668 resultados para Industry engineering


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cultural policy studies have previously highlighted the importance of multiple logics, friction and contradiction in cultural policy. Recent developments in institutional theory provide a framework for analysing change in cultural policy which explores movement between these multiple and sometimes contradictory logics. This paper analyses the role of friction in the evolution of Australian film industry policy and in particular the tension between competing logics regarding nationalism, commercialism and the state. The paper is suggestive of the relevance of institutional theory as a framework for understanding cultural policy evolution.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an IT enabled technology that allows storage, management, sharing, access, update and use of all the data relevant to a project through out the project life-cycle in the form of a data repository. BIM enables improved inter-disciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. While the technology itself may not be new, and similar approaches have been in use in some other sectors like Aircraft and Automobile industry for well over a decade now, the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry is still to catch up with them in its ability to exploit the benefits of the IT revolution. Though the potential benefits of the technology in terms of knowledge sharing, project management, project co-ordination and collaboration are near to obvious, the adoption rate has been rather lethargic, inspite of some well directed efforts and availability of supporting commercial tools. Since the technology itself has been well tested over the years in some other domains the plausible causes must be rooted well beyond the explanation of the ‘Bell Curve of innovation adoption’. This paper discusses the preliminary findings of an ongoing research project funded by the Cooperative Research Centre for Construction Innovation (CRC-CI) which aims to identify these gaps and come up with specifications and guidelines to enable greater adoption of the BIM approach in practice. A detailed literature review is conducted that looks at some of the similar research reported in the recent years. A desktop audit of some of the existing commercial tools that support BIM application has been conducted to identify the technological issues and concerns, and a workshop was organized with industry partners and various players in the AEC industry for needs analysis, expectations and feedback on the possible deterrents and inhibitions surrounding the BIM adoption.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

