsafe behaviors; and (4) improving the efficiency of safety management. A pilot study of a Hong Kong construction site practicing PBBS was conducted. The experiment results showed that PBBS performed well on construction accident prevention and the Safety Index (SI) of the two project teams, with increased improvements by 36.07% and 44.70% respectively. It is concluded that PBBS is effective and adaptable to construction industry.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A recurring feature of modern practice is occupational stress of project professionals, with both debilitating effects on the people concerned and indirectly affecting project success. Previous research outside the construction industry has involved the use of a psychology perceived stress questionnaire (PSQ) to measure occupational stress, resulting in the identification of one stressor – demand - and three sub-dimensional emotional reactions in terms of worry, tension and joy. The PSQ is translated into Chinese with a back translation technique and used in a survey of young construction cost professionals in China. Principal component analysis and confirmatory factor analysis are used to test the divisibility of occupational stress - little mentioned in previous research on stress in the construction context. In addition, structural equation modelling is used to assess nomological validity by testing the effects of the three dimensions on organizational commitment, the main finding of which is that lack of joy has the sole significant effect. The three-dimensional measurement framework facilitates the standardizing measurement of occupational stress. Further research will establish if the findings are also applicable in other settings and explore the relations between stress dimensions and other managerial concepts.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

To deliver tangible sustainability outcomes, the infrastructure sector of the construction industry needs to build capacities for the creation, application and management of ever increasing knowledge. This paper intends to establish the importance and key issues of promoting sustainability through knowledge management (KM). It presents a new conceptual framework for managing sustainability knowledge to raise the awareness and direct future research in the field of transport infrastructure, one of the fast growing sectors in Australia. A holistic KM approach is adopted in this research to consider the potential to “deliver the right information to the right person at the right time” in the context of sustainable development of infrastructure. A questionnaire survey among practitioners across the nation confirmed the necessity and identified priority issues of managing knowledge for sustainability. During infrastructure development, KM can help build much needed industry consensus, develop capacity, communicate decisions, and promote specific measures for the pursuit of sustainability. Six essential elements of the KM approach and their priority issues informed the establishment of a conceptual KM framework. The transport infrastructure sector has come to realise that development must not come at the expense of environmental and social objectives. In practice however, it is facing extensive challenges to deliver what has been promised in the sustainability agenda. This research demonstrates the importance of managing sustainability knowledge, integration of various stakeholders, facilitation of plans and actions and delivery of tangible benefits in real projects, as a positive step towards meeting these challenges.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Based on the construction industry of 27 province over the period of 1995-2008,this paper analyzes the evolution of regional structure of foreign engineering consultation industry.It is found that this industry translates weak overall strength,unbalanced regional structure to a more developed and balanced status,keeps pushing this change can improve the strength of our country’s engineering consultation industry,improve the international competition of construction.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry has long been considered to have unacceptably high injury and fatality rates. Previous research has shown that small construction companies sustain higher injury rates than large companies. However, despite the industry being dominated by a very large number of such small companies, little is known of their occupational health and safety (OHS) needs, practices and constraints. This paper takes a first step in aiming to identify the principal barriers that affect good OHS performance of small construction companies so that effective OHS practices can be developed to improve this in future. The contents of the literature are first summarised, in which three critical barriers to good OHS practice in small construction firms are proposed. They are : cost, time, lack of safety awareness and concern. The results of a questionnaire survey carried out with South East Queensland construction personnel are presented, which largely confirm what is suggested by the literature research and also succeed in providing an indication of their ranking in terms of importance and suggestions for overcoming these barriers. The research results provide a better understanding of the issues that restrict good OHS practice in small construction companies and potential measures for improvement.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry accounts for a significant portion of the material consumption of our industrialised societies. That material consumption comes at an environmental cost, and when buildings and infrastructure projects are demolished and discarded, after their useful lifespan, that environmental cost remains largely unrecovered. The expected operational lifespan of modern buildings has become disturbingly short as buildings are replaced for reasons of changing cultural expectations, style, serviceability, locational obsolescence and economic viability. The same buildings however are not always physically or structurally obsolete; the materials and components within them are very often still completely serviceable. While there is some activity in the area of recycling of selected construction materials, such as steel and concrete, this is almost always in the form of down cycling or reprocessing. Very little of this material and component resource is reuse in a way that more effectively captures its