628 resultados para Comprehensive Assessment
Resumo:
In an effort to evaluate and improve their practices to ensure the future excellence of the Texas highway system, the Texas Department of Transportation (TxDOT) sought a forum in which experts from other state departments of transportation could share their expertise. Thus, the Peer State Review of TxDOT Maintenance Practices project was organized and conducted for TxDOT by the Center for Transportation Research (CTR) at The University of Texas at Austin. The goal of the project was to conduct a workshop at CTR and in the Austin District that would educate the visiting peers on TxDOT’s maintenance practices and invite their feedback. CTR and TxDOT arranged the participation of the following directors of maintenance: Steve Takigawa, CA; Roy Rissky, KS; Eric Pitts, GA; Jim Carney, MO; Jennifer Brandenburg, NC; and David Bierschbach, WA. One of the means used to capture the peer reviewers’ opinions was a carefully designed booklet of 15 questions. The peers provided TxDOT with written responses to these questions, and the oral comments made during the workshop were also captured. This information was then compiled and summarized in the following report. An examination of the peers’ comments suggests that TxDOT should use a more holistic, statewide approach to funding and planning rather than funding and planning for each district separately. Additionally, the peers stressed the importance of allocating funds based on the actual conditions of the roadways instead of on inventory. The visiting directors of maintenance also recommended continuing and proliferating programs that enhance communication, such as peer review workshops.
Resumo:
Purpose: The purpose of this paper is to identify changes in bank lending criteria due to the GFC and to explore the associated impacts on new housing supply in Queensland, Australia. Design/methodology/approach: This research involves a survey of each of Australia’s big four banks, as well as two prominent arrangers of development finance. Data on key lending criteria was collected: Pre GFC, during the GFC, and GFC recovery stage. Findings: The GFC has resulted in a retraction of funds available for residential development. The few institutions lending are filtering out only the best credit risks by way of constrictive loan covenants including: low loan to value ratios, high cash equity requirements, regional “no go” zones, and demonstrated borrower track record. The ability of developers to proceed with new housing developments is being constrained by their inability to obtain sufficient finance. Research limitations/implications: This research uses survey data, together with an understanding of the project finance process to extrapolate impacts on the residential development industry across Queensland. No regional or sub-market analysis is included. Future research will include subsequent surveys to track any loosening of credit policies over time and sub-market sector analysis. Practical implications: The inability to obtain project finance is identified as a key constraint to new housing supply. This research will inform policy makers and provide important quantitative evidence of the importance of availability of development finance in the housing supply chain. Social implications: Queensland is facing a supply shortfall, which if not corrected, may lead to upward pressure on house prices and falling housing affordability. Originality/value: There is very little academic research on development funding. This research is unique in linking bank lending criteria to new housing supply and demonstrating the impact on the development industry.
Resumo:
This paper describes the development and evaluation of a new instrument - the Clinician Suicide Risk Assessment Checklist (CSRAC). The instrument assesses the clinician's competency in three areas: clinical interviewing, assessment of specific suicide risk factors, and formulating a management plan. A draft checklist was constructed by integrating information from 1) literature review 2) expert clinician focus group and 3) consultation with experts. It was utilised in a simulated clinical scenario with clinician trainees and a trained actor in order to test for inter-rater agreement. Agreement was calculated and the checklist was re-drafted with the aim of maximising agreement. A second phase of simulated clinical scenarios was then conducted and inter-rater agreement was calculated for the revised checklist. In the first phase of the study, 18 of 35 items had inadequate inter-rater agreement (60%>), while in the second phase, using the revised version, only 3 of 39 items failed to achieve adequate inter-rater agreement. Further evidence of reliability and validity are required. Continued development of the CSRAC will be necessary before it can be utilised to assess the effectiveness of risk assessment training programs.
