446 resultados para Construction industry - Evaluation - Australia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite the increasing significance of the construction industry as an emerging sector of the Australian economy, there is inadequate research performed on construction design firms in terms of theoretical and empirical foundations. Although past research has identified the barriers and success factors for firm market entry, evidence suggests that to date no research has explicitly explored the sustainability of construction design firms in international markets. SMEs and their approach to firm internationalisation differ significantly from large manufacturing firms and a vast majority of construction design firms operate as SMEs. This paper develops a sustainable business model for construction design SMEs, which rely upon the development of clear Client Following (CF) versus Market Seeking (MS) strategies to support internal firm strategic and operational management. The understanding of these strategies is vital as the application of either will shape the design management approach of firms, which would in turn impact on the sustainability of these firms in foreign markets. Long-term sustainability of firms in international markets relies heavily upon client satisfaction. Client and project team participants’ communication during various design processes has often been problematic and the added difficulty of communicating across international boundaries further compounds the problem of capturing and maintaining client’s requirements. Therefore this paper develops a model for economic sustainability of Australian construction design firms working in international markets by exploring factors that affect client satisfaction across international boundaries, through the development of business performance indicators. These include not only the critical financial capital but also other ‘softer’ indicators, namely: social, cultural and intellectual capital. These act as a firm’s measure of success and the acquisition of this type of capital will provide significant advantages to firms’ success, hence sustainability in international markets.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The early stages of the building design process are when the most far reaching decisions are made regarding the configuration of the proposed project. This paper examines methods of providing decision support to building designers across multiple disciplines during the early stage of design. The level of detail supported is at the massing study stage where the basic envelope of the project is being defined. The block outlines on the building envelope are sliced into floors. Within a floor the only spatial divisions supported are the “user” space and the building core. The building core includes vertical transportation systems, emergency egress and vertical duct runs. The current focus of the project described in the paper is multi-storey mixed use office/residential buildings with car parking. This is a common type of building in redevelopment projects within and adjacent to the central business districts of major Australian cities. The key design parameters for system selection across the major systems in multi-storey building projects - architectural, structural, HVAC, vertical transportation, electrical distribution, fire protection, hydraulics and cost – are examined. These have been identified through literature research and discussions with building designers from various disciplines. This information is being encoded in decision support tools. The decision support tools communicate through a shared database to ensure that the relevant information is shared across all of the disciplines. An internal data model has been developed to support the very early design phase and the high level system descriptions required. A mapping to IFC 2x2 has also been defined to ensure that this early information is available at later stages of the design process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project Diagnostics is a tool for construction industry stakeholders wishing to improve project delivery and outcomes. This software identifies areas of poor project health, then establishes probable root causes and provides suggested remedial measures. Its focus is to act as an advanced warning system for construction projects that are failing to meet predetermined objectives based on the critical success factors (CSFs) of cost, time, quality, safety, relationships, environment and stakeholder value.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines knowledge management and innovation in the Australian Construction Industry. A conceptual model is presented, based upon analysis of the literature and a series of preliminary construction industry interviews. Extensive knowledge management (KM) research has focused upon types of knowledge contained within specific organizational settings. However, we argue that a crucial missing link in KM research concerns the interface between flows of knowledge from external sources of innovations and its channelization in and out, and between organizations. This interface, regulating and facilitating knowledge from external sources of innovation into the organisation, operates under the influence of two main forces visualized as “pulling” and “pushing” forces in the model presented in this paper. The premise of the model lies in a hypothesis that as an organization changes itself into a more mature, learning organization (LO) over time, knowledge flows into it through “pull” rather than “push” forces. We conclude that a successful knowledge management initiative installs a learning and knowledge sharing culture, which is easily adaptable to new learning offering little resistance to new knowledge that flows into the organisation. The model bridges the gap between research and its application in construction practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is a key national economic component. It tends to be at the forefront of cyclic changes in the Australian economy. It has a significant impact, both directly and indirectly, on the efficiency and productivity of other industries. Moreover it affects everyone to a greater or lesser extent; through its products whether they are manifested in the physical infrastructure that supports the operation of the economy or through the built environment that directly impacts on the quality of life experienced by individuals. In financial terms the industry makes one of the largest contributions to the Australian