394 resultados para Construction Industry Council
Resumo:
Tower crane dismantling is one of the most dangerous activities in the construction industry. Tower crane erection and dismantlement causes 10–12% of the fatalities of all crane accidents. The nature of the task is such that off-the-job training is not practicable, and the knowledge and expertise needed has to be gained on the job. However, virtual trainers such as Microsoft Flight Simulator for airplane pilots and mission rehearsal exercise (MRE) for army personnel have been developed and are known to provide a highly successful means of overcoming the risks involved in such on-the-job learning and clearly have potential in construction situations. This paper describes the newly developed multiuser virtual safety training system (MVSTS) aimed at providing a similar learning environment for those involved in tower crane dismantlement. The proposed training system is developed by modifying an existing game engine. Within the close-to-reality virtual environment, trainees can participate in a virtual dismantling process. During the process, they learn the correct dismantling procedure and working location and to cooperate with other trainees by virtually dismantling the crane. The system allows the trainees to experience the complete procedure in a risk-free environment. A case study is provided to demonstrate how the system works and its practical application. The proposed system was evaluated by interviews with 30 construction experts with different backgrounds, divided into three groups according to their experience and trained by the traditional and virtual methods, respectively. The results indicate that the trainees of the proposed system generally learned better than those using the traditional method. The ratings also indicate that the system generally has great potential as a training platform.
Resumo:
According to Tan et al. (2011), the establishment of a clear sustainability policy in the construction industry is paramount, if only as a statement of the commitment of the top management to protecting the environment and enhancing social responsibility. The resulting policies should then translate into proactive strategies and action plans that improve the sustainability performance of contractors and provide a competitive advantage by integrating “long-run profitability” with sustainable development efforts. The strategies should also take into account climatic protection issues through greenhouse gas emissions (GHGe) monitoring and reduction initiatives (Stocker & Luptacik, 2009)...
Resumo:
Unsafe acts of workers (e.g. misjudgment, inappropriate operation) become the major root causes of construction accidents when they are combined with unsafe working conditions (e.g. working surface conditions, weather) on a construction site. The overarching goal of the research presented in this paper is to explore ways to prevent unsafe acts of workers and reduce the likelihood of construction accidents occurring. The study specifically aims to (1) understand the relationships between human behavior related and working condition related risk factors, (2) identify the significant behavior and condition factors and their impacts on accident types (e.g. struck by/against, caught in/between, falling, shock, inhalation/ingestion/absorption, respiratory failure) and injury severity (e.g. fatality, hospitalized, non-hospitalized), and (3) analyze the fundamental accident-injury relationship on how each accident type contributes to the injury severity. The study reviewed 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011. The large number of accident samples supported reliable statistical analyses. The analysis identified a total of 17 significant correlations between behavior and condition factors and distinguished key risk factors that highly impacted on the determination of accident types and injury severity. The research outcomes will assist safety managers to control specific unsafe acts of workers by eliminating the associated unsafe working conditions and vice versa. They also can prioritize risk factors and pay more attention to controlling them in order to achieve a safer working environment.
Resumo:
The growing awareness of sustainability issues around the world has put extensive pressure on the construction industry to improve its sustainable practice. Sustainability principles need to be applied to not just during design and construction phase but the entire life cycle of a construction project. Compared to sustainability endeavours on earlier development phases, the pace to implement sustainability agenda during the operation and maintenance phase has not been as fast during past practices of facilities management (FM). Literature study suggests that sustainable practices in FM activities can bring substantial benefits such as reducing energy consumptions and waste, while increasing productivity, financial return and standing in the community. It also suggests several barriers which inhibit the implementation of sustainability in FM practices, including the lack of knowledge, discrepancy between capability and skills, and unwillingness of the FM personnel and organizations to adapt to new routines in order to implement sustainability in their business. The capabilities of FM personnel and organizations were regarded as the key enablers in managing sustainability knowledge. In a sustainable development context, capabilities are vital to the fostering of competency in an organization to innovate in a more sustainable way and support the agenda in an organization. Additionally, research which focused on people’s capabilities and skills is still lagging behind the efforts to develop guidelines, technical manuals and knowledge portals. Therefore, it is beneficial to explore the issues of capabilities in dealing with the implementation of sustainable practices in FM. This paper introduces a research project which is aimed at establishing a knowledge capabilities framework for promoting sustainability measures in FM practices. It will explore and highlight challenges to integrate sustainability as well as the personnel and organizational capabilities that are vital in dealing with knowledge issues in implementing sustainability agenda in FM practices. The expected outcome of this research has the potential to further sustainability endeavours in FM practices, while providing a useful source of knowledge to the FM personnel and organizations.
Resumo:
This report presents the results of the 2011 Australian road and bridge product innovation survey, the largest survey of its kind ever undertaken. The survey sample was defined as key organisations involved in the Australian road and bridge construction industry. The survey focused on four sectors across the road and bridge product supply chain: suppliers (comprising manufacturers and distributors), consultants (primarily engineering consultant firms), contractors (comprising head and trade contractors and subcontractors) and clients (state government road agencies). The sample comprised the four sectors in Queensland, New South Wales and Victoria.