Resumo:
The relationship between radiologic union and clinical outcome in thoracoscopic scoliosis surgery is not clear, as apparent non-union of a spinal fusion does not always correspond to a poor clinical result. The aim of this study was to evaluate CT fusion rates 24 months after thoracoscopic anterior scoliosis surgery, and to explore the relationship between fusion scores and; (i) rod diameter, (ii) graft type, (iii) fusion level, (iv) occurrence of post-operative implant failure, and (v) lateral position of the fusion mass in the intervertebral disc space. We propose that moderate fusion scores on the Sucato scale secure successful clinical outcomes in thoracoscopic scoliosis surgery.
Resumo:
The relationship between radiologic union and clinical outcomes in thoracoscopic scoliosis surgery is not clear, as apparent non-union of a spinal fusion does not always correspond to a poor clinical result. The aim of this study was to evaluate for the first time the interbody fusion rates using low dose CT scans at minimum 24 months after thoracoscopic scoliosis surgery, and to explore the relationship between fusion scores and; (i) rod diameter, (ii) graft type, (iii) fusion level, (iv) implant failure, and (v) lateral position in the disc space. The study found that moderate fusion scores on the Sucato scale secure successful clinical outcomes in thoracoscopic scoliosis surgery.
Resumo:
Virtual methods to assess the fitting of a fracture fixation plate were proposed recently, however with limitations such as simplified fit criteria or manual data processing. This study aims to automate a fit analysis procedure using clinical-based criteria, and then to analyse the results further for borderline fit cases. Three dimensional (3D) models of 45 bones and of a precontoured distal tibial plate were utilized to assess the fitting of the plate automatically. A Matlab program was developed to automatically measure the shortest distance between the bone and the plate at three regions of interest and a plate-bone angle. The measured values including the fit assessment results were recorded in a spreadsheet as part of the batch-process routine. An automated fit analysis procedure will enable the processing of larger bone datasets in a significantly shorter time, which will provide more representative data of the target population for plate shape design and validation. As a result, better fitting plates can be manufactured and made available to surgeons, thereby reducing the risk and cost associated with complications or corrective procedures. This in turn, is expected to translate into improving patients' quality of life.
Resumo:
In Zheng v Cai (2009) 261 ALR 481 the High Court had to determine whether voluntary payments made to the appellant by a third party were to be taken into account when assessing a claim for damages for personal injury.
Resumo:
In Gagner Pty t/as Indochine Café v Canturi Corporation Pty Ltd (2009) 262 ALR 691, the assessment of damages awarded for the rectification work to the premises of the respondent was in issue. The appellant operated a restaurant above the respondent’s jewellery store in Sydney. When the kitchen of the restaurant flooded, water escaped causing damage to the jewellery store’s fit-out. The escape of the water was held to be due to the negligence of persons for whom the appellant was vicariously liable. The trial judge awarded damages, measured by the amount required to return the premises as close as was possible to the condition prior to the flood damage as well as an allowance for interruption to the business for 10 days. The 10 day allowance reflected the number of days the store would have been closed for if it was to be returned to its previous condition. The evidence was that the flooding has only affected approximately 10% of the floor area of the store. However, instead of having work carried out to bring the premises back to its condition as before the water damage, the respondent closed the business for 29 working days for a complete internal refurbishment – at a cost substantially more than simple rectification. On appeal it was argued that the trial judge had assessed the damages incorrectly as by undertaking a complete refurbishment had the effect that the respondent did not suffer any loss as a consequence of the negligence in relation to the fit-out. It was asserted that the claim for damages was in the circumstances a claim for betterment. It was also argued that the damages should not include a component for GST. Campbell JA gave reasons, with Macfarlan JA and Sackville AJA agreeing.
Resumo:
Quality, in construction projects should be regarded as the fulfillment of expectation of those contributors involved in such projects. Although a significant amount of quality practices have been introduced within the industry, attainment of reasonable levels of quality in construction projects continues to be an ongoing problem. To date, some research into the introduction and improvement of quality practices and stakeholder management has been undertaken, but so far no major studies have been completed that comprehensively examine how greater consideration of stakeholders’ perspectives of quality can be used to contribute to final project quality outcomes. This paper aims to examine the requirements for development of a framework leading to more effective involvement of stakeholders in quality planning and practices thus ultimately contributing to higher quality outcomes for construction projects. Through an extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines the viewpoints of major stakeholders on project quality. It proposes a set of criteria to be used as a basis for a quality practice improvement framework, which will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices leading to the achievement of improved quality outcomes on future projects.