potential. One significant impediment to such reuse is that buildings are not designed in a way that facilitates easy recovery of materials and components; they are designed and built for speed of construction and quick economic returns, with little or no consideration of the longer term consequences of their physical matter. This research project explores the potential for the recovery of materials and components if buildings were designed for such future recovery; a strategy of design for disassembly. This is not a new design philosophy; design for disassembly is well understood in product design and industrial design. There are also some architectural examples of design for disassembly; however these are specialist examples and there is no significant attempt to implement the strategy in the main stream construction industry. This paper presents research into the analysis of the embodied energy in buildings, highlighting its significance in comparison with operational energy. Analysis at material, component, and whole-of-building levels shows the potential benefits of strategically designing buildings for future disassembly to recover this embodied energy. Careful consideration at the early design stage can result in the deconstruction of significant portions of buildings and the recovery of their potential through higher order reuse and upcycling.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Digital technology offers enormous benefits (economic, quality of design and efficiency in use) if adopted to implement integrated ways of representing the physical world in a digital form. When applied across the full extent of the built and natural world, it is referred to as the Digital Built Environment (DBE) and encompasses a wide range of approaches and technology initiatives, all aimed at the same end goal: the development of a virtual world that sufficiently mirrors the real world to form the basis for the smart cities of the present and future, enable efficient infrastructure design and programmed maintenance, and create a new foundation for economic growth and social well-being through evidence-based analysis. The creation of a National Data Policy for the DBE will facilitate the creation of additional high technology industries in Australia; provide Governments, industries and citizens with greater knowledge of the environments they occupy and plan; and offer citizen-driven innovations for the future. Australia has slipped behind other nations in the adoption and execution of Building Information Modelling (BIM) and the principal concern is that the gap is widening. Data driven innovation added $67 billion to the Australian economy in 20131. Strong open data policy equates to $16 billion in new value2. Australian Government initiatives such as the Digital Earth inspired “National Map” offer a platform and pathway to embrace the concept of a “BIM Globe”, while also leveraging unprecedented growth in open source / open data collaboration. Australia must address the challenges by learning from international experiences—most notably the UK and NZ—and mandate the use of BIM across Government, extending the Framework for Spatial Data Foundation to include the Built Environment as a theme and engaging collaboration through a “BIM globe” metaphor. This proposed DBE strategy will modernise the Australian urban planning and the construction industry. It will change the way we develop our cities by fundamentally altering the dynamics and behaviours of the supply chains and unlocking new and more efficient ways of collaborating at all stages of the project life-cycle. There are currently two major modelling approaches that contribute to the challenge of delivering the DBE. Though these collectively encompass many (often competing) approaches or proprietary software systems, all can be categorised as either: a spatial modelling approach, where the focus is generally on representing the elements that make up the world within their geographic context; and a construction modelling approach, where the focus is on models that support the life cycle management of the built environment. These two approaches have tended to evolve independently, addressing two broad industry sectors: the one concerned with understanding and managing global and regional aspects of the world that we inhabit, including disciplines concerned with climate, earth sciences, land ownership, urban and regional planning and infrastructure management; the other is concerned with planning, design, construction and operation of built facilities and includes architectural and engineering design, product manufacturing, construction, facility management and related disciplines (a process/technology commonly known as Building Information Modelling, BIM). The spatial industries have a strong voice in the development of public policy in Australia, while the construction sector, which in 2014 accounted for around 8.5% of Australia’s GDP3, has no single voice and because of its diversity, is struggling to adapt to and take advantage of the opportunity presented by these digital technologies. The experience in the UK over the past few years has demonstrated that government leadership is very effective in stimulating industry adoption of digital technologies by, on the one hand, mandating the use of BIM on public procurement projects while at the same time, providing comparatively modest funding to address the common issues that confront the industry in adopting that way of working across the supply chain. The reported result has been savings of £840m in construction costs in 2013/14 according to UK Cabinet Office figures4. There is worldwide recognition of the value of bringing these two modelling technologies together. Australia has the expertise to exercise leadership in this work, but it requires a commitment by government to recognise the importance of BIM as a companion methodology to the spatial technologies so that these two disciplinary domains can cooperate in the development of data policies and information exchange standards to smooth out common workflows. buildingSMART Australasia, SIBA and their academic partners have initiated this dialogue in Australia and wish to work collaboratively, with government support and leadership, to explore the opportunities open to us as we develop an Australasian Digital Built Environment. As part of that programme, we must develop and implement a strategy to accelerate the adoption of BIM processes across the Australian construction sector while at the same time, developing an integrated approach in concert with the spatial sector that will position Australia at the forefront of international best practice in this area. Australia and New Zealand cannot afford to be on the back foot as we face the challenges of rapid urbanisation and change in the global environment. Although we can identify some exemplary initiatives in this area, particularly in New Zealand in response to the need for more resilient urban development in the face of earthquake threats, there is still much that needs to be done. We are well situated in the Asian region to take a lead in this challenge, but we are at imminent risk of losing the initiative if we do not take action now. Strategic collaboration between Governments, Industry and Academia will create new jobs and wealth, with the potential, for example, to save around 20% on the delivery costs of new built assets, based on recent UK estimates.