economy, accounting for 4.7 per cent of GDP 1 which was worth over $30B in 20012. The construction industry is comprised of a myriad of small firms, across several important sectors including, o Residential building, o Commercial building, o Building services, o Engineering, o Infrastructure o Facilities Management o Property Development Each sector is typified by firms that have distinctive characteristics such as the number of employees, size and value of contracts, number of jobs, and so forth. It tends to be the case that firms operating in commercial building are larger than those involved in residential construction. The largest contractors are found in engineering and infrastructure, as well as in the commercial building sub-sectors. However all sectors are characterised by their reliance upon sub-contractors to carry out on-site operations. Professionals from the various design consultant groups operate across all of these sectors. This description masks one of the most significant underlying causes of inefficiency in the construction industry, namely its fragmentation. The Construction Industry chapter of the 2004 Australian Year Book3, published by the Australian Bureau of Statistics unmasks the industry’s fragmented structure, typified by the large number of operating businesses within it, the vast majority of which are small companies employing less than 5 people. It identifies over 190,000 firms, of which over 90 percent employ less than 5 people. At the other end of the spectrum, firms employing 20 or more people account for fractionally more than one percent of businesses in the industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As with any strategic planning process, evidence-based estimates are needed to plan effectively for the future. Comments below are based upon data drawn from the Brisbane Long Term Infrastructure Plan (Department of Local Government, Planning, Sport and Recreation, 2005) and the Brisbane Long Term Planning Economic Indicators (National Institute of Economic and Industry Research, 2005), as these are cited as the underpinning research for the economic plan. This submission focuses on one critical aspect of the strategic plan — the relationship between population growth, employment growth, and infrastructure provision. While the focus of the strategic plan is on the changes which would occur within Brisbane, it is important that consideration of predicted changes in surrounding local government areas be also carried out.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

After many years of development BIM (Building Information Modelling) is starting to achieve significant penetration into the building sector of the construction industry. This paper describes the current status of BIM and the drivers that are motivating the change from 2D CAD to BIM within the building sector. The paper then discusses what the implications of the technology underlying BIM may be for the civil construction sector of the construction industry. A project carried out by the Cooperative Research Centre for Construction Innovation is used as an example of this technology as well as several international examples.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Safety Effectiveness Indicators (SEI) Project has used extensive research to determine what safety effectiveness measures can be developed by industry, for industry use to improve its safety performance. These indicators can measure how effectively the 13 safety management tasks1 (SMTs) selected for this workbook are undertaken. Currently, positive performance indicators (PPIs) are only able to measure the number of activities undertaken. They do not provide information on whether each activity is being undertaken effectively, and therefore do not provide data which can be used by industry to target areas of focus and improvement. The initial workbook contained six SMTs, and was piloted on various construction sites during August 2008. The workbook was refined through feedback from the pilot, and 13 SMTs were used in a field trial during the months of October, November and December 2008. The project team also carried out 12 focus groups in Brisbane, Canberra, Sydney and Melbourne during April, May and June 2008, and developed an initial format of this workbook through these groups and team workshops. Simplification of the language was a recurring theme, and we have attempted to do this throughout the project. The challenge has been to ensure we keep the descriptions short, to the point and relevant to all companies, without making them too specific. The majority of the construction industry participants also requested an alteration to the scale used, so a ‘Yes’/‘No’/’Not applicable’ format is used in this workbook. This workbook, based on industry feedback, is for use on site by various construction companies and contains 13 SMTs. However, you are invited to personalise the SEI tools to better suit your individual company and workplaces.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cohen (1977) reviewed the then current research on occupational safety and stated that both strong company commitment to safety, and communication between all levels of a company are the most influential factors to improving safety. Other relevant factors included careful selection of staff, and early and continuous training throughout the lifetime with the company. These continue to be important factors in OHS today. There has been a continued decrease in the injury rates since Cohen’s review within the Australian construction industry, however, the construction industry has far more injuries and ill-health than the Australian average, with one fatality occurring on average per week in the Australian Construction Industry. The Fatality rate in the building and construction industry remains three times higher than the national average, and 15% of all industry fatalities are in the building and construction industry. In addition the construction industry pays one of the highest workers’ compensation premium rates – in 2001 alone approximately 0.5% ($267 million) of revenue would have to be allocated to the direct cost of 1998/99 compensations (Office of the Federal Safety Commissioner, 2006). Based on these statistics there is a need to measure and improve safety performance within the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Effective knowledge transfer can prevent the reinvention of systems and ideas as well as the repetition of errors. Doing so will save substantial time, as well as contribute to better performance