Resumo:
Building Information Modelling (BIM) appears to be the next evolutionary link in project delivery within the AEC (Architecture, Engineering and Construction) Industry. There have been several surveys of implementation at the local level but to date little is known of the international context. This paper is a preliminary report of a large scale electronic survey of the implementation of BIM and the impact on AEC project delivery and project stakeholders in Australia and internationally. National and regional patterns of BIM usage will be identified. These patterns will include disciplinary users, project lifecycle stages, technology integration–including software compatibility—and organisational issues such as human resources and interoperability. Also considered is the current status of the inclusion of BIM within tertiary level curricula and potential for the creation of a new discipline.
Resumo:
To provide valuable industry information with human resource applications, this study aimed to identify the minimum level of competency required within organisations to manage occupational road risk. Senior managers from four Australian organisations participated in individual semi-structured interviews. These senior managers were responsible for a combined workforce of approximately 46,000 and a combined fleet of approximately 20,000. The managers assessed a list of 39 safety management tasks that had previously been identified as critical to the management of Occupational Health and Safety (OHS) performance within the construction industry. From this list the managers perceived that organisational personnel required competency in at least 14 of the safety tasks to meet a minimum standard of road risk management. Managers perceived that a full understanding of at least six of these tasks was critical. These six tasks comprised: hazard identification and control; providing OHS information and instruction; incident investigations; inspections of workplace and work tasks; researching and reporting on OHS issues and strategies; and applying legislative OHS requirements. It is hoped that the core competencies identified in this study may assist in the development of an internationally accepted competency framework for managing occupational road risks. This proposed competency framework could have many applications including guiding the design of job descriptions, training curriculums, and employee performance assessments. To build upon this study, the authors recommend future research be conducted to identify the key competencies required to manage occupational road safety across a broad range of organisational contexts.
Resumo:
Purpose - Critical scholarship on work-life balance (WLB) and its associated practices maintains that workplace flexibility is more than a quasi-functionalist response to contemporary problems faced by individuals, families or organisations. Beginning with Fleetwood’s contention that WLB discourses have become "detached" from their associated practices, this paper explores how workplace practices support or challenge dominant WLB discourses evident in socio-cultural, political and organisational sources. Design/methodology/approach - We analyse individual and group interview transcripts derived from 122 white-collar employees in two different organisational contexts (one public, one private) in the construction industry in Australia. Findings - Four major themes were identified in the data which illustrate discourse practice gaps. First, the demands facing this particular industry/ sector were framed as heightened and unique. Second, productivity was prioritised, dominating employees’ care-giving and lifestyle concerns. Third, employees’ caring responsibilities were communicated as personal and individual choices. Fourth, commitment and efficiency were judged on the basis of presence in the workplace. Research limitations/implications - Even in industries that have embraced WLB, workplace practices legitimate and reinforce the status quo, and maintain a gap between the promises of WLB and its potential to ameliorate conflict and assist workers to span the boundaries of paid work and other life domains. Originality/value - While the practices demonstrated in the research are focused on one industry, the study provides a critical analysis of how the contextually-influenced meaning of WLB is constructed, created and contested in these workplaces and the effects it produces.
Resumo:
What is the contribution of innovation brokers in leveraging research and development (R&D) investment to enhance industry-wide capabilities? The case of the Australian Cooperative Research Centre for Construction Innovation (CRC CI) is considered in the context of motivating supply chain firms to improve their organizational capabilities in order to acquire, assimilate, transfer and exploit R&D outcomes to their advantage, and to create broader industry and national benefits. A previous audit and analysis has shown an increase in business R&D investment since 2001. The role of the CRC CI in contributing to growth in the absorptive capacity of the Australian construction industry as a whole is illustrated through two programmes: digital modelling building information modelling (BIM) and construction site safety. Numerous positive outcomes in productivity, quality, improved safety and competitiveness were achieved between 2001 and 2009.
Resumo:
Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.