BIM (Building Information Modelling) is an approach that involves applying and maintaining an integral digital representation of all building information for different phases of the project lifecycle. This paper presents an analysis of the current state of BIM in the industry and a re-assessment of its role and potential contribution in the near future, given the apparent slow rate of adoption by the industry. The paper analyses the readiness of the building industry with respect to the product, processes and people to present an argument on where the expectations from BIM and its adoption may have been misplaced. This paper reports on the findings from: (1) a critical review of latest BIM literature and commercial applications, and (2) workshops with focus groups on changing work-practice, role of technology, current perceptions and expectations of BIM.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Effective knowledge transfer can prevent the reinvention of systems and ideas as well as the repetition of errors. Doing so will save substantial time, as well as contribute to better performance of projects and project-based organisations (PBOs). Despite the importance of knowledge, PBOs face serious barriers to the effective transfer of knowledge, while their characteristics, such as unique and innovative approaches taken during every project, mean they have much to gain from knowledge transfer. As each new project starts, there is the strong potential to reinvent the process, rather than utilise learning from previous projects. In fact, rework is one of the primary factors contributing to construction industry's poor performance and productivity. Current literature has identified several barriers to knowledge transfer in organisational settings in general, and not specifically PBOs. However, PBOs significantly differ from other types of organisations. PBOs operate mainly on temporary projects, where time is a crucial factor and people are more mobile than in other organisational settings. The aim of this research is to identify the key barriers that prevent effective knowledge transfer for PBOs, exclusively. Interviews with project managers and senior managers of PBOs complement the analysis of the literature and provide professional expertise. This research is crucial to gaining a better understanding of obstacles that hinder knowledge transfer in projects. The main contribution of this research is exclusive for PBO, list of key barriers that organisation and project managers need to consider to ensure effective knowledge transfer and better project management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A major project in the Sustainable Built Assets core area is the Sustainable Sub-divisions – Ventilation Project that is the second stage of a planned series of research projects focusing on sustainable sub-divisions. The initial project, Sustainable Sub-divisions: Energy focused on energy efficiency and examined the link between dwelling energy efficiency and sub-divisional layout. In addition, the potential for on site electricity generation, especially in medium and high-density developments, was also examined. That project recommended that an existing lot-rating methodology be adapted for use in SEQ through the inclusion of sub divisional appropriate ventilation data. Acquiring that data is the object of this project. The Sustainable Sub-divisions; Ventilation Project will produce a series of reports. The first report (Report 2002-077-B-01) summarised the results from an industry workshop and interviews that were conducted to ascertain the current attitudes and methodologies used in contemporary sub-division design in South East Queensland. The second report (Report 2002-077-B-02) described how the project is being delivered as outlined in the Project Agreement. It included the selection of the case study dwellings and monitoring equipment and data management process. This third report (Report 2002-077-B-03) provides an analysis and review of the approaches recommended by leading experts, government bodies and professional organizations throughout Australia that aim to increase the potential for passive cooling and heating at the subdivision stage. This data will inform issues discussed on the development of the enhanced lot-rating methodology in other reports of this series. The final report, due in June 2007, will detail the analysis of data for winter 2006 and summer 2007, leading to the development and delivery of the enhanced lot-rating methodology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The evolution of property education to adapt to the changing business environment requires changes to course content, method of delivery and assessment. Many universities have a special interest in understanding how the students transition in and transition out of the property programs. The impact of the first year student experience is often easier to assess through students’ progression in the course and performance in their intermediate and advanced units. However, the students’ success in transitioning from university student to property professional is often more difficult to determine. In an environment where many property students commence their professional careers while still completing their undergraduate property qualification, a survey of current final year students was undertaken to identify the students’ perception of their level of preparedness for entry into the professional world. This study has also been informed by feedback received from and informal discussions held with industry representative bodies, alumni and senior members of professional organisations. The QUT UD40 Bachelor of Urban Development, Property Economics course has been designed to achieve graduate capabilities in core technical skills and generic professional skills which are required by property professionals. The results of this study were that some units in the program were perceived to provide direct preparation for students commencing their professional careers whilst the impact of other units was less tangible. Valuable feedback received during the study included an assessment of the relevance of many multi-disciplinary units, the appropriateness of the programming of units within the course and the appropriateness of repetition of content during the course. The further research question arises as to how universities can better assist students in the transition to the professional environment when frequently this occurs prior to completion of the property course.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many nations are experiencing a decline in the number of graduating engineers, an overall poor preparedness for engineering studies in tertiary institutions, and a lack of diversity in the field. Given the increasing importance of mathematics, science, engineering, and technology in our world, it is imperative that we foster an interest and drive to participate in engineering from an early age. This discuission paper argues for the intergration of engineering education within the elementary and middle school mathematics curricula. In doing so, we offer a definition of engineering education and address its core goals; consider some perceptions of engineering and engineering education held by teachers and students; and offer one approach to promoting engineering education within the elementary and middle school mathematics curriculum, namely through mathematical modeling.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper argues for a future-oriented, inclusion of Engineering Model Eliciting Activities (EngMEAs) in elementary mathematics curricula. In EngMEAs students work with meaningful engineering problems that capitalise on and extend their existing mathematics and science learning, to develop, revise and document powerful models, while working in groups. The models developed by six groups of 12-year students in solving the Natural Gas activity are presented. Results showed that student models adequately solved the problem, although student models did not take into account all the data provided. Student solutions varied to the extent students employed the engineering context in their models and to their understanding of the mathematical concepts involved in the problem. Finally, recommendations for implementing EngMEAs and for further research are discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Engineering education for elementary school students is a new and increasingly important domain of research by mathematics, science, technology, and engineering educators. Recent research has raised questions about the context of engineering problems that are meaningful, engaging, and inspiring for young students. In the present study an environmental engineering activity was implemented in two classes of 11-year-old students in Cyprus. The problem required students to use the data to develop a procedure for selecting among alternative countries from which to buy water. Students created a range of models that adequately solved the problem although not all models took into account all of the data provided. The models varied in the number of problem factors taken into consideration and also in the different approaches adopted in dealing with the problem factors. At least two groups of students integrated into their models the environmental aspect of the problem (energy consumption, water pollution) and further refined their models. Results provide evidence that engineering model-eliciting activities can be successfully integrated in the elementary mathematics curriculum. These activities provide rich opportunities for students to deal with engineering contexts and to apply their learning in mathematics and science to solving real-world engineering problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the last few years more stringent environmental laws (e.g. the German “Energie¬ein-sparverordnung ENEV” - Energy Performance of Buildings Directive) and soaring energy prices has increased the need for the real estate industry to react and participate in overall energy reduction through efficient house construction and design, as well as upgrading the existing housing stock to be more energy efficient. Therefore the Property Economics Group at Queensland University of Technology in Australia and Nuertingen-Geislingen University in Germany are carrying out research in relation to sustainable housing construction and public awareness of “green” residential property. Part of this research is to gain an understanding of the level of knowledge and importance of these issues to the house buyer and to determine the importance of sustainable housing to the general public. The paper compares data from two different empirical studies; one of studies analyzes the situation in New Zealand, the other is focused on Germany.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agricultural production is one of the major industries in New Zealand and accounts for over 60% of all export trade. The farming industry comprises 70,000 entities ranging in size from small individual run farms to large corporate operations. The reliance of the New Zealand economy to the international rural sector has seen considerable volatility in the rural land markets over the past four decades, with significant shifts in rural land prices based on location, land use and underlying international rural commodity prices. With the increasing attention being paid to the rural sector, especially in relation to food production and bio-fuels, there has been an increasing corporate interest in rural land ownership in relatively low subsidised agricultural producing countries such as New Zealand and Australia. A factor that has limited this participation of institutional investors previously has been a lack of reliable and up-to-date investment performance data for this asset class. This paper is the initial starting phase in the development of a New Zealand South Island rural land investment performance index and covers the period 1990-2007. The research in this paper analyses all rural sales transactions in the South Island and develops a capital return index for rural property based on major rural property land use. Additional work on this index will cover both total return performance and geographic location.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