of projects and project-based organisations (PBOs). Despite the importance of knowledge, PBOs face serious barriers to the effective transfer of knowledge, while their characteristics, such as unique and innovative approaches taken during every project, mean they have much to gain from knowledge transfer. As each new project starts, there is the strong potential to reinvent the process, rather than utilise learning from previous projects. In fact, rework is one of the primary factors contributing to construction industry's poor performance and productivity. Current literature has identified several barriers to knowledge transfer in organisational settings in general, and not specifically PBOs. However, PBOs significantly differ from other types of organisations. PBOs operate mainly on temporary projects, where time is a crucial factor and people are more mobile than in other organisational settings. The aim of this research is to identify the key barriers that prevent effective knowledge transfer for PBOs, exclusively. Interviews with project managers and senior managers of PBOs complement the analysis of the literature and provide professional expertise. This research is crucial to gaining a better understanding of obstacles that hinder knowledge transfer in projects. The main contribution of this research is exclusive for PBO, list of key barriers that organisation and project managers need to consider to ensure effective knowledge transfer and better project management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The growth of the Penaeus monodon prawn aquaculture industry in Australia is hampered by a reliance on wild-caught broodstock. This species has proven difficult to breed from if broodstock are reared in captivity. Studies were therefore carried out to investigate factors controlling reproduction and influencing egg quality. Results of the studies revealed that patterns of nutrient accumulation during early ovary development are altered by captive conditions, possibly contributing to reduce larval quality. The sinus gland hormones were shown, together with the environment, to regulate two stages of ovary development. In a separate study it was further revealed that the hormone methyl farnesoate (MF) could negatively regulate the final stages of ovary development. Lastly it was shown that broodstock reared in captivity are less likely to mate and that this is due to inherent problems in both the male and the female prawns.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this research the reliability and availability of fiberboard pressing plant is assessed and a cost-based optimization of the system using the Monte- Carlo simulation method is performed. The woodchip and pulp or engineered wood industry in Australia and around the world is a lucrative industry. One such industry is hardboard. The pressing system is the main system, as it converts the wet pulp to fiberboard. The assessment identified the pressing system has the highest downtime throughout the plant plus it represents the bottleneck in the process. A survey in the late nineties revealed there are over one thousand plants around the world, with the pressing system being a common system among these plants. No work has been done to assess or estimate the reliability of such a pressing system; therefore this assessment can be used for assessing any plant of this type.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is evolving in the Construction Industry as a successor to CAD. CAD is mostly a technical tool that conforms to existing industry practices, however BIM has the capacity to revolutionise industry practice. Rather than producing representations of design intent, BIM produces an exact Virtual Prototype of any building that in an ideal situation is centrally stored and freely exchanged between the project team, facilitating collaboration and allowing experimentation in design. Exposing design students to this technology through their formal studies allows them to engage with cutting edge industry practices and to help shape the industry upon their graduation. Since this technology is relatively new to the construction industry, there are no accepted models for how to “teach” BIM effectively at university level. Developing learning models to enable students to make the most out of their learning with BIM presents significant challenges to those teaching in the field of design. To date there are also no studies of students experiences of using this technology. This research reports on the introduction of Building Information Modeling (BIM) software into a second year Bachelor of Design course. This software has the potential to change industry standards through its ability to revolutionise the work practices of those involved in large scale design projects. Students’ understandings and experiences of using the software in order to complete design projects as part of their assessment are reported here. In depth semi-structured interviews with 6 students revealed that students had views that ranged from novice to sophisticate about the software. They had variations in understanding of how the software could be used to complete course requirements, to assist with the design process and in the workplace. They had engaged in limited exploration of the collaborative potential of the software as a design tool. Their understanding of the significance of BIM for the workplace was also variable. The results indicate that students are beginning to develop an appreciation for how BIM could aid or constrain the work of designers, but that this appreciation is highly varied and likely to be dependent on the students’ previous experiences of working in a design studio environment. Their range of understandings of the significance of the technology is a reflection of their level of development as designers (they are “novice” designers). The results also indicate that there is a need for subjects in later years of the course that allow students to specialise in the area of digital design and to develop more sophisticated views of the role of technology in the design process. There is also a need to capitalise on the collaborative potential inherent in the software in order to realise its capability to streamline some aspects of the design process. As students become more sophisticated designers we should explore their understanding of the role of technology as a design tool in more depth in order to make recommendations for improvements to teaching and learning practice related to BIM and other digital design tools.