Resumo:
The use of professional competency standards to assess postgraduate nursing student’s clinical performance has been in place since 2004, at the Queensland University of Technology, School of Nursing & Midwifery (SONAM) when the Graduate Certificate in Emergency Nursing degree commenced. Emergency nursing students were assessed in their workplace, using a Clinical Performance Appraisal Tool or CPAT which was based on the Australian College of Critical Care Nurses (ACCCN) Competency Standards. With the subsequent formation of a separate Emergency Nursing Course advisory group in 2007, there was a review of clinical assessment course component. The release of the 2008 CENA revised Practice Standards for the Emergency Nursing Specialist’s, led to the emergency nursing course advisory committee supporting the integration of the CENA practice standards for assessment of emergency nurses in preference to the less relevant ACCCN competency standards. The SONAM emergency nursing study area team commenced the phasing in and progression of the CENA practice standards across the two Graduate Certificate units, and Graduate Diploma and Master of Nursing (emergency) clinical major options in 2009. As some units undertaken in the degree are available to nurses in other disciplines a separate CPAT was devised for the clinical assessments according to speciality context. The team has had to carefully consider how the professional standards are integrated into the teaching and assessment of the unit and not just applied instead of the ACCCN competency standards. Professional standards for the emergency context has also helped tailor course content and learning outcomes to be relevant across a number of emergency nursing contexts in Australia. The assessment of the CPAT is undertaken at the workplace by QUT appointed clinical lecturers. Clinical lecturers need to apply and have suitable postgraduate qualification to undertake the position. The clinical lecturer support role is well established at QUT. The integration of the new CENA practice standards has necessitated a review of the postgraduate assessment of emergency nurses. A clinical lecturer workshop has been organised to review role, scope and how to utilise the new look CENA based CPAT, clinical assessment format.
Resumo:
Student assessment is particularly important, and particularly controversial, because it is the means by which student achievement is determined. Reasonable adjustment to student assessment is of equal importance as the means of ensuring the mitigation, or even elimination, of disability related barriers to the demonstration of student achievement. The significance of reasonable adjustment is obvious in the later years of secondary school, and in the tertiary sector, because failure to adjust assessment may be asserted as the reason a student did not achieve as well as anticipated or as the reason a student was excluded from a course and, as a result, from future study and employment opportunities. Even in the early years of schooling, however, assessment and its management are a critical issue for staff and students, especially in an education system like Australia’s with an ever increasing emphasis on national benchmarks testing. This paper will explain the legislation which underpins the right to reasonable adjustment in education in Australian schools. It will give examples of the kinds of adjustment which may be made to promote equality of opportunity in the area of assessment. It will also consider some of the controversies which have confronted, or which, it may be speculated, are likely to confront Australian education institutions as they work towards compliance with reasonable adjustment laws.