President’s Report Hello fellow AITPM members, A few weeks ago we saw another example of all levels of Government pulling together in real time to try to deal with a major transport incident, this time it was container loads of ammonium nitrate falling off the Pacific Adventurer during Cyclone Hamish and the associated major oil spill due to piercing of its hull off Moreton Bay in southern Queensland. The oil spill was extensive, affecting beaches and estuaries from Moreton Island north to the Sunshine Coast; a coastal stretch of at least 60km. We saw the Queensland Government, Brisbane, Moreton Bay and Sunshine Coast Regional Council crews deployed quickly once the gravity of the situation was realised to clean up toxic oil on beaches and prevent extensive upstream contamination. Environmental agencies public and private were quick to respond to help affected wildlife. The Navy’s HMAS Yarra and another minesweeper were deployed to search for the containers in the coastal area in an effort to have them salvaged before all ammonium nitrate could leach into and harm marine habitat, which would have a substantial impact not only on that environment but also the fishing industry. all of this during the final fortnight before a State election.) While this could be branded as a maritime problem, the road transport and logistics system was crucial to the cleanup. The private vehicular ferries were enlisted to transport plant and equipment from Brisbane to Moreton Island. The plant themselves, such as graders, were drawn from road building and maintenance inventory. Hundreds of Councils’ staff were released from other activities to undertake the cleanup. While it will take some time for us to know the long term impacts of this incident, it seems difficult to fault “grassroots” government crews and their private counterparts, such as Island tourism staff, in the initial cleanup effort. From a traffic planning and management perspective, we should also remember that this sort of incident has happened on road and rail corridors in the past, albeit on lesser scales. It underlines that we do need to continue to protect communities, commercial interests, and the environment through rigorous heavy vehicle management, planning and management of dangerous goods routesincluding rail corridors through urban areas), and carefully considered incident and disaster recovery plans and protocols. I’d like to close in reminding everyone again that AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, is being held in Adelaide from 5 to 7 August. SA Branch President Paul Morris informs me that we have had over 50 paper submissions to date, from which a very balanced and informative programme of sessions has been prepared. www.aitpm.com has all of the details about how to register, sponsor a booth, session, etc. Best regards all, Jon Bunker

Relevância:

20.00% 20.00%

Publicador:

Resumo:

President’s Message Hello fellow AITPM members, We’ve been offered a lot of press lately about the Federal Government’s plan for the multibillion dollar rollout of its high speed broadband network, which at the moment is being rated to a speed of 100Mb/s. This seems fantastic in comparison to the not atypical 250 to 500kb/s that I receive on my metropolitan cable broadband, which incidentally my service provider rates at theoretical speeds of up to 8 Mb/s. I have no doubt that such a scheme will generate significant advantages to business and consumers. However, I also have some reservations. Only a few of years ago I marvelled at my first 256Mb USB stick, which cost my employer about $90. Last month I purchased a 16Gb stick with a free computer carry bag for $80, which on the back of my envelope has given me about 72 times the value of my first USB stick not including the carry bag! I am pretty sure the technology industry will find a way to eventually push a lot more than 100Mb/s down the optic fibre network just as they have done with pushing several Mb/s ADSL2 down antique copper wire. This makes me wonder about the general problem of inbuilt obsolescence of all things high-tech due to rapid advances in the tech industry. As a transport professional I then think to myself that our industry has been moving forward at somewhat of a slower pace. We certainly have had major milestones having significant impacts, such as the move from horse and cart to the self propelled motor vehicle, sealing and formal geometric design of roads, development of motorways, signalisation of intersections, coordination of networks, to simulation modelling for real time adaptive control (perhaps major change has been at a frequency of 30 years or so?). But now with ITS truly penetrating the transport market, largely thanks to the in-car GPS navigator, smart phone, e-toll and e-ticket, I believe that to avoid our own obsolescence we’re going to need to “plan for ITS” rather than just what we seem to have been doing up until now, that is, to get it out there. And we’ll likely need to do it at a faster pace. It will involve understanding how to data mine enormous data sets, better understanding the human/machine interface, keeping pace with automotive technology more closely, resolving the ethical and privacy chestnuts, and in the main actually planning for ITS to make peoples’ lives easier rather than harder. And in amongst this we’ll need to keep pace with the types of technology advances similar to my USB stick example above. All the while we’ll be making a brand new set of friends in the disciplines that will morph into ITS along with us. Hopefully these will all be “good” problems for our profession to have. I should close in reminding everyone again that AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, is being held in Adelaide from 5 to 7 August. www.aitpm.com has all of the details about how to register, sponsor a booth, session, etc. Best regards all, Jon Bunker

Relevância:

20.00% 20.00%

Publicador:

Resumo:

President’s Message Hello fellow AITPM members, Due to three colliding forces of nature I find myself writing this month’s message from home – today, I am still getting over a persistent virus that seemed to set in just after returning from Singapore a couple of weeks ago, which my diabetes won’t let me get away with too easily (no Kermit the Frog swine flu jokes please). Combine this with a very wet day in Brisbane – in fact the wettest for 20 years (how can we complain, except for flash flooding?). And in Queensland today is a state school teachers’ strike, so one half of our brood is over watching TV. Family snapshots aside, the biggest news for our industry of late is the $8.5 billion announced in the Federal Budget for transport infrastructure projects; many “shovel ready”, but some – and fortunate for our profession – desktop ready. This newsletter provides nationwide coverage on the transport infrastructure aspects of the Federal Budget. We’ll need a bit more time to carefully look at the ensuing State Budgets’ announcements. Regarding the federal budget announcements, I am pleased to see serious attention being paid to upgrading the M1 system – I hope to see a motorway standard facility connecting Adelaide to at least Rockhampton in my lifetime. But some other important roads are of course missing out in this particular budget. Various levels of commitment are being made to urban passenger rail – some project significant while others planning significant. Enhancement of suburban rail is important across the capitals and Australia’s medium sized cities such as the Gold Coast and Newcastle. Not much on road safety initiatives jumped out at me, but I believe it is implied in the large road projects and in some of the detail elsewhere. I do believe it’s about time a ‘Vision Zero’ style policy is adopted at the National level, since any death is unacceptable on the road, just as it is in any other workplace. So, overall some good news on building transport infrastructure to keep the economy purring during this recession, and strongly supporting it during future boom times. The other edge to the sword, of course, is that we tax payers will be paying a considerable amount for borrowings for these projects over a long period of time. I close again in reminding everyone again that AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, is being held in Adelaide from 5 to 7 August. www.aitpm.com has all of the details about how to register, sponsor a booth, session, etc. Best regards all, Jon Bunker