Resumo:
Value Management (VM) is a proven methodology that provides a structured framework using supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It offers an exceptionally robust approach to exploring the need and function of projects to be aligned with client’s objectives. The functional analysis and creativity phases of VM are crucial as it focused on utilising innovative thinking to understand the objectives of clients’ projects and provide value-adding solutions at the early discovery stages of projects. There is however a perception of VM as just being another cost-cutting tool, which has overshadowed the fundamental benefits of the method, therefore negating both influence and wider use in the construction industry. This paper describes findings from a series of case studies conducted at project and corporate levels of a current public funded infrastructure projects in Malaysia. The study aims to investigate VM processes practised by the project client organisation and evaluate the effects of project team involvement in VM workshops during the design-stage of these projects. The focus of the study is on how issues related to ‘upstream’ infrastructure design aimed at improving ‘downstream’ construction process on-site, are being resolved through multi-disciplinary team consideration and decision-making. Findings from the case studies indicate that the mix of disciplines of project team members at a design-stage of a VM workshop has minimal influence on improving construction processes. However, the degree of interaction, institutionalized thinking, cultural dimensions and visualization aids adopted, have a significant impact in maximizing creativity amongst project team members during VM workshop. The case studies conducted for this research have focused on infrastructure projects that utilise traditional VM workshop as client’s chosen VM methodology to review and develop designs. Documents review and semi-structured interview with project teams are used as data collection techniques for the case study. The significant outcomes of this research are expected to offer alternative perspectives for construction professionals and clients to minimise the constraints and strengthen strategies for implementing VM on future projects.
Resumo:
Purpose – Within the construction industry there is a growing awareness of the need for linking knowledge management (KM) to business strategy, organisational objectives and existing performance measures. This study was undertaken within the context of construction organisations, and attempts to provide the empirical evidence about the relationships between KM activities and organisational business performance. Design/methodology/approach – A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to investigate the opinions of construction professionals regarding the intensity of KM activities and business performance within their organisations. In parallel to the survey, semi-structured interviews were undertaken to provide qualitative insights that helped to clarify and deepen understanding of the KM process within the context of the research target. Findings – The investigation shows that knowledge utilisation is the strongest contributor to general business performance. In addition, the impact of KM activities on the lagging performance indicators of the Balanced Scorecard (BSC), such as “financial performance”, is in an indirect manner, and through the leading indicators such as performance from “internal process” as well as “learning and growth” perspectives. Originality/value – The study empirically establishes the linkage between intensity of KM activities and business performance, and demonstrates that KM strategies need to be explicitly formulated and measured according to organisational business objectives.
Resumo:
Research in construction innovation highlights construction industry as having many barriers and resistance to innovations and suggests that it needs champions. A hierarchical structural model is presented, to assess the impact of the role of the project manager (PM) on the levels of innovation and project performance. The model adopts the structural equation modelling technique and uses the survey data collected from PMs and project team members working for general contractors in Singapore. The model fits well to the observed data, accounting for 24%, 37% and 49% of the variance in championing behaviour, the level of innovation and project performance, respectively. The results of this study show the importance of the championing role of PMs in construction innovation. However, in order to increase their effectiveness, such a role should be complemented by their competency and professionalism, tactical use of influence tactics, and decision authority. Moreover, senior management should provide adequate resources and a sustained support to innovation and create a conducive environment or organizational culture that nurtures and facilitates the PM’s role in the construction project as a champion of innovation.
Resumo:
An emerging theme for a nation transiting into a sustainable future is the provision of a low carbon (dioxide) environment. Carbon emission reduction is therefore important for the industry and community as a whole. Buildings contribute immensely to total greenhouse gas emissions, so pragmatic actions need to be taken to cut the amount of carbon emitted by the construction industry. These typically involve strategies such as energy-saving features in the design, construction and operation of building projects. However, a variety of characteristics of the markets and stakeholders involved are suppressing their development. This paper reports on a series of interviews with a variety of Hong Kong construction project participants aimed at identifying the drivers of, and obstacles to, the construction industry's attempts to reduce carbon emissions. The results confirm the main actions currently undertaken are energy efficiency enhancement, green procurement, research and development activities, waste/water management and other technical measures such as the provision of thermal insulation. The majority of the drivers are economical in nature, suggesting that financial aids, and particularly government incentives, are likely to be useful motivators. Also suggested is the increased promotion of the benefits of environmental sustainability to the wider community, in order to alert the general public to the need for reducing the amount of carbon originating from building usage.
Resumo:
An evolution in the use of digital modelling has occurred in the Queensland Department of Public Works Division of Project Services over the last 20 years from: the initial implementation of computer aided design and documentation (CADD); to experimentation with building information modelling (BIM); to embedding integrated practice (IP); to current steps towards integrated project delivery (IPD) including the active involvement of consultants and contractors in the design/delivery process. This case study is one of three undertaken through the Australian Sustainable Built Environment National Research Centre investigating past R&D investment. The intent of these cases is to inform the development of policy guidelines for future investment in the construction industry in Australia. This research is informing the activities of CIB Task Group 85 R&D Investment and Impact. The uptake of digital modelling by Project Services has been approached through an incremental learning approach. This has been driven by a strong and clear vision with a focus on developing more efficient delivery mechanisms through the use of new technology coupled with process change. Findings reveal an organisational focus on several areas including: (i) strategic decision making including the empowerment of innovation leaders and champions; (ii) the acquisition and exploitation of knowledge; (iii) product and process development (with a focus on efficiency and productivity); (iv) organisational learning; (v) maximising the use of technology; and (vi) supply chain integration. Key elements of this approach include pilot projects, researcher engagement, industry partnerships and leadership.