Resumo:
Vehicle emitted particles are of significant concern based on their potential to influence local air quality and human health. Transport microenvironments usually contain higher vehicle emission concentrations compared to other environments, and people spend a substantial amount of time in these microenvironments when commuting. Currently there is limited scientific knowledge on particle concentration, passenger exposure and the distribution of vehicle emissions in transport microenvironments, partially due to the fact that the instrumentation required to conduct such measurements is not available in many research centres. Information on passenger waiting time and location in such microenvironments has also not been investigated, which makes it difficult to evaluate a passenger’s spatial-temporal exposure to vehicle emissions. Furthermore, current emission models are incapable of rapidly predicting emission distribution, given the complexity of variations in emission rates that result from changes in driving conditions, as well as the time spent in driving condition within the transport microenvironment. In order to address these scientific gaps in knowledge, this work conducted, for the first time, a comprehensive statistical analysis of experimental data, along with multi-parameter assessment, exposure evaluation and comparison, and emission model development and application, in relation to traffic interrupted transport microenvironments. The work aimed to quantify and characterise particle emissions and human exposure in the transport microenvironments, with bus stations and a pedestrian crossing identified as suitable research locations representing a typical transport microenvironment. Firstly, two bus stations in Brisbane, Australia, with different designs, were selected to conduct measurements of particle number size distributions, particle number and PM2.5 concentrations during two different seasons. Simultaneous traffic and meteorological parameters were also monitored, aiming to quantify particle characteristics and investigate the impact of bus flow rate, station design and meteorological conditions on particle characteristics at stations. The results showed higher concentrations of PN20-30 at the station situated in an open area (open station), which is likely to be attributed to the lower average daily temperature compared to the station with a canyon structure (canyon station). During precipitation events, it was found that particle number concentration in the size range 25-250 nm decreased greatly, and that the average daily reduction in PM2.5 concentration on rainy days compared to fine days was 44.2 % and 22.6 % at the open and canyon station, respectively. The effect of ambient wind speeds on particle number concentrations was also examined, and no relationship was found between particle number concentration and wind speed for the entire measurement period. In addition, 33 pairs of average half-hourly PN7-3000 concentrations were calculated and identified at the two stations, during the same time of a day, and with the same ambient wind speeds and precipitation conditions. The results of a paired t-test showed that the average half-hourly PN7-3000 concentrations at the two stations were not significantly different at the 5% confidence level (t = 0.06, p = 0.96), which indicates that the different station designs were not a crucial factor for influencing PN7-3000 concentrations. A further assessment of passenger exposure to bus emissions on a platform was evaluated at another bus station in Brisbane, Australia. The sampling was conducted over seven weekdays to investigate spatial-temporal variations in size-fractionated particle number and PM2.5 concentrations, as well as human exposure on the platform. For the whole day, the average PN13-800 concentration was 1.3 x 104 and 1.0 x 104 particle/cm3 at the centre and end of the platform, respectively, of which PN50-100 accounted for the largest proportion to the total count. Furthermore, the contribution of exposure at the bus station to the overall daily exposure was assessed using two assumed scenarios of a school student and an office worker. It was found that, although the daily time fraction (the percentage of time spend at a location in a whole day) at the station was only 0.8 %, the daily exposure fractions (the percentage of exposures at a location accounting for the daily exposure) at the station were 2.7% and 2.8 % for exposure to PN13-800 and 2.7% and 3.5% for exposure to PM2.5 for the school student and the office worker, respectively. A new parameter, “exposure intensity” (the ratio of daily exposure fraction and the daily time fraction) was also defined and calculated at the station, with values of 3.3 and 3.4 for exposure to PN13-880, and 3.3 and 4.2 for exposure to PM2.5, for the school student and the office worker, respectively. In order to quantify the enhanced emissions at critical locations and define the emission distribution in further dispersion models for traffic interrupted transport microenvironments, a composite line source emission (CLSE) model was developed to specifically quantify exposure levels and describe the spatial variability of vehicle emissions in traffic interrupted microenvironments. This model took into account the complexity of vehicle movements in the queue, as well as different emission rates relevant to various driving conditions (cruise, decelerate, idle and accelerate), and it utilised multi-representative segments to capture the accurate emission distribution for real vehicle flow. This model does not only helped to quantify the enhanced emissions at critical locations, but it also helped to define the emission source distribution of