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Australian construction industry is often criticized for its comparatively low productivity. The most significant future productivity gains are predicted to arise from improvement in the firm’s project management. Information Communication Technologies (ICTs) are thought to offer such improvement. ICT adoption is particularly poor among Small and Medium Enterprises (SMEs). Existing studies provide only a general overview of adoption and diffusion of ICTs in SMEs, with no previous research measuring their readiness to adopt ICT. This paper outlines a theoretical approach to address this gap, exploring how to improve ICT adoption in Australian construction SMEs. A review of literature is undertaken to address the research question ‘What is the best conceptual approach to understanding ICT adoption in SMEs?’ The results emphasize the efficacy of a novel Technology Readiness and Acceptance Model (TRAM) to assess SMEs’ ICT implementation readiness. The proposed model consists of four major constructs to measure readiness comprising: - (1) optimism, - (2) innovativeness, - (3) discomfort and - (4) insecurity; two major constructs to measure technological acceptance comprising: - (1) perceived ease of use and - (2) perceived usefulness; and two extension variables comprising: - (1) self-efficacy and - (2) facilitating conditions. A limitation is that the performance of the conceptual model is yet to be tested empirically. Such research is planned in the coming year by the authors.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Cost estimating is a key task within Quantity Surveyors’ (QS) offices. Provision of an accurate estimate is vital to ensure that the objectives of the client are met by staying within the client’s budget. Building Information Modelling (BIM) is an evolving technology that has gained attention in the construction industries all over the world. Benefits from the use of BIM include cost and time savings if the processes used by the procurement team are adapted to maximise the benefits of BIM. BIM can be used by QSs to automate aspects of quantity take-off and the preparation of estimates, decreasing turnaround time and assist in controlling errors and inaccuracies. The Malaysian government has decided to require the use of BIM for its projects beginning from 2016. However, slow uptake is reported in the use of BIM both within companies and to support collaboration within the Malaysian industry. It has been recommended that QSs to start evaluating the impact of BIM on their practices. This paper reviews the perspectives of QSs in Malaysia towards the use of BIM to achieve more dependable results in their cost estimating practice. The objectives of this paper include identifying strategies in improving practice and potential adoption drivers that lead QSs to BIM usage in their construction projects. From the expert interviews, it was found out that, despite still using traditional methods and not practising BIM, the interviewees still acquire limited knowledge related to BIM. There are some drivers that potentially motivate them to employ BIM in their practices. These include client demands, innovation in traditional methods, speed in estimating costs, reduced time and costs, improvement in practices and self-awareness, efficiency in projects, and competition from other companies. The findings of this paper identify the potential drivers in encouraging Malaysian Quantity Surveyors to exploit BIM in their construction projects.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Workplace stress has been an increasing concern in the construction industry. Workers are working longer hours and construction managers’ responsibilities are becoming more complex and complicated due to reduced resources and widespread stakeholder involvements. These additional pressures potentially trigger workplace stress and impact on project performance. The purpose of this study is to examine and advance understanding of stress and its impact relationships that support holistic and strategic stress management. 17 key stress sources are identified with their impact relationships on different stress types examined. Based on the research findings, this paper concludes with a Stressor-Stress-Performance relationships map.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Global Financial Crisis (GFC) in 2008 had a significant impact on the world economy and the construction industry was no exception. This study investigates the major impacts of the 2008 GFC on the Australian construction industry and, in particular how the Australian construction contractors responded to the economic downturn. A total of 35 senior managers from the Top 100 Australian construction companies were interviewed. The findings indicate that construction companies, particularly the large ones were not affected in any significant way but are expecting some difficult financial times over the next few years and are taking actions to minimize the upcoming adverse impacts. The most common strategy adopted by Australian construction contractors is to concentrate on core business while avoiding aimless bidding. Similarly, great focus is placed on retaining human resources in order to maintain the skill set so that the company can respond quickly when market conditions improves. The research findings will provide construction contractors with insights on how to establish and sustain competitive advantages during economic slowdown and become more resilient in the future.