the disrupted steady flow for further dispersion modelling. The model then was applied to estimate particle number emissions at a bidirectional bus station used by diesel and compressed natural gas fuelled buses. It was found that the acceleration distance was of critical importance when estimating particle number emission, since the highest emissions occurred in sections where most of the buses were accelerating and no significant increases were observed at locations where they idled. It was also shown that emissions at the front end of the platform were 43 times greater than at the rear of the platform. The CLSE model was also applied at a signalled pedestrian crossing, in order to assess increased particle number emissions from motor vehicles when forced to stop and accelerate from rest. The CLSE model was used to calculate the total emissions produced by a specific number and mix of light petrol cars and diesel passenger buses including 1 car travelling in 1 direction (/1 direction), 14 cars / 1 direction, 1 bus / 1 direction, 28 cars / 2 directions, 24 cars and 2 buses / 2 directions, and 20 cars and 4 buses / 2 directions. It was found that the total emissions produced during stopping on a red signal were significantly higher than when the traffic moved at a steady speed. Overall, total emissions due to the interruption of the traffic increased by a factor of 13, 11, 45, 11, 41, and 43 for the above 6 cases, respectively. In summary, this PhD thesis presents the results of a comprehensive study on particle number and mass concentration, together with particle size distribution, in a bus station transport microenvironment, influenced by bus flow rates, meteorological conditions and station design. Passenger spatial-temporal exposure to bus emitted particles was also assessed according to waiting time and location along the platform, as well as the contribution of exposure at the bus station to overall daily exposure. Due to the complexity of the interrupted traffic flow within the transport microenvironments, a unique CLSE model was also developed, which is capable of quantifying emission levels at critical locations within the transport microenvironment, for the purpose of evaluating passenger exposure and conducting simulations of vehicle emission dispersion. The application of the CLSE model at a pedestrian crossing also proved its applicability and simplicity for use in a real-world transport microenvironment.
Resumo:
Postoperative fever in arthroplasty patients is common. The value of diagnostic workup of fever in this instance is of questionable utility. Studies have shown that blood cultures in this scenario add little to clinical management, but sample sizes have been small and the use of blood cultures in this setting continues. This study aimed to examine the value of blood cultures in the assessment of postoperative fever in a large arthroplasty population. The medical records of 101 patients who had 141 blood culture sets taken during a 2-year period were retrospectively analyzed. Of the 141 blood culture sets, only 2 returned positive results. These were both thought to be as a result of skin contamination at the time of venipuncture. No infectious sequelae occurred in either patient. We conclude that blood cultures have no role to play in the assessment of the febrile, otherwise asymptomatic arthroplasty patient in the early postoperative period.
Resumo:
Preterm infants commence breastfeeding when health-care professionals deem them to be ready. However, the optimal timing for commencement of breastfeeding is unclear. Currently, there is little guidance for neonatal care providers to decide when to initiate breastfeeding among preterm infants. A mixed-methods study was conducted to develop and test the Preterm Sucking Readiness (PTSR) scale in four phases. The first phase involved a chart audit to explore the use of age as a criterion by investigating when preterm infants meet feeding milestones as well as other factors that may affect an infant’s readiness to engage in nutritive sucking behaviour. The second phase utilised focus groups to explore and define how neonatal care providers decide when to commence breastfeeding. To gain consensus on the criteria mentioned by the focus groups, a Delphi survey was conducted in phase 3, involving neonatal providers across Australia and New Zealand. Phase 4 of the study involved an observational study that was used to test the six-item PTSR. The age at which specific feeding milestones were reached was consistent with what has been previously described in the literature. The chart audit showed that the time taken to the first feeding attempt in the preterm infant population was affected by gestational age at birth, birth weight, and specific interventions. Staff also considered age along with other criteria when deciding when to initiate feeding. Consensus on nine criteria for inclusion into the six-item PTSR was achieved using the Delphi technique. Three items of PTSR showed significant differences between the preterm and fullterm infant groups. Only two items, feeding-readiness behaviour and low pulse oximetry during handling, explained the variance in breastfeeding behaviour. The inter-rater variability ranged between moderate and very good for the PTSR items. The results of this study indicate the importance of assessing behavioural cues as an indication of breastfeeding readiness in the preterm infant population, once an infant is deemed physiologically stable. Age continues to be a factor in some clinicians' decisions to commence breastfeeding. However, age alone cannot be used to decide if an infant is ready to engage in breastfeeding. Further research is needed to confirm these findings.